• Title/Summary/Keyword: Construction Engineer

Search Result 420, Processing Time 0.024 seconds

Trends for the Promising Career of Science and Engineering Workforce: Job Outlook of Korea.USA.Australia (이공계 인력의 미래 유망직업 연구동향: 한국.미국.호주의 직업전망을 중심으로)

  • Han, Jiyoung
    • Journal of Engineering Education Research
    • /
    • v.15 no.5
    • /
    • pp.140-150
    • /
    • 2012
  • The purpose of this study was to compare and analysis researches related the promising career and job outlook and to provide the direction for job choice to engineering students. Literature review and expert council were used to achieve the objectives of study. The result of this study was analyzed that these jobs were promising, that is, environmental scientist and specialist, earth scientist and hydrologist(education and research related career), architecture and architectural engineer, civil engineer, landscape technician, land surveyor map production expert photo surveyor surveying technician(construction related career), material engineer (mechanics and material related career), mine and geology engineer(chemistry, fiber and environment related career), computer system design and analyst, system software engineer, application software engineer, web specialist, and computer support specialist (electrical and telecommunication related career) and food engineer(food related career). In addition, health silver specialist, bio biomedical engineer, renewable energy specialist etc. were promising by considering social and economic trend for demographic change like aging and green growth.

A Study on The Analysis of Present Condition and Problems of Construction Management Certification Qualification in Korea (국내 건설사업관리 (CM) 인증자격의 현황 및 문제점 분석에 관한 연구)

  • Yu, Hoe-Chan;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.181-184
    • /
    • 2009
  • The technical expert standing system of our construction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with is judged as the nostril people for qualification of the civil CM educational institutions ha the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished, In this research, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.

  • PDF

Supply-Demand Forecasting of Principal Engineers in Construction Industry Using System Dynamics (시스템 다이내믹스를 활용한 건설 특급기술자 수급전망)

  • Kim, Sung-Tae;Lee, Hyun-Soo;An, Sun-Ju;Ryu, Han-Guk;Park, Moon-Seo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.161-172
    • /
    • 2007
  • By prosperous condition of construction economy in the early 90s in Korea, the government needed a lot of the qualified professional engineers (PE) to manage the construction site. In order to meet the high demand of P.E., Government has established the admitted engineer systems(AES) in 1995 that give the authority of principal engineers to the admitted engineers who do not take the written examination but have equivalent working experience. Since 2000, professional $engineer^{\circ}{\phi}s$ shortage has been resolved. however, the opposite situation, which is serious over-supply of construction engineers has occurred. Thus, Government announced that would abolish the admitted engineer systems as recognized the existent admitted engineers(about 1,000,000 persons) from 2007. However, Professional Engineers Institution has strongly insisted that Government should not recognize existent admitted engineers. From this point of view, it is critical to make the supply-demand forecast systems as a derivative approach of System Dynamics also, that is useful in comparing the argument between Government and Professional Engineers Institution. This paper describes about principal $engineer^{\circ}{\phi}s$ supply change by admitted engineer system abrogation and suggests the idea to regulate the supply and demand with the improvement of the regal system.

Dispute Settlement in Construction Contracts Under FIDIC (FIDIC에 의한 건설계약 분쟁 해결방안에 관한 연구)

  • Kim, Seong-Chirl;Jung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.21-29
    • /
    • 2010
  • International construction contractors are often faced with the situation of working in an unfamiliar construction environment. Under FIDIC rules, the contractor has the right to make a claim requesting the consulting engineer for an adjustment to the contract price or the time for completion when a part or parts of the works have changed, or in the event of unforeseeable conditions. Contractors generally have more access to the costs and time implications of such a change or unforeseeable conditions than the consulting engineer or outside neutrals. Due to such an asymmetry of information, the contractor may be motivated to dispute frivolous claims of less merit, expecting erroneous judgments by the consulting engineer or the neutrals. In this paper, a claiming behavior model is presented by using game theory and experience data to study the manner in which frivolous claims develop into disputes. The model also analyzes the impacts of DAB/DRB upon the frivolous claims.

The Study on Imbalance for Labor Supply and Demand in Electrical Construction Business : Simulating the Supply and Demand Gap of Technical Engineer (전기공사업 노동시장의 인력수급 불균형에 관한 연구: 기술·기능인력의 수급격차에 대한 시뮬레이션)

  • Park, Houng-Hee
    • Korean System Dynamics Review
    • /
    • v.14 no.3
    • /
    • pp.105-134
    • /
    • 2013
  • Electrical construction business has public and professional characters. It may require appropriate interventions of the government because these business activities stand for not only profit-seeking competition, but also supplies of one of the key functions in our society. In other words, public benefit and private benefit are still in existence. The government therefore considers such an aspect of public importance of the business sector and needs to plan to adjust technical and engineering manpower of this market. This study focuses on the imbalance for labor supply and demand of technical engineer in electrical construction business. A system dynamics analysis is applied to understand and simulate the imbalance as a soft approach. It has the merit of causal loop diagram to alleviate the limitation of data lack problem. We find that excess demand is expected from 2010 to 2011, and excess supply is predicted from 2012 to 2021 about the manpower of technical engineer. It shows considerable disagreement between the supply and demand of human resource. So we suggest that it is strong necessity to construct statistics infrastructure for a manpower supply and demand plan.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Improvement of Global Construction Engineer Training Program : An Importance-Satisfaction Analysis (글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안)

  • Park, Hyeon;Park, In-Seok;Cha, Yongwoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.31-39
    • /
    • 2016
  • This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.