• Title/Summary/Keyword: Construction Management Professional

Search Result 247, Processing Time 0.023 seconds

An Awareness Analysis on the Design for Safety of Construction Project and Its Improvement Measures (건설프로젝트의 설계안전성 검토에 대한 인식 분석 및 개선방안)

  • Shin, Won-Sang;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.351-359
    • /
    • 2019
  • Recognizing that the fundamental cause of construction safety accidents was a lack of safety management activities in the planning and design phases, the government made the Design for Safety (DFS) system mandatory in May 2016. However, awareness among ordering parties and designers regarding this system is significantly low, and the system has not been properly established due to reasons such as the need for additional work and a lack of professional manpower. In this study, the awareness of ordering parties and designers of the DFS system was analyzed through a survey, various problems in DFS work execution were identified and measures for improvement were presented. Measures to improve the efficiency in DFS work execution involve the discovery of risk factors and establishment of countermeasures, and here the establishment of a DFS work support system that enables the sharing of information between institutions is the most urgent priority. In addition, it is also urgently necessary to establish a dedicated organization in charge of DFS work, cultivate professional manpower, develop the relevant education programs and establish a proper cost calculation standard for DFS work execution by design offices.

A Study on the Consulting System for Establishing Public Library (공공도서관 건립.운영 컨설팅 서비스 구축 방안에 관한 연구)

  • Kim, Se-Hun;Sim, Hyo-Jung
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.43 no.1
    • /
    • pp.87-111
    • /
    • 2009
  • In order to fortify a professional approach in the construction of libraries, this study investigates library establishment procedures and examines problems which are raised in them. In so doing, it points to the necessities of professional consideration and engagement in the library construction and underlines a role of central government to support the process. As a way of supporting library construction, it suggests a consulting system which can provide practical support to those who are involved in the library establishment process.

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

Analysis of Students' Perception of Landscape Construction Education (조경시공과목 교육에 대한 학생들의 인식 분석)

  • Park, Jae-Young;Kwon, Jin-Wook
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.4
    • /
    • pp.92-103
    • /
    • 2017
  • As a professional occupation, landscape education focuses on fostering professional human resources and is one of the major axes of the landscape industry. In this study, a survey of landscape students on their learning and pedagogics was conducted with the aim to present basic information for the improvement of teaching on landscape construction. A total of 348 people answered 14 questions in the category of the impression of landscape construction classes included in the questionnaire. The results showed that the students found landscape construction classes academically important and recognized the necessity for completing these classes, but they were not satisfied with the learning environments and pedagogics used in these classes. They found what they learned not readily applicable to actual practice and saw these classes as part of their preparations for the landscape engineer qualification test. Their demands in relation to the classes included field practice-oriented teaching and participation in various programs for field practice, which highlights the necessity for human resource management-oriented classes that cover planning, design, construction, and management. Challenges in relation to field practice included the provision of environment, for example offering a variety of opportunities and improving treatment in practice. This study has significance in that it analyzed the views of students and discussed directions for future improvement since there is a lack of studies and discussions about education in the field of landscape construction. This study also has a limitation that only four-year universities were included in the study. Comprehensive studies including investigating junior college and graduate school curricula and case studies of landscape construction curricula overseas are needed in the future.

A Suggestion of Claims Preparation Procedure in the Public Sector (공공건설사업에서 업무단계별 클레임준비 절차)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.54-62
    • /
    • 2001
  • Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.

  • PDF

Analysis of Macpa Stress Index and Work Ability Index on Subway Construction Workers (도시철도 건설종사자의 맥파 스트레스 지수와 작업능력 지수 분석)

  • Chae, Joung Sik;Lee, Jong bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.58-62
    • /
    • 2022
  • Metro subway construction is a field that requires a great deal of professional manpower. The aging of professionals has a negative impact on both productivity and health, owing to poor working environments, heavy lifting, underground work, and other factors. To address this issue, the government is progressively revising and enforcing health management law and regulation in the construction industry. Thus, the job stress and work ability of many professional subway construction workers, who are rapidly aging, are being analyzed to ensure their safety and improve their health. In this study, the Macpa stress index of Busan Metro Subway construction workers from Sasang to Hadan line was measured by using a Macpa measurement machine, and a work ability survey was conducted by using the questionnaire that was developed by the FIOH. The independent variables were age, years of service, job position, employment type, and occupation. While, the dependent variables were the Macpa stress index and work ability. The Kruskal-Wallis test was used because it was difficult to assume that the statistics of this study represented a normal distribution. The results showed that age, job position, and employment type affected Macpa stress index and revealed that as the age of the workers increased, their stress levels increased as well. Additionally, job position and employment type affected the work ability of the metro subway construction workers. In terms of job position, the technical engineers were under a lot of stress, and whereas the managers had the best work ability. The technical engineers were more stressed than the other workers because of a poor working environment. In terms of employment type, daily workers were under more stress and lower work ability than others.

An Empirical Study on Importance of Evaluation Factors for Improvement of Fire Emergency Medical Service (소방응급의료서비스 향상을 위한 평가요인의 중요도에 관한 실증적 연구)

  • Hwang, Dong-Wan;Kwon, Young-Hee;Kim, Jeon-Soo;Kang, Yun-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.71-80
    • /
    • 2014
  • This study is performed to determine the priorites of the evaluation factors for the improvement of fire emergency medical service by increasing it's efficiency to protect the people's lives effectively, and by recognizing it's mid-long term development. Based on the output of the analysis, the critical evaluation factors of the fire emergency medical services to be improved shall be identified, and shall be intended to use strategically for increasing the efficiency of all the activity in the EMT service, and also for providing the basic date to product and manage the good quality services. To calculate the priority of the evaluation factor for each level as shown on this study, AHP(anaysis hierarchy process) with pairwise comparison method is applied. According to the priority analysis for the evaluation factors in main category (evaluation zone), 'medical service professional aspect' is recognized as highest one, and 'service infrastructure aspect', 'service management aspect' are indicated in order. According to the priority analysis for the evaluation factors in evaluation index, 'professional personal arrangement' in the service infrastructure aspect, 'appropriateness and timeliness of emergency medical care' in the medical service professional aspect, and 'clinical training' in the service management aspect are respectively recognized as most important factors.

Analysis of Factor Affecting for Improving Construction Engineering Market

  • Park, Junho;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.450-453
    • /
    • 2015
  • The Construction Engineering Industry (CEI) is construction field based on professional knowledge, staff and information service, and is distinguished by construction activity. The contemporary CEI market has extended globally and diversified construction work classifications. International construction engineering companies now have an important economic and social effect. Over the last five years (2009 to 2013), the top-200 global engineering firms reported global revenue that grew from 54.4 billion to 71.5 billion, about 27% growth (ENR, 2014). Countries such as the U.S.A., Canada, those in Europe (Several developed countries, i.e., United Kingdom, Netherlands, France, Spain, France, Italy, and Spain), Australia, Japan, China, and Korea comprise the bulk of world construction engineering revenue. Although the construction engineering market continues to grow, much of the work is limited to Europe, mid-Asia, and Asia. Additionally, specific construction types are focused on building projects, industrial plants, and refining plants. As such, there are imbalances in the construction engineering market and some market saturation. Further, there is heavy competition and the construction engineering market may shrink in the future. This paper analyzed various factors affecting the construction engineering market, specifically looking at construction classifications and factors related to a global market. To accomplish this, we collected to data from Engineering News Record (ENR) and recast each variable. And we used nonparametric statistics because the number of cases were small, making it difficult to assume a case's population parameter. Then we tested with the Kruskal-Wallis test and drew results. The results indicate that concentration in particular construction types and extending global regional markets will be have a positive effect on the overall global construction engineering market..

  • PDF

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

A study of Construction Management for the Application to the Residential Environment Improvement Project (주거환경정비사업에서의 건설사업관리 적용 방안 연구)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.89-97
    • /
    • 2006
  • With the increased demand on housing quality and effective urban redevelopment, a new paradigm in reconstruction project is in need. Especially, the Urban and Residential Environment Improvement Law which initiated on July 1, 2003 has become a significant turning point. This code is expected to function as a consistent and systematic measure. This study will examine the code's major concepts and methods to progress reconstruction projects effectively. The application of construction management is examined carefully since the new code requires renewal project consulting firms to function as a professional complement rather than simply perform administration work, as in the past. Also, construction managing methods that can be related to renewal project consulting are examined and speculated. Lastly, methods to improve efficiency in reconstruction projects are introduced through case study and analysis on applicability and expected results.