• Title/Summary/Keyword: Construction Firm

Search Result 249, Processing Time 0.021 seconds

A Study on Development of Construction Industry's Accounting Information System (건설 산업 회계정보시스템 구축 방안에 대한 연구)

  • Kang, Dong-Il;Yoon, Sung-Yong
    • Journal of Digital Convergence
    • /
    • v.13 no.3
    • /
    • pp.127-135
    • /
    • 2015
  • This study has become a construction company will help you establish a Management Accounting System target model to move forward. Research method was to present the basic concepts and techniques used in managing complex accounting convergence look at the whole construction industry. For the successful deployment of a construction company management accounting system Responsibility Accounting System, Target Profit, Target Cost, and requires a key technique of Performance Evaluation, which the CEO's firm determination and persistence for support, proactive communication in the field and headquarters staff, the goal organizations and institutions to support the model, the standardization is required. This study is based on case studies in the future through the Delphi Method and AHP are needed.

Assessment of Equity Market Responses on the Construction Project Awards (건설프로젝트 수주에 대한 시장의 평가)

  • Choi, Jong-Soo;Heo, Seong-Tae;Lee, Hee-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.221-228
    • /
    • 2010
  • A construction firm's performance is largely attributable to performance in individual projects. In this regard, the awarding of an individual project has significant implications. However, project awards have received limited attention in the construction sector from amarket assessment perspective. This event study focuses on an analysis of market responses at the time of project awarding. A total of 252 samples wereselected through a rigorous sample screening processes. Performance was measured as cumulative abnormal return, which is traditionally adopted in event analysis. Research results indicated that the overall return is positive, and that the level isstatistically significant. Equity holders realized a higher return for projects awarded from the foreign countries compared to domestic projects. No relationship was observed between project size and the level of return. Other research findings and implications were discussed in detail from a management perspective.

A Study of the Deregulation of New Apartment Sales Price and the Stock Price of Construction Firms (분양가 자율화와 건설회사의 주가)

  • Yang, Choonsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.3-11
    • /
    • 2019
  • This study is designed to examine the stock price of construction firms which are affected by the deregulation of new apartment sales price. As empirical methodology, it uses the traditional event study analysis to test the influence of the deregulation of new apartment sales price and the regression analysis to test which variables are related. The results of this study are summarized as follows : First, the cumulative abnormal return of stock is positive when government announced the deregulation of new apartment sales price. The cumulative abnormal return of stock for 21 trading day before -10 to +10 day is 25.51% which is significant different from zero at 1 percent level. This result suggests that the deregulation of new apartment sales price conveys good information to stock market that the firms performance will be good in the future. Second, in the regression analysis this study shows that the cumulative abnormal return of stock is related to firm's profit margin ratio.

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.

Development of Evaluation System for Overseas Business Capability of Construction Firms (국내 건설기업의 해외건설능력 평가체계 개발)

  • Jang, Woosik;Yang, Hae-Beom;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.977-987
    • /
    • 2014
  • Since 1960's, international construction market have explosively increase and have reached up to 600 Bil. US$ through active participation of construction firms and steady support of government. Nevertheless, owners, clients and financial institutions required reasonable criteria to effectively assess the overseas business capabilities of construction firms. However, the existing methods for construction firms rarely considers the perspective of overseas business capabilities. To overcome these problems, this study proposes an evaluation system for overseas business capabilities of construction firms. First, the needs for new evaluation system is derived through FGI, and the direction of new evaluation system is presented by reviewing the limitations of existing methods. Also, the capabilities that are required for the performances for overseas businesses were analyzed through expert interviews. Finally, 31 primary evaluation indices consisting of 3 criteria - appropriateness of index, possibility of quantification, possibility of data gathering - are derived under 9 categories and 3 perspectives through surveys and consultation meeting. The preliminary investigation of 24 Korean construction firms are conducted for comparing the existing evaluation systems and to verify its applicability. The proposed method could provide a rational criterion to evaluate the construction firms, improve internal capacity of firms, and ultimately supports the success of the construction industry.

A Study on the Strength Change of Used Pipe Support (1) (재사용 파이프서포트의 내력변화 연구 (1))

  • Paik, Shin-Won;Ro, Min-Lae
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.93-97
    • /
    • 2004
  • Slab formwork consists of sheathing, stringer, hanger and shore. There are several types of adjustable individual shores. In constructions site, pipe supports are usually used as shores. The strength of a pipe support is decreasing as it is frequently being used at the construction site. In this study, 2857 pipe supports were bought to fine out the strength change of used pipe support and unused pipe supports according to aging. Among these pipe supports, 2337 pipe supports were lent to the construction companies free of charge. Compressive strength was measured by knife edge test and plate test at each 3 month. Test results show that the strength of unused pipe supports almost equaled to the strength of new pipe supports until 191 days, but the strength of used pipe supports at 191 days was lower than the strength of new pipe supports. So, the strength of used pipe supports at 191 days was not satisfied the specification of KS F 8001. According to these results, it shows that attention has to be paid to formwork design using used pipe supports. Therefore, the paresent study results will be able to provide a firm base to design slab formwork and test the performance of used temporary structure and prevent formwork collapses.

Spotlighting Engineering Service Business in Korea (각광받는 한국의 기술용역업)

  • Cho Kyu Shim
    • Proceedings of the Korean Professional Engineer Association Conference
    • /
    • 1987.12a
    • /
    • pp.65-71
    • /
    • 1987
  • All Korean professional engineer′s great joy Is to welcome the Japanese professional engineers and relevant guests to the 1987 Japan-Korea Professional Engineers Joint Convention organized by the Korean Professional Engineers Association. As there exists an effort of blood, sweat and tear behind a succeeded theatrical stage, so an exquisite devotion with drawing up a master plan, investigation, supervision and etc by engineering firms is soaked through every part of huge construction projects and large unit factory buildings. It is over 14 years that the Engineering Service Promotion Law has been enacted by the Ministry of Science and Technology. In the meantime, the domestic engineering (engineering service) have reached a remarkable higher level while the number of engineering firms participating in overseas market has gradually been increasing. From a small scale of under water investigation to a large scale planning of atomic reactor or petrochemical plant, engineering service business can be said "The Software of Total Industry." Engineering service is what is called a higher business which offers specialized engineering know-how and experience. Engineering service compaines offer Its specialized knowledge and experience to government, industry and commerce. Whether the task is to modernize plant equipment, to design a building or to manage construction, an engineering company will develop and implement the most appropriate and cost effective solution. Clients use the engineering service of firm knowing that the engineer′s professional judgement is not influenced or biased by other commercial affiliations. While benefiting from the diverse experience that professional engineers can apply to a specific problem, government and industry also reduce the need for permanent in-house engineering staff. Engineering firms may be specialized or multi-disciplinary.

  • PDF

An Experimental Study on Stone Columns Foundations (석재기둥 기초의 실험적 연구)

  • 정철호
    • Geotechnical Engineering
    • /
    • v.9 no.3
    • /
    • pp.35-48
    • /
    • 1993
  • This paper was focused on the design and construction of stone columns as a method of reinforcements in slightly soft clay or loose silty sand overlying the firm strata. It was intended to find out the effects of soil improvement by field tests in Kwangmyoung Haan Site by comparing the test results performed before and after the installation of stone columns . The results of this experimental study are as follows : the hearing capacity was increased by 3.33 times and the SPT N -valued was increased by 3.9 times by installing the stone columns : the stone column method can cut down the construction cost almost 35% compared to the precast concrete pile method in economic viewpoints.

  • PDF

An Analysis of Evaluation Indicators for the Construction of Gwang-Ju Culture Industrial Cluster (광주 문화산업클러스터 조성을 위한 평가지표 분석)

  • Kim, Sam-Cheol;Kim, Iltae
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.677-689
    • /
    • 2013
  • This paper derives the evaluation indicators relating to the mechanism and success factors of culture industrial cluster from the successful cases of culture industry in foreign countries and provides policy implications for the successful construction of culture industrial cluster by comparing with the survey of Gwang-Ju city's culture content companies. This paper shows that policy implications are linkage by leading firm of successful companies, securing huge hinterlands nearby metro city, cultivating of creative talented persons, operating of capital funds, promoting main force business(game, animation, mobile)-oriented culture industry, positive vitalization of network, role strengthening of city or Information & Culture Industry Promotion Agency as vision provider, and aggressive granting of incentives for attracting companies.