• Title/Summary/Keyword: Construction History

Search Result 1,179, Processing Time 0.028 seconds

A Study of the Construction Method of the Pit of Royal Lime Tombs in the Choseon Dynasty (조선왕릉 회격현궁(灰隔玄宮) 축조방법 연구)

  • Kim, Sang-Hyup
    • Journal of architectural history
    • /
    • v.21 no.4
    • /
    • pp.37-46
    • /
    • 2012
  • This study examines the construction method of lime tomb of royal tombs in the Choseon Dynasty based on reference. This was primarily published as "The Five Manners and Courtesy of the Annals of Sejong" as examples, which were followed by the influence of Koryo's culture in the beginning foundation of Choseon, were organized in the time of Sejong; and later, in the time of Sungjong, "The National Five Manners and Courtes y" was published. Such old reference explains the stone materials and construction method of the royal tomb's pit yet there were not many studies regarding the pit of royal tomb in the Choseon Dynasty. And there exists no historical research or reference study in regard to the pit of royal tomb which is formed as a lime tomb. This is believed to be impossible to excavate the royal tomb since ancestral ritual formalities are still given by the descendants and because of our country's culture of giving ancestral ritual formalities which value formalities and filial duty. However, the current excavation of Guhui Tomb, which was the early burial site, was important since it gives an opportunity to look at the shape and structure of lime tombs in the Choseon Dynasty. Thus, this study, based on the excavation of Guhui Tomb, will look into the construction method of the pit of lime tomb and will examine the structure, shape, construction method, etc. of the lime tomb which was formed after the time of Sejo in a way with reference history. This is an important data to learn the construction method of limb tomb of royal tombs in the Choseon Dynasty and is believed to have a very important value as historical materials as to understanding the structure of the pit of royal tombs in the Choseon Dynasty which yet has not been excavated.

A Study on the Layout of the 2nd construction in Hwangnyongsa Buddhist Temple Site (황룡사 중건가람배치 연구)

  • Kim, Sookyung
    • Journal of architectural history
    • /
    • v.23 no.4
    • /
    • pp.81-90
    • /
    • 2014
  • This paper aimed to identify the variation of layout in Hwangnyoungsa buddhist temple site based on studying published the excavation research paper and texts related to layout. According to earlier studies, in 1st construction period(553~569) of Hwangnyoungsa, there were trisection spaces with one main hall and two corridors in inner part and then in 2nd period(584~645), unified one. But actually trisection spaces had been maintained until the middle part of 8th century. And in each space there was the main hall with large yard. That is the 2nd period layout of Hwangnyoungsa. For the attainment this result, each building remains are judged under duplicated situation which one was the previous and next by consideration of the construction condition and special features of foundation. Although the meaning of trisection system of Hwangnyoungsa is similar with the layout of ancient palace, it could be said to derive from accumulation excavation research in Silla's archeological site and such studies.

Features of Temperature Distribution of Exposed Reinforcement Bars Depending on Changes of Covering Methods of Bubble Sheets (버블시트 피복방법 변화에 따른 동절기 노출철근의 온도분포 특성)

  • Lee, Jea-Hyeon;Lee, Sang-Un;Lee, Joung-Gyo;Yang, Seong-Hwan;Kyung, Yeong-Hyeok;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.11-12
    • /
    • 2016
  • The contemporary buildings are becoming super-taller gradually as the industry evolves. Accordingly, winter concrete also became an important element for the year-round construction since shortening of a construction duration became important. Accordingly, this research team once developed a double bubble sheet as concrete cover curing compound during winter. But since there is no proper countermeasure for the exposed reinforcement bars, it is worried that the concrete can be damaged by exposed frozen reinforcement bars at a low temperature during the initial period. Therefore, in this study, it is intended to review the temperature history of the reinforcement bars depending on changes of the covering methods of the exposed reinforcement bars by using bubble sheets.

  • PDF

A Study on the Operating System of the Architectural Standard Scale of Length(尺度, Korean foot) used in the Hwasong City Wall in the 18th Century (척도운용체계를 통해 본 18세기 화성건축의 건축구성에 관한 연구)

  • Lee, Ho-Rak;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.6 no.2 s.12
    • /
    • pp.65-77
    • /
    • 1997
  • The Hwasong City Wall was built for three years(1794-1796), but the real construction term was taken only 28 months. The wall and the buildings on the wall were built simultaneously, and the esttimated construction cost was highly restricted. These conditions were main factors for considering the high efficiency of construction productivity. This study examines these factors that are reflected in the operating system of the architectural standard scale of length, the architectural composition system in the Hwasong City Wall to reduce the construction cost. Through the study, following factors are found. 1.The rule of multiple proportion is found in the relationship between the partition distance, that is, span and the height of the girder which is related to the productivity of ready-made building members. 2.The ruling grade system of scale in the component members is found in the chang-bang(창방, penetration members)

  • PDF

Field Construction Applying the Insulating Method of Moderate-Cold Weather Concreting Using Double Bubble Sheets (2중 버블시트를 이용한 한랭기 콘크리트의 단열양생공법 현장적용)

  • Kim, Jong;Kim, Jong-Back;Jeon, Chung-Keun;Shin, Dong-An;Oh, Seon-Gyo;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.29-32
    • /
    • 2006
  • Experimental test results of field construction, Cheongju University Educational Liberal Art Building, applying the insulating curing method on slab concrete showed that the quality of concrete in fresh and hardened state satisfied all target values. Temperature history of slab concrete in A and B area secured more than $7.8{\sim}9.2^{\circ}C$ higher than outside atmosphere. After completing certain curing period of time on the surface of the structure, crack occurrence was not found. It is concluded that the preventing vaporization of moisture by the insulating curing method reduces plastic and drying shrinkage as welt as improves durability.

  • PDF

A Study on Construction Contractors in Daegu During the Japanese Colonial Rule (일제강점기 대구의 토목건축청부업자에 관한 연구)

  • Lee, Jin-Hyun
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.173-186
    • /
    • 2010
  • This article is about the study on construction contractors in Daegu during the Japanese Colonial Rule. The first construction contractors who involved with Kyong-bu railroad work in 1904 personally. But, after they go through the bidding method, changed by the Japanese Government General of Korea in 1922, and the second bid rigging in 1932, contractors was changed gradually the organization into unlimited partnership, limited partnership or stock corporation. The number of them was increased. Most contractors were Japanese, and organized a limited partnership which has been capitalized at 30,000 won. On the other hand, Korean contractors couldn't work at an important part, except for the personal activities of Youngsil Lee(李永實). They were usually employed as consultants or field deputies by Japanese contractors. After the Liberation, Japanese construction contractors returned to Japan, however Tatuoka-kumi(龍岡組), Yasiro-kumi(屋代組) and Sakano-kumi(坂野組) that was leading the business which were took over by Koreans. They were leading architecture field in Daegu.

A Study on the Establishment and Construction Work of Bungang Seowon (안동 분강서원의 창원 및 조영(造營)에 관한 연구)

  • Lee, Ho-Yeo
    • Journal of architectural history
    • /
    • v.29 no.1
    • /
    • pp.7-20
    • /
    • 2020
  • This paper is a review of the construction process, craftsmanship, architectural economy of Bungang Seowon through the Changwon Ilgi(diary). The Bungang Seowon, which was built in the early 18th century, was initially built as a shrine, but was later completed as a seowon upon the decision of the scholars. It was the descendants of Nongam and the Hyanggyo, Seowon, and the government offices that provided economic, human and material support to the construction of Seowon. The small building of Bungang Seowon was run by a civilian carpenter, while the large building was run by a monk carpenter. The mobilization of the building workers was done by local scholars assigning the number of workers needed for each village.

A Study on Accuracy Improvement for Estimation of Vehicle Information Using BWIM Methodology (BWIM방법을 이용한 차량 정보 추정시 정밀도 향상 방안에 관한 연구)

  • Hwang, Hyo-Sang;Kyung, Kab-Soo;Lee, Hee-Hyun;Jeon, Jun-Chang
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.1
    • /
    • pp.63-73
    • /
    • 2013
  • Dynamic strain history curve measured in the field is influenced by various factors such as vehicle type, speed, noise, temperature and running location etc.. Because such curve is used for vehicle weight estimation methodology suggested by Moses, exact strain history curve is the most important thing for exact estimation of vehicle weight. In this paper, effect of such factors mentioned above is investigated on the measured strain history curves, and results of weight estimation of vehicles are discussed quantitatively. From this study, it was known that temperature effect contained in the strain history curve measured for long time in-site gives the biggest effect on result of weight estimation and it can be removed by using the mode value. Furthermore, gross vehicle weight can be estimated within 5% error corresponding to A class of the European classification if effects of temperature and noise are removed and vehicle properties such as speed, axle arrangement and running location are considered properly.

A Study on the Peculiarity of Construction Work for Architectural Properties during $1910{sim}1965$ ($1910{sim}1965$ 건조물문화재 보수공사의 시공특징에 관한 연구)

  • Kim, Jae-Kuck
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.77-99
    • /
    • 2006
  • This study is on the construction work of Preservation for Korean architectural properties during the period of japan invader. Korea lost their preservation ability of architectural properties when went through specific background from 1910 to 1945, which was the period of japan invader. Through this situation japan had to face the preservation of architectural properties for japan and korea. After 1945, korea has preserved the architectural properties over 50's years and which accomplishment every yew. Also, there are some architectural properties which registered in world heritages. However, the study of this period is not studied enough. Especially a construction work for architectural properties during this period is not become known. Therefore, the purpose of this study is for three. First is to analyze construction work data(a specifications and etc.) for accessing originality of korea architectural properties. Second is to understand about the construction works of preservation for the korean architectural properties. and the last is to compare the peculiarities of construction work of Preservation for korean architectural properties between during 1910-1945 and 1945-1965.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF