• Title/Summary/Keyword: Construction Marine terminal structure

Search Result 2, Processing Time 0.017 seconds

A Study on Duty Competency and Utilizing Package Development for Construction of Marine Terminal Structure (해양터미널구조물설치분야 직무능력 및 활용패키지 개발에 대한 연구)

  • PARK, Jong-Un;KANG, Beodeul;BAEK, In-Hum
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.2
    • /
    • pp.456-464
    • /
    • 2016
  • NCS development for construction of marine terminal structure was carried out through following procedures such as analysis on characteristics, analysis on duty, development of the first draft for standards, validation of industry sites, duty competency standards through expert committee, and utilizing package. The results were as follows. Firstly, duty competency was classified as levels from 3 to 7. Educational training institutions were followed by 22 universities, 21 colleges, 16 graduate schools, and 10 high schools. Secondly, developed standards were consisted of duty and competency unit. The name of duty was construction of marine terminal structure and competency units were consisted of 9 items as survey on economic effect, evaluation of conditions on construction environment, plan for construction of structure, construction of transfer, mooring, and power equipment, and construction, startup test, and maintenance of terminal structure. 33 competency unit elements below 9 competency units were developed. Thirdly, utilizing package was developed into 3 areas of life-long career path, training criteria, and guidelines for exam according to national competency standards for in order to develop development of labor's career and perform personal management such as hiring and promotion in industry sites.

Evaluation of Areas and Routes for Construction of a Hub & Spork System for Costal Passenger Ships Using the AHP Method (AHP법을 이용한 연안여객선 지간선 체계 구축 권역 및 항로 평가)

  • Jang, Woon-Jae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.1
    • /
    • pp.33-39
    • /
    • 2017
  • This study identified a candidate area and route for construction of a hub & spork system for coastal passenger ships. For this purpose, the characteristics of the hierarchy structure of other transportation and the operating system of coastal passenger ships were analyzed. Evaluation factors for selecting alternative areas and routes for the construction project were then extracted. Secondly, the relative importance of these evaluation factors for alternative routes were calculated using the Analytic Hierarchy Process (AHP) method. Finally, the importance of these evaluation items and quality of the alternative areas and routes were considered to select a primary candidate area and route. Therefore, four evaluation items such as the number of passenger-ship routes, the number of passengers, the number of cars, and the number of residences were extracted, and the Mokpo area was selected as the target area. In addition, four evaluation items such as he number of islanders, the number of local governments, geographical conditions and passenger ship operators were extracted, and the Yeonggwang route was selected as priority candidates for this construction project. Meanwhile, for the expansive implementation, step-by-step promotion is needed along with the expansion of terminal facilities, the securing of large ships, and the introduction of a semi-public system for coastal passenger ships.