Journal of the Korea Institute of Building Construction
/
v.19
no.4
/
pp.351-359
/
2019
Recognizing that the fundamental cause of construction safety accidents was a lack of safety management activities in the planning and design phases, the government made the Design for Safety (DFS) system mandatory in May 2016. However, awareness among ordering parties and designers regarding this system is significantly low, and the system has not been properly established due to reasons such as the need for additional work and a lack of professional manpower. In this study, the awareness of ordering parties and designers of the DFS system was analyzed through a survey, various problems in DFS work execution were identified and measures for improvement were presented. Measures to improve the efficiency in DFS work execution involve the discovery of risk factors and establishment of countermeasures, and here the establishment of a DFS work support system that enables the sharing of information between institutions is the most urgent priority. In addition, it is also urgently necessary to establish a dedicated organization in charge of DFS work, cultivate professional manpower, develop the relevant education programs and establish a proper cost calculation standard for DFS work execution by design offices.
Journal of the Korean Society for Library and Information Science
/
v.43
no.1
/
pp.87-111
/
2009
In order to fortify a professional approach in the construction of libraries, this study investigates library establishment procedures and examines problems which are raised in them. In so doing, it points to the necessities of professional consideration and engagement in the library construction and underlines a role of central government to support the process. As a way of supporting library construction, it suggests a consulting system which can provide practical support to those who are involved in the library establishment process.
Journal of the Korea Institute of Building Construction
/
v.2
no.1
/
pp.147-154
/
2002
In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.
Journal of the Korean Institute of Landscape Architecture
/
v.45
no.4
/
pp.92-103
/
2017
As a professional occupation, landscape education focuses on fostering professional human resources and is one of the major axes of the landscape industry. In this study, a survey of landscape students on their learning and pedagogics was conducted with the aim to present basic information for the improvement of teaching on landscape construction. A total of 348 people answered 14 questions in the category of the impression of landscape construction classes included in the questionnaire. The results showed that the students found landscape construction classes academically important and recognized the necessity for completing these classes, but they were not satisfied with the learning environments and pedagogics used in these classes. They found what they learned not readily applicable to actual practice and saw these classes as part of their preparations for the landscape engineer qualification test. Their demands in relation to the classes included field practice-oriented teaching and participation in various programs for field practice, which highlights the necessity for human resource management-oriented classes that cover planning, design, construction, and management. Challenges in relation to field practice included the provision of environment, for example offering a variety of opportunities and improving treatment in practice. This study has significance in that it analyzed the views of students and discussed directions for future improvement since there is a lack of studies and discussions about education in the field of landscape construction. This study also has a limitation that only four-year universities were included in the study. Comprehensive studies including investigating junior college and graduate school curricula and case studies of landscape construction curricula overseas are needed in the future.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.54-62
/
2001
Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.
Metro subway construction is a field that requires a great deal of professional manpower. The aging of professionals has a negative impact on both productivity and health, owing to poor working environments, heavy lifting, underground work, and other factors. To address this issue, the government is progressively revising and enforcing health management law and regulation in the construction industry. Thus, the job stress and work ability of many professional subway construction workers, who are rapidly aging, are being analyzed to ensure their safety and improve their health. In this study, the Macpa stress index of Busan Metro Subway construction workers from Sasang to Hadan line was measured by using a Macpa measurement machine, and a work ability survey was conducted by using the questionnaire that was developed by the FIOH. The independent variables were age, years of service, job position, employment type, and occupation. While, the dependent variables were the Macpa stress index and work ability. The Kruskal-Wallis test was used because it was difficult to assume that the statistics of this study represented a normal distribution. The results showed that age, job position, and employment type affected Macpa stress index and revealed that as the age of the workers increased, their stress levels increased as well. Additionally, job position and employment type affected the work ability of the metro subway construction workers. In terms of job position, the technical engineers were under a lot of stress, and whereas the managers had the best work ability. The technical engineers were more stressed than the other workers because of a poor working environment. In terms of employment type, daily workers were under more stress and lower work ability than others.
This study is performed to determine the priorites of the evaluation factors for the improvement of fire emergency medical service by increasing it's efficiency to protect the people's lives effectively, and by recognizing it's mid-long term development. Based on the output of the analysis, the critical evaluation factors of the fire emergency medical services to be improved shall be identified, and shall be intended to use strategically for increasing the efficiency of all the activity in the EMT service, and also for providing the basic date to product and manage the good quality services. To calculate the priority of the evaluation factor for each level as shown on this study, AHP(anaysis hierarchy process) with pairwise comparison method is applied. According to the priority analysis for the evaluation factors in main category (evaluation zone), 'medical service professional aspect' is recognized as highest one, and 'service infrastructure aspect', 'service management aspect' are indicated in order. According to the priority analysis for the evaluation factors in evaluation index, 'professional personal arrangement' in the service infrastructure aspect, 'appropriateness and timeliness of emergency medical care' in the medical service professional aspect, and 'clinical training' in the service management aspect are respectively recognized as most important factors.
International conference on construction engineering and project management
/
2015.10a
/
pp.450-453
/
2015
The Construction Engineering Industry (CEI) is construction field based on professional knowledge, staff and information service, and is distinguished by construction activity. The contemporary CEI market has extended globally and diversified construction work classifications. International construction engineering companies now have an important economic and social effect. Over the last five years (2009 to 2013), the top-200 global engineering firms reported global revenue that grew from 54.4 billion to 71.5 billion, about 27% growth (ENR, 2014). Countries such as the U.S.A., Canada, those in Europe (Several developed countries, i.e., United Kingdom, Netherlands, France, Spain, France, Italy, and Spain), Australia, Japan, China, and Korea comprise the bulk of world construction engineering revenue. Although the construction engineering market continues to grow, much of the work is limited to Europe, mid-Asia, and Asia. Additionally, specific construction types are focused on building projects, industrial plants, and refining plants. As such, there are imbalances in the construction engineering market and some market saturation. Further, there is heavy competition and the construction engineering market may shrink in the future. This paper analyzed various factors affecting the construction engineering market, specifically looking at construction classifications and factors related to a global market. To accomplish this, we collected to data from Engineering News Record (ENR) and recast each variable. And we used nonparametric statistics because the number of cases were small, making it difficult to assume a case's population parameter. Then we tested with the Kruskal-Wallis test and drew results. The results indicate that concentration in particular construction types and extending global regional markets will be have a positive effect on the overall global construction engineering market..
Journal of the Korea Institute of Building Construction
/
v.10
no.5
/
pp.87-94
/
2010
Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.89-97
/
2006
With the increased demand on housing quality and effective urban redevelopment, a new paradigm in reconstruction project is in need. Especially, the Urban and Residential Environment Improvement Law which initiated on July 1, 2003 has become a significant turning point. This code is expected to function as a consistent and systematic measure. This study will examine the code's major concepts and methods to progress reconstruction projects effectively. The application of construction management is examined carefully since the new code requires renewal project consulting firms to function as a professional complement rather than simply perform administration work, as in the past. Also, construction managing methods that can be related to renewal project consulting are examined and speculated. Lastly, methods to improve efficiency in reconstruction projects are introduced through case study and analysis on applicability and expected results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.