• Title/Summary/Keyword: Construction Operation Building Information Exchange(COBIE)

Search Result 3, Processing Time 0.019 seconds

A Study on the Feasibility of COBie to the Wastewater Treatment Plant (COBie 기반 하수처리시설 유지관리시스템 구축)

  • Choi, Jae-Ho;Um, Dong-Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.273-283
    • /
    • 2014
  • With the introduction of COBie (Construction Operation Building Exchange) in BIM technology enabling an automatic transfer of design and construction information to operation and management (O&M) phase, the BIM centric O&M management system development process has been tested on the subject of architectural types of building. However, for now, there is a need to investigate the technical feasibility of COBie application to civil structures including industrial facilities. This study takes both "O&M Guideline for Public Wastewater Treatment Plant" and a real wastewater treatment plant into account for the purpose, in which the latter is intended to supplement the result of the first. The findings are three-folds: (1) COBie, as an asset modeling, is not sufficient enough to encompass commissioning data, (2) more relevant IFC development and family library build-up useful to modeling wastewater treatment plant is imperative, and (3) well-planned coordination and organization of COBie data-set in line with O&M practice will enhance the feasibility of the COBie in industrial facilities. The result could be used for a basis study for COBie application, particularly in industrial facilities.

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

Analysis of Modeling Errors for BIM-based Facility Management Systems (BIM기반 시설물유지관리시스템을 위한 모델링 오류 분석)

  • An, Hyokyung;Lee, Seulki;Yu, Jungho;Son, Bosik;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.35-45
    • /
    • 2013
  • Facility Management is the longest in the building of life cycle. Because it occupies more than 80% of cost, the phase of Facility Management has to be managed and has to be perceived as important as design and construction phase. The method to manage building more efficiently is the introduction of Facility Management System used by CAD and database. But information Requirement is now input by hand in the most Facility Management System. This study aims to analyze the example of applying BIM in the Korea or abroad and the errors of this were deducted by many phase. Lastly, the possible solution is suggested in order to be used in the Facility Management System. This study's benchmarking is COBIE which is developed by the COE(Corps of Engineers) and now popular in the world. The suggestion in this study is the method that I have already mentioned is helpful for a designer to do modeling when a designer uses BIM S/W(software). To be more specific, the method plays a side role in helping data input considering the phase of Facility Management.