해외건설사업 수주 원인분석을 통한 수주경쟁력 향상 방안에 관한 연구 (The study on Plans of Improvement of Order Competitiveness through the Analysis of Order Causes in Overseas Construction Projects)

  • 양재우;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.14-15
    • /
    • 2020
  • The circumstances of overseas construction market is developing into quite complicated and diversified trends. Construction circumstance is escaping from localization to the open competitions, and from developing countries focused to the resources developing countries. Thus, new strategies for order competitiveness improvement based on our know-hows are required to secure the order volumes. This study has analyzed domestic construction companies' order trends in overseas construction market, and proposed strategic plans through analyzing of Order Causes on overseas construction projects to improve the order competitiveness.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

공격적인 수주행위가 건설기업의 하자발생에 미치는 영향 - 재무적 접근을 이용한 실증분석 - (The Effect of Aggressive Order Intake on Defect of Construction Companies - Empirical Analysis Using Financial Approach -)

  • 박홍조;안성훈
    • 한국건축시공학회지
    • /
    • 제21권2호
    • /
    • pp.149-156
    • /
    • 2021
  • 본 연구는 도급공사의 공격적인 저가 수주로 인한 공사비 부족을 만회하기 위해 설계변경 등 자구책이 뒤따르게 되고, 이러한 과정에서 시공상의 하자가 유발될 수 있다는 점에 대하여 재무적 자료를 이용하여 실증분석하는 것을 목적으로 한다. 연구 결과, 공격적인 수주행위로 인한 수주량의 비상적인 증가와 영업이익률 등 수익성 악화는 공사 품질의 저하와 하자 발생으로 이어진다는 것을 확인하였다. 또한 시공눙력이 낮거나 공사 착공 후 설계나 계약 조건을 변경하는 경우 하자발생의 직접적인 원인이 된다는 것도 확인하였다. 공격적인 저가 수주와 하자 발생 사이의 관련성을 확인함으로써, 하자발생을 방지할 수 있는 방안을 마련하는 계기가 될 수 있다.

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권4호
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 - (A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage -)

  • 박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권1호
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

공사비 유형의 유치권 소송에 대한 중·소기업 건설업체 사례분석 (Case Study of Small and Medium-Sized Construction Firms on the Cost Type Lien Suits)

  • 윤하정;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2011
  • Mainly in construction liens to four contractors do not receive your order is caused by construction. This construction does not receive construction compunction to protect the contractor, I guess. On the other hand, the medium and small construction companies and contractors that could threaten the order four can be a problem. In this study, small construction companies to the lien of the lien claim on the issue of case studies have looked for the study. Small construction companies, in your case through the litigation between the lien of the lien litigation perspective, the cause of four orders after the analysis step by step construction was listed in chronological order. Identifying problem was the result of a lien. This study to previous studies regarding the lien on the issue through case studies of one kind of lien was derived for the problem. A follow-up studies and more case studies and interviews are considered necessary in the study.

  • PDF

건설현장의 안전보건 주요 현안과 개선 방안 (Main Problems and Suggestions on Occupational Safety and Hygiene in Construction Sites)

  • 심규범
    • 한국산업보건학회지
    • /
    • 제22권4호
    • /
    • pp.329-336
    • /
    • 2012
  • Objectives: The aim of this study is to analyze main problems on occupational safety and hygiene in construction sites and to suggest some improvement methods. In order to decrease industrial accidents, I emphasize the approach paradigm shifts according to characteristics of construction workers. Methods: Pointing out the irrationality of current institutions by comparing bad outcomes of occupational safety and hygiene in construction industry and characteristics of construction workers. Results: In order to decrease industrial accidents, we need some approach paradigm shifts; the supply method of industrial safety and health fundamentals on the construction industry level, the accident rate calculation by using the actual construction workforce instead of an estimation, institutionalizing the prevention efforts themselves for industrial accidents, securing enough production costs for the precondition of occupational safety and hygiene in construction sites. Conclusions: I ascertain the need of the approach paradigm shifts for decreasing industrial accidents in the construction industry.