• Title/Summary/Keyword: Construction Facilities

Search Result 2,751, Processing Time 0.033 seconds

Maintenance Model of Agricultural Facilities Using CBR

  • Kim, Jae-Yeob;Lee, Yong-Kyu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.133-141
    • /
    • 2012
  • As we move from the industrial age to the information age, domestic industries are changing rapidly, and rural society is also laying the foundation to make use of information technologies. Through this kind of modernization, the size of agricultural facilities has been increasing on a significant scale. But, in reality, there are many difficulties in the maintenance of agricultural facilities in proportion to their growing number. Accordingly, this research aims to solve the fundamental problems that occur with agricultural facilities in the maintenance stage. In addition, it aims to provide information on how to maintain and manage facilities for farmers. The presentation of the maintenance information was conducted using a case-based reasoning method that solves current problems based on past cases. The tool of case-based reasoning was applied to define the establishment of the base for cases, characteristic variables and maintenance measures. The effectiveness of a CBR model was examined through the case study. The use of the case-based reasoning method is judged to be effective as a tool to support the decisions of farmers regarding maintenance. When the maintenance measures derived through the CBR model are offered to farmers, the fundamental problems of maintaining agricultural facilities will be solved, and the damage to such facilities minimized.

A Study on the Maintenance System Module Design for the BTL Project Facilities : Focused on Educational Facilities (임대형 민자사업(BTL) 발주 시설물의 합리적 유지관리시스템 모듈 설계에 관한 연구 -교육시설물을 중심으로-)

  • Kim, Sang-Seok;Son, Jae-Ho;Lee, Seung-Hyun;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.702-707
    • /
    • 2008
  • BTL projects for educational facilities were conceived in 2005 to supply public facilities in a timely and efficient manner After the projects were completed in March 2007, proper facility maintenance has become an increasingly important issue. However, BTL projects are still in an early developmental stage, and the data on the maintenance and operation of such facilities are not yet available because the operation of the facilities has just begun. Accordingly, this study is conducted to derive maintenance processes and to specify maintenance items for the efficient maintenance of BTL educational facilities. Then, database on the maintenance processes will be created, and a maintenance system module will be designed.

  • PDF

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.

  • PDF

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

The Hydro-Environmental Characteristics of Port Facilities around the Sea of Cheju Island (제주해역 항만시설물의 수리환경적 특성에 관한 연구)

  • 정태욱;김종인;류청로
    • Journal of Ocean Engineering and Technology
    • /
    • v.14 no.3
    • /
    • pp.1-10
    • /
    • 2000
  • In order to effective manage the construction, disaster prevention plan and the harbor tranquility control, meteorological and sea-state characteristics around Cheju Island have been analyzed. Using results and damage examples of the port facilities under severe sea conditions, a reasonable construction control plan considering the regional characteristics of the sea-state and winds was proposed. That is, in northern part of Cheju Island, the construction work is affected mainly by the winter storms, while the typhoon mainly affects the southern part port facilities during summer to Autumn. Considering their typical characteristics, it is strongly suggested that the main construction work should be carried out during April to July in the northern part, and it should be made during October to next July in the southern part of the island. A permeable TTP mounded breakwater was constructed to protect severe waves as a temporal structure under the long-term development plan in Sogipo port. The transmission characteristics of the structure was discussed using the experimental results. The results show that the transmission coefficient $K_{t}$ is over 20% of incident waves, which cause many problems in the cargo handling in relation to harbor tranquility. In conclusion, this kind of permeable structure can be used only as a temporal structure for the disaster prevention under the construction process. It causes many problems in harbor tranquility if it is used as a permanent harbor structures.s.

  • PDF

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF

A Disaster precaution and efficiency improve of labor by promotion of Emotional Safety Culture of laborer (근로자의 감성안전문화조성에 의한 작업능률 향상 및 재해 예방)

  • Kim, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.473-477
    • /
    • 2006
  • In domestic construction site, convenient facilities for worker are much lacking up to now. These things exert negative influences in the occurrence of construction disaster because a safety-aware of worker-self is been lacking ultimately, and 3D(Dirty Dangerous Difficult) evasion phenomenon for construction site spreads more to workers and actuality that is going through manpower problems may be heavier. This research applied sensitivity safety cultural institutions that make aware of worker's sensitivity in spot to search solution way of these problems from resource of human original nature. By the result, there were affirmative sides that sensitivity safety cultures facilities make created a safety-aware during work to worker-self. Also, these facilities gave as member of a constituent by workers, it examined that become many helps in operation efficiency.

  • PDF

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

A Case Study on the Serious Accidents of Construction (건설중대재해 사례 연구)

  • 장동일;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.108-120
    • /
    • 1996
  • It is a problems in industrial accidents that the knowledge for industrial accidents is obtained by experience, not by experiment. This experiential knowledge is obtained by Investigating accident cases and utilizing those for safety education. Therefore, in this paper, the situation about the serious accident of construction is analyzed by occupation, a kind of construction, time group, season, type of accident, and accidental cause. And the mutual · relations of these factors are studied. The most frequent type of the serious accidents of construction Is the falling accident. It happenes most frequently at apartment construction among kinds of construction and to structural worker, finishing worker, normal worker in order among occupations. And it is found that the most critical causes of the falling accident are the imperfection of safety facilities and unwearing of protection equipments, so a number of accidents can be reduced by the expansion of safety facilities and wearing of protection equipments absolutely. The counterplan of prohibition of accidents and the direction of government policy are presented by a series of nalyses for accident cases.

  • PDF