These days, interior construction is performed to prevent the deterioration of old building finishings or to make distinctive designs. In case of interior construction, a construction cost is estimated through basic 2D drawings in the design step. Accordingly, an efficient construction plan and direction is established according to budget. In such a case, construction is dependent on 2D drawings. At that time, a risk can occur easily. This study is aimed at reducing the cost and risk of interior construction by implementing 3D drawings with the use of the visual data of 2D drawings. For accurate analysis, 2D drawings were completed, and then 3D interior construction modeling for various buildings was conducted with the 3D modeling software 3D Max. According to the 3D modeling, it reduced the cost and risk more than 2D drawings based design, and influenced the improvement in the understanding of orderers and workers.
The purpose of this study is to arrange the terminology of the drawings in Chosun Dynasty, and to investigate the characteristics of drawings after the middle of Chos n Dynasty. This study is based on the and analysis of historic documents and drawings including drawings from China and Japan. In order to accomplish this, the drawings for the process of design were studied first, and the techniques of drawing were studied next in comparison with Japanese drawing techniques. Lastly, the technicians of drawing were studied. The results of this study were as follows; 1) Though the procedures of design Choson dynasty were not divided into planning, designing, construction and maintenance just like those of modern society, a variety of drawings in that time were used in each level. 2) The drawings in Choson Dynasty ere divided into Tohyong and Tosol, and mostly, those for design and construction were Tohy ng. 3) Based on the interpretation of Japanese drawings, several suggestions were presented to solve the questions of the drawing techniques for design and construction. 4) The technicians of drawing were the painters who were trained in a government organization in charge of royal paintings. In the future, research of this area should be continued in to deepen study on drawings as historical materials. This research provides meaningful of guidance in the analysis of historic drawing paintings.
최근 건설사업이 복합화되고, 대규모화됨에 따라 다양한 사업 수행주체들간 협업의 중요성은 더욱 강조되고 있는 추세이다. 이러한 수행주체들간의 협업을 위한 의사소통 도구 또는 사업정보의 형태는 매우 다양하게 분포하고 있지만, 전통적으로 설계도면과 공사시방서등 설계도서가 중요한 역할을 담당해 왔다. 특히, 설계도면은 다른 설계도서와 다르게 최근의 정보화흐름에서도 개념설계부터 시공관리 및 유지관리에 이르기까지 보존 형식의 차이는 있지만, 그 효용성 및 정보의 재활용성 측면에 있어서 핵심적인 요소로 등장하고 잇다. 본 논문은 건설CALS/EC를 기반으로 하는 공공건설사업의 설계도면을 표준화하기 위한 시도로서 기본적으로 설계도면에 대한 사용자의 요구사항을 정성적으로 분석하고, 국내와 미국, 일본의 도면 및 제도 표준, 그리고 ISO의 도면 관련 각종 표준들에 대한 현황을 파악하였다. 그리고 건설CALS/EC기반의 설계도면에 대한 사용자 요구사항들을 예측하고, 협업에 기반한 설계도면의 표준화 대상과 이를 위한 협업기능을 정의하였다. 또한, 최근의 국내 도면 표준관련 연구 및 현행 도면 표준 관련 현황 및 실태를 분석한 후, 이러한 분석결과를 토대로 건설산업에 있어서 적용 가능한 미래지향적이며, 협업기능의 극대화를 위한 국내의 도면 표준의 개발 방향을 제시하였다.
현재 실시설계도면 작성과정에서 시간, 비용 등 제한조건으로 인해 실시설계도면 자체의 품질저하가 발생하고 있으며, 시공상세도는 표준화된 기준이 없이 임의적으로 작성되고 프로젝트 완료 후 대부분이 폐기가 되어 설계단계로 피드백 되지 않아 실시설계도면 품질저하의 악순환이 초래되고 있다. 본 연구에서는 실시설계도면과 시공상세도의 품질 향상을 위하여 일반업무시설에 대한 기존 실시설계 체크리스트를 기본으로 공사현장에 요구되는 정보와 시공상세도를 반영하고, 설계자의 설계도면 구성 분류에 따른 검토항목과 시공자의 공사별 분류 방법에 따른 검토항목을 상호 연계함으로써 시공성을 반영한 실시설계도면 체크리스트 개선안을 제시하였다. 실시설계도면과 시공단계가 연계된 공사별 통합 체크리스트의 활용성을 위해 인덱스 매트릭스를 개발하였으며, 실무전문가를 대상으로 심층면담조사를 통해 유효성을 확인하였다.
Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1370-1376
/
2009
Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.
The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.
The purposes of this study was to investigate accuracy and indigenity of landscape plant species in planting design and construction at housing complex and offer basic data for improving precision of planting construction. The scientific name of landscape plant species was described in planting drawings at only two sites among twelve survey sites. According to analysis on indigenity of plant species in planting drawings, it was found that the component ratio of foreign species was the highest and the component ratio of native species at public housing complex was the lowest. The component ratio of landscape plant species in planting construction was severely differed to that of planting drawings. Also the component ratio of cultivar was higher than that of planting drawings due to planting of sevveral cultivars for one species in planting drawings. In the result of accuracy analysis on landscape plant species in planting construction, it was found that mean ratio of inacccurate species was 33.2% at public housing complex, 29.6% at local company housing complex and 26.4% at nationwide company housing complex. It was found that several cultivars were planted for one species in planting drawings. The representative species which were planted by several cultivars were Camellia japonica, Rododendron spp., Prunus spp. and Magnolia spp. and so on. In order to promote the precision and speciality of planting design and construction, scientific and cultivar name of plants should be described in planting drawings.
국내에서는 건설공사지원정보체계의 활용을 촉진하고, 건설공사의 제반 단계에서 발생하는 정보의 상호교류를 촉진하기 위하여 통합건설정보 분류체계를 제안하고 있으나 효율적인 활용방안에 대한 연구의 미흡과 건설공사의 중요한 정보인 설계도서의 체계적인 통합관리를 위한 데이터베이스 (Database : DB) 중심의 전산관리시스템의 구축미비로 인하여 많은 문제점을 야기하고 있다. 이에 본 연구에서는 건설정보 분류체계의 활용과 설계도서의 체계적인 통합관리를 위한 방안으로 데이터베이스 설계하고 이를 웹(Web)기반에서 관리할 수 있는 설계도서 통합관리 시스템을 구축 하였다.
The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.
In order to apply the drywall system to the interior wall of the post & beam structure, the existing detail drawings and construction specifications must be revised. LH selected drywall systems suitable for post & beam apartment housings and revised their standard detail drawings and construction specifications. This paper describes the major revision of the plasterboard partition wall in the LH construction specifications and standard detail drawings. The main policy of the revision work was to prevent defects by ensuring the construction quality and to eliminate adverse effects on the subsequent processes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.