• Title/Summary/Keyword: Construction Management Professional

Search Result 247, Processing Time 0.027 seconds

Management and Operation of Apartment Community Facilities and Post Occupancy Evaluation - Focused on the R Apartments Complex in Daegu - (아파트 단지 내 커뮤니티 시설의 운영 실태와 거주 후 평가 - 전문관리자 운영의 대구 R아파트 단지를 중심으로-)

  • Kang, Soon-Joo
    • Journal of the Korean housing association
    • /
    • v.21 no.4
    • /
    • pp.111-120
    • /
    • 2010
  • This study examines the effectiveness of a new community facility operation and management system that were implemented by one of the major construction companies. This system was an unprecedented approach in a sense that it provided not only necessary facilities but also a specialized management staff, an operational manual, and a subsidy for various programs. According to POE conducted among the residents, it can be concluded that the residents' satisfaction will be increased under the following conditions; 1) when a program manual associated with the community facility is provided, 2) when there is a professional staff who can coordinate various programs effectively, 3) when the facilities are well designed in accordance with the program requirements, 4) when the users adhere to regulations and management standards, 5) when all three components- i.e. facility, people and programs- are well coordinated, and 6) when affordable user fees are charged. This research assures that professional management staff and well-planned management system play a significant role in the enhancement of the residents' satisfaction as well as vitalizations of the community.

IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

A Study on the Effect of the Application of Safety Patrol Management System(SPMS) upon the Worker's Way of Thinking & Disasters in Construction Site (전문 안전 순찰 관리시스템(SPMS)이 건설 현장의 재해 및 근로자의 의식구조 변화에 미치는 영향에 관한 연구)

  • Yoon, Yeo-Chan;Chung, Kwang-Seop;Kim, Young Il;Kim, Ji-Hoon;Kim, Sung-Min
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.31-40
    • /
    • 2014
  • While Korea had achieved radical growth of construction industry, it also had accumulated problems in material, human and economical loss due to its low quality of safety level. Therefore, not only enterprises but also the nation is putting in a great deal of efforts for construction safety. However, its effect is not satisfiable. This research aims for change of construction cite by introduction of professional Safety Patrol Management System(SPMS) and consideration of its necessity. To consideration of its necessity, we compared and anaylzed average numbers of indicated dangers and safety accident incidences in each construction cites and we researched changes in worker's safety sense. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.

The Countermeasure for improvement of Construction Safety Management (건설 안전관리의 현황과 발전방향 - 건설공사 관리의 개선방안)

  • 박무일
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.33-40
    • /
    • 2001
  • Predict-Plan-Do is the main point to settle Safety management well, but we have neither Predict nor Plan. So just like the system of English CDM is necessary to be adapted in construction work which makes them work in full responsibility by clarifying the responsibility located step by step from planning to designing & constructing-To adapt this system needs more money for Safety than now, but this system makes companies earn maximum confidence & profit by accident prevention. Furthermore leads the nation and the society to earn large profit, then open the road to Welfare State. If you sees only the things such as money, profit, etc before your eyes, no more safety remains. That means no more respect of persons and no more welfare state.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

A Railway Construction Efficiency Plan by Using Project Management Information System (프로젝트정보관리시스템을 활용한 철도공사 효율화 방안)

  • Lee, Tai-Sik;Park, Jang-Hee;Kim, Young-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1532-1537
    • /
    • 2004
  • Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.

  • PDF

Supply-Demand Forecasting of Principal Engineers in Construction Industry Using System Dynamics (시스템 다이내믹스를 활용한 건설 특급기술자 수급전망)

  • Kim, Sung-Tae;Lee, Hyun-Soo;An, Sun-Ju;Ryu, Han-Guk;Park, Moon-Seo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.161-172
    • /
    • 2007
  • By prosperous condition of construction economy in the early 90s in Korea, the government needed a lot of the qualified professional engineers (PE) to manage the construction site. In order to meet the high demand of P.E., Government has established the admitted engineer systems(AES) in 1995 that give the authority of principal engineers to the admitted engineers who do not take the written examination but have equivalent working experience. Since 2000, professional $engineer^{\circ}{\phi}s$ shortage has been resolved. however, the opposite situation, which is serious over-supply of construction engineers has occurred. Thus, Government announced that would abolish the admitted engineer systems as recognized the existent admitted engineers(about 1,000,000 persons) from 2007. However, Professional Engineers Institution has strongly insisted that Government should not recognize existent admitted engineers. From this point of view, it is critical to make the supply-demand forecast systems as a derivative approach of System Dynamics also, that is useful in comparing the argument between Government and Professional Engineers Institution. This paper describes about principal $engineer^{\circ}{\phi}s$ supply change by admitted engineer system abrogation and suggests the idea to regulate the supply and demand with the improvement of the regal system.

Program Management (신축 인천국제공항 건설현장을 중심으로)

  • 송기석
    • Journal of the Korean Professional Engineers Association
    • /
    • v.30 no.6
    • /
    • pp.68-76
    • /
    • 1997
  • 대규모적이며 복잡한 공공시설사업의 이행은 재정, 계획, 설계 기타 거대한 상호 연계 Pro-ject의 건설을 통합하기 위한 정선된 절차와 규정이 필요하다고 하겠다. 요즈음 우리 나라의 건설산업기본법에 "건설사업관리(CM)"라는 새로운 건설계약 업종이 대두되면서 실질적인 건설산업현장에서 관리기법의 정의와 다양성을 살펴 볼 필요성이 요구되는 차제에 세계 제7차 "Civil and Building공학의 컴퓨터화"란 주제로 1997년 8월 19~22일 Sheraton Walker Hill 호텔에서 열렀다. 이 대회에서 상기 인천국제공항 건설에 참여한 Parsons Overseas Company의 PE인 Steven B Cornell이 발표한 인천국제공항건설의 Program Management 운영을 간추려 소개한다. 이 Program Management 설명에서 Pro-gram Management(PmMt), Project Mana gement(PM), Construction Management(CM) 등의 정의과 차별성의 파악 및 p. M. 0(Program Management Oversight)의 기능과 역할을 파악할 수 있을 것이라고 판단된다. 파악할 수 있을 것이라고 판단된다.

  • PDF

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF