• Title/Summary/Keyword: Construction Information Standard

Search Result 689, Processing Time 0.023 seconds

The Current Status and Development Plan of Construction CALS Standard (건설CALS표준 현황과 발전방안)

  • Kim, Jin-Uk
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2012.07a
    • /
    • pp.435-436
    • /
    • 2012
  • 건설CALS 1998년부터 국토해양부에서 추진하고 있는 정보화사업으로 시스템의 개발 운영과 표준의 개발 운영의 2개 분야로 사업을 진행하고 있다. 건설CALS 표준은 건설정보분류체계, 전자도면작성표준, 도면정보교환표준, 전자문서표준, 디지털 수량산출 교환표준, 건설정보모델(BIM) 작성 납품 공통기준이 있다. 향후 건설CALS 표준은 건설정보 호환을 위하여 정보분류체계의 확장개발과 건설용어의 표준화, 토목분야의 BIM 활성화에 대비하는 토목BIM 표준의 개발이 필요하다.

  • PDF

Development of Standard Risk Indicators for the Prevention of Serious Accidents in Mobile Crane Operations(Focused on Construction Industry) (이동식크레인 작업의 중대재해예방을 위한 표준 리스크 평가지수 개발(건설업을 중심으로))

  • Choi, Jong-Gook
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.228-229
    • /
    • 2023
  • 이동식크레인은 높은 사망률에 기여하는 기계로 최근 6년간(2016~2021) 사고사망사례 중 건설업 2,574건을 분석한 고위험 요인(SIF)정보에서 이동식크레인의 사고는 총 61건의 재해가 발생하였다. 현장의 안전대책에도 불구하고 제대로 활용이 안되고 있다. 본 연구에서는 표준 리스크 평가 지수를 제시하여 사고예방에 기여하고자 한다

  • PDF

Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

Proposal of BIM Quality Management Standard by Analyzing Domestic and International BIM Guides (국내외 BIM가이드 분석을 통한 BIM 품질관리기준의 제안)

  • Kwon, O-Cheol;Jo, Chan-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.265-275
    • /
    • 2011
  • As BIM is now being accepted and broadly expanded in the building industry, the demand for developing, managing, submitting, and checking the BIM models has increased. To meet this demand, it is necessary to develop and spread BIM guidelines, standards, and manuals. Meanwhile, as the number of public construction projects increases, the importance of quantifying the BIM quality checking and evaluation also grows. This study aims to enhance our understanding of the definition and characteristics of BIM quality management, and review the current situation of BIM standards worldwide. In particular, by focusing on BIM quality control and its relevant subjects, the minimum standards for BIM quality management are suggested.

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

A Study on the Revision Archival Thesaurus Construction (기록시소러스 구축지침 개정에 관한 연구)

  • Park, Zi-young;Yoon, SoYoung;Lee, Hyewon
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.17 no.1
    • /
    • pp.117-141
    • /
    • 2017
  • The thesaurus can control the headings in a classification scheme and can serve as an index of the classification scheme itself. In records management, the thesaurus controls functional terms and expands the access point of search to complement the functional classification scheme. In recent years, ISO 25964, the international standard for thesaurus construction, has been revised because of changes in the information environment and the development of thesaurus construction and utilization systems. Part 1 of ISO 15489, the international standard for overall records management, was also amended in 2016. In addition, the Integrated Public Sector Vocabulary (IPSV) in the UK, EuroVoc in Europe, and Functions of New Zealand (FONZ) in New Zealand have been effectively building and linking thesauri to reflect recent trends. In this study, we propose a thesaurus construction guideline for systematic record management in terms of related standards and cases, and suggest an improvement plan for the thesaurus construction guideline in Korea.

Introduction of BIM Quality Standard for Quantity Take-off (건축 물량산출 활용을 위한 BIM품질기준 도입 방안)

  • Kwon, O-Cheol;Jo, Chan-Won;Cho, Joo-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.171-180
    • /
    • 2011
  • As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.

An Efficient Pedestrian Detection Approach Using a Novel Split Function of Hough Forests

  • Do, Trung Dung;Vu, Thi Ly;Nguyen, Van Huan;Kim, Hakil;Lee, Chongho
    • Journal of Computing Science and Engineering
    • /
    • v.8 no.4
    • /
    • pp.207-214
    • /
    • 2014
  • In pedestrian detection applications, one of the most popular frameworks that has received extensive attention in recent years is widely known as a 'Hough forest' (HF). To improve the accuracy of detection, this paper proposes a novel split function to exploit the statistical information of the training set stored in each node during the construction of the forest. The proposed split function makes the trees in the forest more robust to noise and illumination changes. Moreover, the errors of each stage in the training forest are minimized using a global loss function to support trees to track harder training samples. After having the forest trained, the standard HF detector follows up to search for and localize instances in the image. Experimental results showed that the detection performance of the proposed framework was improved significantly with respect to the standard HF and alternating decision forest (ADF) in some public datasets.

A Study on the Revision of Man-day Cost Calculation Method for Information and Communication Facilities Construction Supervision (정보통신설비공사 감리대가 품셈개정에 관한 연구)

  • Lee, Jin-Ho;Kang, Byeong-Gwon
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.2
    • /
    • pp.1-8
    • /
    • 2020
  • The standardized procurement of supervisory cost for the construction of domestic Information and Communication Technology(ICT) facilities, which is announced by the Korea Engineering and Construction Association in May 2009, has been applied in the public institutions and private industries. However, the previous standardized procurement is not widely applied in recent years because the ICT and social economic environment have been rapidly changed and the previous equations to calculate the supervisory cost is not simplified. As results, the needs for a new standardized procurement has been increased and the Ministry of Industry, Commerce and Energy has published a notice with new standard procurement. In this paper, we provide the explanation of the background and the derivation process of the notice based on authors' experiences of project participation. As research method, we compare the previous mad-day cost of ICT construction and that of another area including electric facility construction, and then we explain a new procurement equation based on WBS(Work Breakdown Structure).

LCA Based Environmental Load Estimation Model for Road Drainage Work Using Available Information in the Initial Design Stage (초기 설계단계의 가용정보를 활용한 도로 배수공종의 LCA기반 환경부하량 산정모델)

  • Park, Jin-Young;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.70-78
    • /
    • 2018
  • Due to the increasing concern about climate change, efforts to reduce environmental load are continuously being made in construction industry, and life cycle assessment (LCA) is being presented as an effective method to assess environmental load. Since LCA requires information on construction quantity used for environmental load estimation, however, it is not being utilized in the environmental review at the initial design stage where it is difficult to obtain such information. In this study, a construction quantity computation system based on the standard section was developed for the drainage facilities of the road and utilized in the model to calculate the environmental load. This model can estimate the environmental load by calculating the amount of resources required for LCA using only the information available at the initial design stage. To verify the validity of the model, five validation cases were applied and compared with the unit estimation model and the multiple regression analysis model. As a result, it is confirmed that the mean absolute error rate is 9.94%, which is relatively accurate and effective model in the initial design stage.