• Title/Summary/Keyword: Construction Documents and Drawings

Search Result 56, Processing Time 0.021 seconds

Representation of Structural Surface for Hull Modeling (선체모델링에 있어서 구조면의 정의 및 표현)

  • Kwang-Wook Kim;Won-Don Kim;Jong-Ho Nam
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.29 no.2
    • /
    • pp.30-37
    • /
    • 1992
  • Since a ship is a complex steel construction which consists of sculptured surfaces and inner surface members, a high technique of information modeling is indispensable to describe the form of hull surface and steel structure members consistently. A model contains both topological and geometrical information of the structural members. Therefore, the hull form should be represented by the wireframe of surface model so that the accuracy in each design stage is satisfied. The structural members like plane surfaces, stiffeners and the relations between such members are to be described systematically in data base. A collection of the data stored in database is a model to be built. The model will be used not only to generate the drawings and documents for ship design and production but also to interconnect other systems such as compartmentation, outfitting, piping, etc. Computer graphics is adopted of the visualization of model.

  • PDF

Design and Implementation of Piping Spool Management Android Application using QR Code (QR Code를 활용한 배관 스풀관리용 안드로이드 어플리케이션 설계 및 구현)

  • Jeon, Sang-Moon;Kim, Kyoung-Su
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.609-616
    • /
    • 2012
  • Plumbing of the plant project is an important discipline. Now workers on the construction site, carry hundreds of piping spool drawings and documents, record the Spool Stage data. Then, The data is input into the system or has been documented in the field office. Because of the work-flow, duplication work occurs. As a result, it is reducing the effectiveness of the Plumbing and causes schedule delays. Also, To manage the integration process, there is a problem, it takes a lot of time. Therefore, The study is conducted to design and implementation of piping spool management Android Application using QR Code. The Application will contribute to the management to the integration of piping work process.

A Study on Information Management Method through the Analysis of Industrial Engineering Basic Design (산업설비 기본설계 단계의 주요업무 분석을 통한 정보관리 방안 연구)

  • Lee, Doo-Hee;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.543-547
    • /
    • 2006
  • Recently domestic companies have been needed to securing competitive techniques due to increasing orders of plant industries in the oversea construction market. Although domestic engineering companies have been assessed competitive in the field of detail design, their high value-added basic design have evaluated uncompetitive. To manage efficiently various contents which occurred in works of design steps, the management method must be built. In this study, we have found the contents which required to management through the definition of main works and analysis of characteristics in the step of basic design. Then, we have suggested to Contents Classification System which reflected of work flows and relations among stakeholders. Proposed Contents Classification System will help us when requiring the proper documents, drawings, sheets and other information.

  • PDF

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

Development of Drawing & Specification Management System Using 3D Object-based Product Model (3차원 객체기반 모델을 이용한 설계도면 및 시방서관리 시스템 구축)

  • Kim Hyun-nam;Wang Il-kook;Chin Sang-yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.124-134
    • /
    • 2000
  • In construction projects, the design information, which should contain accurate product information in a systematic way, needs to be applicable through the life-cycle of projects. However, paper-based 2D drawings and relevant documents has difficulties in communicating and sharing the owner's and architect's intention and requirement effectively and building a corporate knowledge base through on-going projects due to Tack of interoperability between specific task or function-oriented software and handling massive information. Meanwhile, computer and information technologies are being developed so rapidly that the practitioners are even hard to adapt them into the industry efficiently. 3D modeling capabilities in CAD systems are enormously developed and enables users to associate 3D models with other relevant information. However, this still requires a great deal of efforts and costs to have all the design information represented in CAD system, and the sophisticated system is difficult to manage. This research focuses on the transition period from 2D-based design Information management to 3D-based, which means co-existence of 2D and 3D-based management. This research proposes a model of a compound system of 2D and 3D-based CAD system which presents the general design information using 3D model integrating with 2D CAD drawings for detailed design information. This research developed an integrated information management system for design and specification by associating 2D drawings and 3D models, where 2D drawings represents detailed design and parts that are hard to express in 3D objects. To do this, related management processes was analyzed to build an information model which in turn became the basis of the integrated information management system.

  • PDF

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

Case Study on the Overseas Locally-Led Community Design Guidelines (주민참여형 커뮤니티정원 조성 가이드라인 마련을 위한 국외 사례 비교 연구)

  • Lee, Airan;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.117-129
    • /
    • 2018
  • With the changing of social needs and paradigms, citizens are concerned about aesthetic and cultural community gardens from productive urban farms in Korea. It is still difficult, however, to cultivate a beautiful garden with a community to design, install and manage it. Therefore, this study analyzed the community garden design guidelines of other countries to derive the characteristics and implications. The research method analyzed six guidelines for community garden design in the UK, Canada, the USA, Australia and Japan. As a result of the study, most community garden design guidelines are opened freely via on-line service. The guidelines are composed with chronological processes such as intro, site selection, design, construction and maintenance. The introduction section treats definition, purpose, meaning, efficiency and success factors for community gardens. Site selection emphasizes site conditions (soil, light, shadow, water, etc.), landholding and insurance. The design section, however, lacks adequate drawings and case images. These guidelines offer little explanation with few illustrations and sentences. Construction sections explain about plantings, facilities, expense and details. The maintenance guidelines of community gardens contain how to control members, funding, harvesting, pests and plants. In addition, some guidelines include vandalism, organic cultivation methods, recording and advertisement. Lastly, the appendix contains a variety of checklists, administrative documents, guidelines, drawings, and contacts. This study will help understand the trends and characteristics of overseas community gardens design guidelines so as to also supply directions for guidelines to be introduced in Korea.

Communication Awareness Survey and Design Communication Method Using QFD (설계 커뮤니케이션 인식조사 및 QFD를 이용한 설계 커뮤니케이션 방안)

  • Bae, Yujung;Kwon, Won;Cho, Jaeho;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.50-58
    • /
    • 2017
  • The efficient communication process is essential to guarantee the completeness of design and secure the quality to meet the contractor's needs. However, using the existing communication methods based on the design and documents, it is difficult to effectively understand the drawings and specifications that are very complicated, and sufficient technical experiences would be required. Ineffective and inefficient communication among users, designers and project participants during the design process would raise the possibility of functional interferences of the object, induce conflicts, cause a design change, and accordingly incur losses of the project in terms of cost and time. The purpose of this study is to suggest improvement direction of communication in accordance with the requirements, by investigating the present state and the project participants' understanding of design communication. And also, it presents the application model of QFD that the project participants could share and define, and feedback the requirements as well as conducting analysis of improvement factors based on the survey.

A Study on the Management of Subway Structure as an Underground Facility (지하 시설물로서의 지하철 구조물 관리 방안에 관한 연구)

  • 김충평;김감래
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.15 no.1
    • /
    • pp.21-28
    • /
    • 1997
  • Since beginning of subway construction in 1974, for supplying the demand for increasing urban traffic and solving the traffic jam due to expansion of society and elevation of an individual income, the $1^{st}\;and\;2^{nd}$ construction have been almost done and $3^{rd}$ has been driving forward. However, according to an increment of com-mon usage with the passage of time, structures are superannuated and the amount of improvement and repairs keeps on increasing continuous. And many problems are taking place at underground space because of new constructions for underground facilities such as urban gas, electric power, waterworks, and sewerage. In consequence. The consideration of a counterplan for safety is required deeply This study analyzed problems on maintenance of structure about $1^{st}$ class subway, and will present means that a manage civil structures scientifically and systematically by using GSIS concept that imported into several organizations for facility management recently as making digital graphic elements and historic data into a database rather than using an old method - documents and paper drawings.

  • PDF

A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty (조선 후기 원유의 영선체제와 과정에 관한 연구)

  • 전영옥
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF