• Title/Summary/Keyword: Construction Engineer

Search Result 420, Processing Time 0.031 seconds

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Supply-Demand Forecasting Method of Qualified Engineers in Construction Using System Dynamics (시스템 다이나믹스를 활용한 건설분야의 특급기술자 수급전망)

  • Kim, Sung-Tae;Park, Moon-Seo;Lee, Hyun-Soo;An, Sun-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.373-377
    • /
    • 2006
  • By prosperous condition of construction economy in the early 90s in korea, we needed a lot of the qualified professional engineers(PE) to manage the construction site. In order to meet the high demand of P.E., government has established the admitted engineer system(AES) which is given to admitted engineer who do not take the written exam but have equivalent working experience in 1995. However, since 2000, while professional engineer's shortage has been resolved, the opposite situation has occurred that is serious over-supply of construction engineers. Thus, government announced that will abolish the admitted engineer systems as recognized existent admitted engineers. However, Professional Engineers institution is insisting that must not recognize existent admitted engineer. From this point of view, it is critical to make the supply-demand forecast systems as a derivative approach of system dynamics also, that is useful in comparing the argument between government and Professional Engineers institution. This paper describes about qualified engineer's supply change by admitted engineer system abrogation and suggests the idea to regulate the supply and demand with the improvement of the regal system.

  • PDF

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

A Study on the Characteristics of Supervision Engineer Qualification in China (중국 감리공정사(監理工程師) 자격제도의 특성에 관한 연구)

  • Han, Guang;Shin, Kyoo-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.585-594
    • /
    • 2018
  • Chinese construction corporations take more market shares in the global construction market. The performance of Chinese construction corporations need to be reviewed from the capability and qualification system of the engineers including supervision engineer. The purpose of this study is to analyze the characteristics of professional qualifications for supervision engineer in China. The research methodology is to investigate the qualification exam system, process and examination subjects for searching the fundamental body of knowledge about supervision engineer qualification. The results shows that the qualification system in supervision engineer are classified in detail for the body of knowledge and operated by the government. The qualification examination requires broad and defied knowledge structure together with practical experiences. The research results may lead further research subjects of Chinese construction related qualifications and education system in the ways of more specificity, expertise, and practicality. The mutual understanding of qualification system becomes major issue to build better collaboration in global market.

Program development for composition of construction safety management expenses (건설안전관리비 산정 프로그램 개발)

  • Hong, Sung-Man;Lee, Jung-Gi;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF

A Study on the Strategy for Engineer/Designers' Risks in Korea;Based on Questionnaire Survey (우리나라 설계자/감리자의 클레임 대응방안 연구;설문조사를 중심으로)

  • Cho, Young-Jun;Park, Hong-Sik;Kim, Sung-Bin;Park, Kyung-Nam
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.479-482
    • /
    • 2007
  • The volume of Construction project is increasing now in Korea. The complexity and variety makes the project many problems. But there are few construction contract experts. This results in a lot of managerial conflicts. Specially Engineer/Designer confront gigantic risk related to their job. So, to classify and to identify the risk practical investigation about Engineer/Designer's job. Therefore, to avoid and to prevent the claims for Engineer/Designer, clarification of the scope of service, use of external claim expert, and introduction of professional liability insurance should be accomplished.

  • PDF

A Study on Weights of the Factors to Evaluate Competency of Construction Engineer (건설기술자의 공통역량 측정 인자 및 가중치에 관한 연구)

  • Choi, Hye-Mi;Choi, Sun-Hee;Kim, Young;Park, Chan-Sil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.225-229
    • /
    • 2007
  • Construction projects heavily rely on construction engineers competency, and instant judgment and problem solving ability against unpredictable situation directly affect the success of construction project. Therefore in order to hire construction engineers that are competent to lead construction projects successfully, the construction engineer competency evaluation is essential from the selection process. Hence, this research proposed items to assess the operation competency of construction engineers by deducing influence factors necessary to measure operation competency via interviews with experts and applying the factors. After conducting survey questionnaire utilizing analytic hierarchy process(AHP) for the proposed operation competency measurement items, weighted values were assigned.

  • PDF