Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Construction of ERP-based Product Lifecycle Management System for Electric Power System Components (ERP기반의 전력계통 구성요소 PLM 체제 구축)

  • Yoo, Chol-Hwan;Lee, Jong-Won;Han, Hyun-Gyu;Choi, Yang-Hui
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.15-16
    • /
    • 2007
  • 장기 송변전설비계획 수립 및 최적 계통운용을 위한 각종 검토업무를 위해서는 현재 운영중인 기설 전력계통 구성요소와 함께 향후 건설예정 설비의 전력계통 구성요소에 관한 제반자료가 필수적으로 소요되며, 이들 자료에 대한 정합성 및 통일성 유지가 매우 중요하다. 그러나 한국전력공사(이하 한전)에서는 이러한 자료가 활용목적 등의 차이로 인해 부서별로 관리대상이 다르며, 자료의 수집 및 관리업무가 전통적인 수작업 방식으로 이루어짐에 따라 업무 능률성, 자료갱신 적시성, 자료의 정확성 측면에서 개선해야할 과제로 여겨왔다. 본 논문에서는 최근 한전의 ERP(Enterprise Resource Planning, 전사적 자원관리) 구축과정에서 송변전설비 전력계통 구성요소 관리시스템을 구현함에 있어 단편적인 자료 관리기능이 아니라, 설비의 계획으로부터 건설, 운영, 폐기에 이르는 전 과정에 대해 PLM (Product Lifecycle Management, 수명주기관리)기법을 적용하여 해당분야에 획기적인 개선을 이룩한 사례를 기술하였다.

  • PDF

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A Fundamental Study on the Building Maintenance Using Intelligent Image Information (지능형 영상정보를 활용한 건축물 유지관리에 관한 기초연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Lim, Myung-Gu;Kim, Gu-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.116-117
    • /
    • 2013
  • The various photo data has a lot of information that had produce by the process of construction project lifecycle. Therefore construction site images is very important for effective management of the photograph information to transmit of accurate object information included in photography data. So the purpose of the study is to make application direction of intelligent image information that had image information in tandem with information of 5W1H for effective management of sites image in construction and maintenance phase.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

Lifecycle cost assessment of best management practices for diffuse pollution control in Han River Basin (한강수계 비점오염원 저감시설의 생애주기비용 평가)

  • Lee, Soyoung;Maniquiz-Redillas, Marla C.;Lee, Jeong Yong;Mun, Hyunsaing;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.448-455
    • /
    • 2016
  • Diffuse pollution management in Korea initiated by the Ministry of Environment (MOE) resulted to the construction of pilot facilities termed Best Management Practices (BMPs). Twelve BMPs installed for the diffuse pollution management in the Kyung-An Stream were monitored since 2006. Data on the mass loading, removal efficiency, maintenance activities, etc. were gathered and utilized to conduct the evaluation of long-term performance of BMPs. The financial data such as actual construction, design and maintenance cost were also collected to evaluate the lifecycle cost (LCC) of BMPs. In this study, most of the maintenance activity was focused in the aesthetic maintenance that resulted to the annual maintenance cost of the four BMP types was closely similar ranging from 8,483 $/yr for retention pond to 8,888 $/yr infiltration system. The highest LCC were observed in constructed wetland ($418,324) while vegetated system had the lowest LCC ($210,418). LCC of BMPs was not so high as compared with the conventional treatment facility and sewage treatment plant. On the other hand, the relationship of removal efficiency on unit cost for TSS and TN was significant. This study will be used to design the cost effective BMP for diffuse pollution management and become models for LCC analysis.

Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management) (PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발)

  • Lim, Hyoung-Chul;Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Lee, Kwang-Myung;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Development of Requirement Taxonomy for Design Bases Management during NPP lifecycle (원전 생애주기간 설계기준 정보관리를 위한 요건 분류체계 개발)

  • Kim, Jong-Myeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.134-135
    • /
    • 2018
  • Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.

  • PDF

Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

The Application of Actual Database for building construction - Focusing on Commercial building - (건축공사 공사실적자료 데이터베이스 활용방안 - 상업시설물을 중심으로 -)

  • Lee Sung-Ho;Kim Tae-Hui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.428-433
    • /
    • 2001
  • Commercial buildings are the mostly common ones to be constructed along with residential buildings. After economic inflation, So-called 'IMF era', construction market has been running low because of stagnancy of business activities and cost escalation, Thus the construction industry needs a study of higher productivity by means of using information infrastructure. To deliver a database of commercial buildings construction record, their major management has carried out analysis for database components, in an attempt to meet users' needs. The scheme study of application presented cost and resource in construction lifecycle.

  • PDF