• Title/Summary/Keyword: Construction New-technology

Search Result 1,871, Processing Time 0.031 seconds

BIM-Based New Construction Technology Database Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM 기반 건설신기술 데이터베이스 구축)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.163-164
    • /
    • 2023
  • The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.

  • PDF

A Study on Science and Technology Policy Analysis in the field of Construction and Transportation R&D in Korea

  • Lee, Jongwon
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.332-336
    • /
    • 2017
  • The field of construction and transportation R&D has been increased and improved wih the integration into the ICT. With the rapid trend changes like the Fourth Industrial Revolution, new direction and solution of R&D policy is being explored to prepare for the convergence era with other diverse research areas. In order to present new direction, it is necessary to analyze the external environment influencing construction and transportation field. In this regard, this study analyzes the science and technology policy plan and goal in Korea. In conclusion, through the policy analysis, this study suggests new direction of construction and transportation R&D in Korea.

  • PDF

Status and Direction of Research and Development in Construction Industry (건설기술 연구개발 현황 및 발전 방향)

  • Yu, Jung-Ho;Hong, Young-Tak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.80-86
    • /
    • 2006
  • Continuous development of construction industry and enhancement of its global competitiveness must be supported by research and development(R&D) for new technology. However, the R&D investment in Korean construction industry is lower than those in other industries. The R&D investment by Korean government is also insufficient comparing with other governments. This paper investigates the R&D investment status in Korean construction industry and reviews the outcomes of the R&D in relation with construction new technology and patent. Based on the investigations of the present status, new direction of the construction R&D is suggested.

  • PDF

The Research and Application of Innovative High Efficient Construction Technologies in Super High Rise Steel Structure Building

  • Dai, Lixian;Liao, Biao
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.205-214
    • /
    • 2014
  • The super high rise building construction is characterized by a large quantity of engineering works and structural components, high demanding of construction technology and complex cross operations. As the height of super high rise building increases, the construction difficulties increase, it is challenging the steel structural building construction technology. In this paper, the key technologies in the construction of Chinese modern super high rise steel structure building have been studied. The innovative tower crane supporting frame suspension disassembly technology has been developed to allow the crane supporting frame to turnover in the air without occupying materials stockyard. A new self-elevating platform technique which is capable of striding over structural barriers has been developed. This new technology allows the platform to be self-elevated along variable cross section column with a maximum 600 mm size change. A new automatic submerged arc welding technology has also been developed to ensure the process continuity and quality stability of welding job on the construction site.

Improvement Plan for the Payment Standard of Rental Fee in Construction New Technology (건설신기술 사용료 지급기준 개선방안)

  • Park, Hwan-Pyo;Oh, Un-O
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.193-201
    • /
    • 2006
  • The Evaluation system of Excellent Construction Technology has been operated for 15 years from 1990 in Korea. 443 technologies have been certified as Excellent Construction Technology(ECT) and those ECTs are adapted over 20,000 times into the construction projects. As a result of investigation, new technology evaluation system became a stable stage because new technology evaluation system has assigned about 433 and also applied more than 20,000 times in construction sites in 2004. However, it was indicated to a large problem that there aren't still detail criteria of cost assessment for using ECTs. Therefore, we analyzed the status and problems of the cost of using ECTs and suggested some useful ideas which are reviewed by various aspects. Specially we suggested specified criteria for the cost assessment of using ECTs. It is based on the scheduled construction cost and determined the rate $({\bullet}{\cdot})$ of using ECTs. To adapt ECTs into construction projects nationwide not only it is very important to certify better new technologies but also it is required to make the criteria of cost assessment for using ECTs.

A Review on New Non-hybrid Technologies to Improve Energy Efficiency of Construction Machineries (건설기계의 에너지 효율 제고를 위한 비-하이브리드 신기술에 관한 리뷰)

  • Joh, Joong Seon
    • Journal of Drive and Control
    • /
    • v.13 no.3
    • /
    • pp.53-66
    • /
    • 2016
  • New non-hybrid approaches to improve energy efficiency of construction machineries are reviewed in this paper. Hydraulic systems are classified into four classes according to Backe's classification and commercially promising new technologies are carefully chosen in each class. IMV, 3-Line CPR, Closed Circuit Displacement Control of Differential Cylinder, and Throttle-less Secondary Control are chosen as representative non-hybrid new technologies. Key principle of each technology is explained and representative references which run through each technology are selected. Advantages and weaknesses of each technology are discussed and compared from the view point of construction machinery manufacturers.

A study on activation plan of development of the advanced construction technology (건설신기술 개발의 활성화 방안에 관한 연구 - 전문건설업체를 중심으로 -)

  • On Seong-Won;Park Hyeon-Yong;Lee Young-Hwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.490-493
    • /
    • 2004
  • The domestic construction industry need to do productivity improvement through technology development than improvement of manpower control or system and develop competitive power through technology in international construction market. Upon this, government for elevation of technological level enacts and operates the advanced construction technology endorsement system but is not looking at effect as that the actual use-results also expected first. Therefore, in this paper, present improvement and direction for activation plan of construction new technology development through comparison with other connection system, literature investigation and questionnaire after grasp present condition of the advanced construction technology endorsement system with specialty construction company as the central figure which occupy most of appointed new technology.

  • PDF

FUZZY-BASED APPROACH FOR EVALUATING THE PERFORMANCE OF A NEW TECHNOLOGY IN CONSTRUCTION SITES

  • Sung-Woo Yang;Tae-Hoon Kim;Ung-Kyun Lee;Wi-Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1248-1253
    • /
    • 2009
  • Although there have been many efforts to reduce accidents on construction sites, such accidents continue to occur. New technologies have recently been developed to improve safety and their performance needs to be evaluated to determine their suitability prior to the application. The assessment for safety performance mainly is conducted depending on qualitative and subjective judgment of supervisors. However, there are rarely proper approaches to assess such qualitative measures. Therefore, we propose a fuzzy-based approach to assessing the performance of a new technology. The assessment of a new technology, called a mobile detector (MD), was carried out as a case study. The output is compared with those by a numerical simulation. As a result, the fuzzy-based performance assessment is shown to be appropriate for this evaluation.

  • PDF

Importance of Construction Sequence in Numerical Modeling for Underground Structure

  • Park, Yang-Hoo;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • v.9 no.1
    • /
    • pp.21-26
    • /
    • 2016
  • When excavation under existing structure is planned for a new construction project, the underpinning method is one of the most applicable construction methods. This study introduces a new modified underpinning method which is applied to construct a new subway line in Seoul Metropolitan. The new subway line was designed to pass underneath the existing subway line. Existing subway line carries about 2 million passengers daily, which is 33% of total passengers using subway in Seoul, and is the only circulation line in Seoul. Subway trains are passing 540 times through this section in a day. By applying a new underpinning method, the subway box structure of line is exposed 54m in the air supported by bearing piles. The proposed method was carefully monitored using heavy instrumentation system during construction. This study proposed and verified the application of the modified underpinning method, which can reduce construction period by 1.5 times and the construction cost by 1.2 times comparing with conventional method. The importance of considering construction sequence is investigated and verified by analyzed data non-considering construction sequence. The unexpected heaving which can bring up a dangerous situation for train running stability were measured, so this study shows that the upward movement has to be analyzed in designing process. As the use of underground space increases, the proposed method can be a good example of underground development.

Analysis of stability control and the adapted ways for building tunnel anchors and a down-passing tunnel

  • Xiaohan Zhou;Xinrong Liu;Yu Xiao;Ninghui Liang;Yangyang Yang;Yafeng Han;Zhongping Yang
    • Geomechanics and Engineering
    • /
    • v.35 no.4
    • /
    • pp.395-409
    • /
    • 2023
  • Long-span suspension bridges have tunnel anchor systems to maintain stable cables. More investigations are required to determine how closely tunnel excavation beneath the tunnel anchor impacts the stability of the tunnel anchor. In order to investigate the impact of the adjacent tunnel's excavation on the stability of the tunnel anchor, a large-span suspension bridge tunnel anchor is utilised as an example in a three-dimensional numerical simulation approach. In order to explore the deformation control mechanism, orthogonal tests are employed to pinpoint the major impacting elements. The construction of an advanced pipe shed, strengthening the primary support. Moreover, according to the findings the grouting reinforcement of the surrounding rock, have a significant control effect on the settlement of the tunnel vault and plug body. However, reducing the lag distance of the secondary lining does not have such big influence. The greatest way to control tunnel vault settling is to use the grout reinforcement, which increases the bearing capacity and strength of the surrounding rock. This greatly minimizes the size of the tunnel excavation disturbance area. Advanced pipe shed can not only increase the surrounding rock's bearing capacity at the pipe shed, but can also prevent the tunnel vault from connecting with the disturbance area at the bottom of the anchorage tunnel, reduce the range of shear failure area outside the anchorage tunnel, and have the best impact on the plug body's settlement control.