The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.
본 연구는 최근 건설현장에서 쓰이는 부속공정으로 많은 공사비와 공사기간을 필요로 하는 철근 콘크리트 공법과 접합부의 보강문제에 있어서 많은 노력을 요구하는 PC공법의 단점을 보완하기 위하여 중공PC공법의 도입을 제안하며, 본 공법의 현장 적용성에 대한 경제성 평가를 하고자 한다.
일제강점기 고건축물 보존수리 공사에 관한 공사비를 운용하는 시스템은 크게 둘로 나뉜다. 고건축물의 소유권에 따라 보존비 공사와 보존비보조공사로 구분된다. 보존비 공사는 관유 건축물, 즉 조선총독부가 소유권과 관리권을 갖는 고건축물에 대한 보존 수리를 의미하며, 보존비보조공사는 사찰 등의 개인이 소유권을 가지고 있는 사유 건축물의 보존수리를 의미한다. 관유 건축물 보존수리의 경우, 조선총독부가 주체가 되어 보존수리를 시행하였으므로 예산집행과 관리감독의 주체가 동일하다. 왕릉 및 유물, 구 관청, 향교, 일부 서원 등이 여기에 속한다. 반면 사유 건축물의 보존수리는 사유재산을 대상으로 하는 만큼 조선총독부는 보존수리의 허가에 대한 권한이 있을 뿐이다. 소유자 측에서 보존수리를 요청하면 조선총독부는 보존수리비를 지원할지 결정하고 이를 관리 감독하는 역할을 하게 된다. 사찰이 소유하는 불당 및 탑, 그리고 개인 및 문중이 소유하는 사원 및 사당이 여기에 해당한다. 따라서 관유 고건축물은 조선총독부의 예산 안에서 지출되므로 보존비 공사로 분류되고, 사유 고건축물은 조선총독부의 보존보조비 예산 안에서 지출되므로 보존비보조공사로 분류된다. 보존비공사와 보존비보조공사는 주체가 다르므로 공사시행 절차에서 다소 차이가 드러난다. 제출하는 서류의 종류, 현장감독의 역할 등 행정 절차상의 차이가 두드러진다. 이러한 양분된 시스템은 일제강점기 내내 개선되지 않은 채로 남게 된다. 조선총독부는 식민지 정부였으므로 일본 정부의 영향을 많이 받았다. 일본은 대부분의 건축 문화재가 사찰과 신사 소유였고, 관유 건축문화재가 거의 없었으므로 조선총독부와는 달리 일원화된 체제였다. 조선총독부의 고적 및 유적 관련 시스템은 당시 한국의 정황에 맞게 형성되기보다 일본의 영향 하에서 형성되었다. 따라서 문화재 보존수리 비용의 양분된 체계 속에서도 조선총독부는 뚜렷한 해결방식을 제시하지 못하였다. 이는 당시 식민지 정부인 조선총독부의 한계가 보이는 부분이라 할 수 있다.
The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.
The 1th International Conference on Construction Engineering and Project Management
/
pp.437-446
/
2005
Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.
공공임대주택의 경과연수가 증가함에 따라 시설물의 노후화로 인한 유지관리비용이 급격히 증가하고 있다. 이에 효과적으로 대처하기 위해서는 우선 비용에 대한 정확한 예측을 하고 필요한 재원을 확보하는 일이 무엇보다도 중요하다 따라서 시설물 유지관리비에 영향을 미치는 요인들을 분석하고, 이를 고려한 비용 예측방법의 개발이 필요하다. 공공임대주택 운영관리비의 약 60%를 국가에서 지원하고 있는 미국의 경우는 수년간의 실적데이터를 바탕으로 운영관리비를 효과적으로 예측할 수 있는 방법을 개발하여, 공공임대주택이 적정한 수준에서 잘 운영될 수 있도록 하고 있다. 그러나 아직까지 국내에서는 공공임대주택을 대상으로 운영관리비 영향요인이나 예측 툴에 관한 연구 실적은 매우 미흡한 실정이다. 본 논문은 최근 5년간 공공임대주택에 실제 지출된 운영관리비를 바탕으로, 시설물 유지관리비용에 미치는 영향요인과 요인별 영향력 등을 밝혀냄으로써, 향후 객관적이고 정확한 비용예측 도구를 개발하는데 일조 하고자 한다.
The investment for industrial disasters prevention can not help but get accomplished in negative way. At this point, the most effective way to diminish industrial disaster outbreak is the very subject should strive to prevent it by itself However, it's still the times that we place more weight on economic development no economic subject would not positively self-participate in it for the investment for industrial disasters prevention without my effect of numerical reduction. In this view, this study will tv to entirely analyze and grasp the economic toss due to industrial disasters at construction sites, and will present the most suitable safety-investment. As a result, in domestic construction sites, averagely $1.6\~2.6\%$ of the entire construction expenses had been invested for safety expense. The according to the result of the analysis, basically this safety investment expenses should be spent $2.4\%$ over to reduce the saffey-accidents stably.
Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.
우리나라의 잔여지 보상제도는 크게 잔여지 매수 보상, 잔여지 감가보상, 잔여지 공사비 보상 등 세 가지로 나눌 수 있으며, 이 중 매수보상에서는 매수대상 요건이 주로 문제가 되고, 공사비보상에 대해서는 별도로 문제가 되는 부분이 거의 없다. 본 연구에서는 현행 잔여지 감가보상제도의 내용과 문제점을 살펴보고, 미국과 일본의 제도를 비교 분석하여 우리나라의 보상제도와의 차이점을 알아보고 잔여지 감가보상에 대한 정책적 대안을 마련하고자 한다.
Generally, as corrosive protection processing of a steel structure, zinc galvanizing and heavy duty coating paint are applied. However, zinc galvanizing has the difficulty of restriction of a size, or on-site construction. Moreover, heavy duty coating paint has a problem with many administrative and maintenance expenses with short problem of adhesion, corrosion generating of a damage portion, and maintenance management cycle. In this study, a salt water spray test, CASS test, and the electrochemistry examination were carried out for the thermal metal spray method of construction for corrosive protection performance evaluation. Moreover, the corrosive protection life of a thermal metal spray method of construction was quantitatively calculated on the basis of this experiment. in consideration of LCC, the economical efficiency of a general corrosive protection method of construction and a thermal metal corrosive protection method of construction was compared. Consequently, although initial construction expense was estimated 16 to $30\%$ high, as for a thermal metal spray method of construction, it turns out that the administrative and maintenance expenses for 100 years became cheap 9.3 to 13 or more times.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.