Proceedings of the Korean Information Science Society Conference
/
2002.04b
/
pp.220-222
/
2002
건설사업을 시행하면서 생성되는 설계도서를 건설CALS/EC 체계에 따라 사업참여주체간에 보다 효과적으로 교환 및 공동 활용하기 위해서는 먼저 설계도서의 전자화가 필요하며 이 때 전자화된 도서는 하드웨어나 소프트웨어에 제약을 받지 않으면서 표준화된 설계도서의 논리 구조가 필요하다. 본 연구에서는 설계도서에 관한 XML DTD(Document Type Definition)을 설계하였다.
International conference on construction engineering and project management
/
2005.10a
/
pp.515-519
/
2005
Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.
Park, Sung-Yong;Yang, Jin-Kook;Kim, Byeong-Ok;Lee, Sang-Beom
Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.48-57
/
2009
As recent construction projects have gradually become larger in size and complex, construction documents such as drawings and specifications revealed the limitations that can not express all the necessary information. Due to the lack of stipulations on the contract, disputes arise among contracting parties. Traditionally, many construction companies in Korea make an unfair agreement with the clients so that the irrational items are included in their contract documents. Potential dispute factors are triggered as a result of misleading or omitted items on the written documents. This paper analyzed the civic counseling cases obtained from the public procurement service in Korea, and identified the potential dispute factors that can occur during pre-dispute stage alone with their influence analysis. The results found from this study can be used for the development of checklists that prevent the dispute in the process of construction projects.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.111-112
/
2015
Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.119-126
/
2001
This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.
Architectural Bureau(建築所, Kunchukso) that Imperial Japan set up in the Dept. of Treasury (度支部, Takjibu) executed many construction works from Oct. 1906 to Aug. 1910. In the meantime, this bureau produced many architectural records. But they were hardly preserved. Because Imperial Japan disposed the architectural records which had the historical value in according to the legal and administrative criteria. Nevertheless, it is important to inquiry precisely the architectural records considerating that the buildings that Architectural Bureau made were the products of government initiated construction and its activities influenced those of similar architectural bureaus after 1910. The results are summarized as follows : First, Architectural Bureau put through all processes from plan, design, executation to examination. Second, Architectural Bureau were producted many architectural records which cotained not only drawings but also various types of documents. Third, Architectural Bureau applied the preservation method at the first time in order to control buildings. Therefore, we can verify many informations that the drawings didn't give by analyzing the architectural records. In conclusion, we can establish the foundation that clarify the facts of buildings under the rule of Japan Imperialism and grasp the meanings if we raise the value of records and draw up the use plan by seeking new the architectural records and dividing them into the several groups on the production organizations.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.273-274
/
2023
Although there are many old school buildings that is more than 40 years in Korea, it is difficult to rebuild all of them due to limitations in budget management. Therefore, objective feasibility evaluation criteria are necessary to determine which school buildings should be rebuilt preferentially among the numerous old school buildings. One of the rebuilding feasibility evaluation items, economic evaluation generally requires documents such as construction statements and facility drawings. However, because most buildings older than 40 years do not have these documents, an economic analysis model that requires only basic building information should be developed. In this study, the economic analysis model that can be used for evaluating the rebuilding feasibility only with the number of years, total floor area, and structural information of school buildings was established. This model can contribute to the objective feasibility evaluation of old school buildings because it can evaluate numerous buildings on the same criteria based on basic building information.
Metropolitan rapid transit system plays an essential role in the public transportation system of any large city, and its managing agency is usually charged with the responsibility of storing and managing the design drawings of the system. The drawings are important and historically valuable documents that must be kept permanently because they contain comprehensive data that is used to manage and maintain the system. However, no study has been performed in Korea on how well agencies are preserving and managing these records. Seoul Metropolitan Rapid Transit Corporation(SMRT) is the managing agency established by the city of Seoul to operate subway lines 5, 6, 7, and 8 more efficiently to serve its citizens. By the Act on Records Management in Public Institutions(ARMPI), SMRT should establish a records center to manage its records. Furthermore, all drawings produced by SMRT and other third party entities should be in compliance with the Act. However, SMRT, as a form of local public corporation, can establish a records center by its own way. Accordingly, the National Archives & Records Service(NARS) has very little control over SMRT. Therefore, the purpose of this study is to research and analyze the present state of storage and management of the drawings of metropolitan rapid transit in SMRT and is to find a desirable method of preservation and management for drawings of metropolitan rapid transit. In the process of the study, it was found that a records center is being considered to manage only general official documents and not to manage the drawings as required by ARMPI. SMRT does not have a records center, and the environment of management on the drawings is very poor. Although there is a plan to develop a new management system for the drawings, it will be non-compliant of ARMPI. What's happening at SMRT does not reflect the state of all other cities' metropolitan rapid transit records management systems, but the state of creation of records center of local public corporation is the almost same state as SMRT. There should be continuous education and many studies conducted in order to manage the drawings of metropolitan rapid transit efficiently by records management system. This study proposes a records center based on both professional records centers and union records centers. Although metropolitan rapid transit is constructed and managed by each local public corporation, the overall characteristics and processes of metropolitan rapid transit projects are similar in nature. In consideration of huge quantity, complexity and specialty of drawings produced and used during construction and operation of metropolitan rapid transit, and overlap of each local public corporation's effort and cost of the storage and management of the drawings, they need to be managed in a professional and united way. As an example of professional records center, there is the National Personnel Records Center(NPRC) in St. Louis, Missouri. NPRC is one of the National Archives and Records Administration's largest operations and a central repository of personnel-related records on former and present federal employees and the military. It provides extensive information to government agencies, military veterans, former federal employees, family members, as well as researchers and historians. As an example of union records center, there is the Chinese Union Dangansil. It was established by several institutions and organizations, so united management of records can be performed and human efforts and facilities can be saved. We should establish a professional and united records center which manages drawings of metropolitan rapid transit and provides service to researchers and the public as well as members of the related institutions. This study can be an impetus to improve interest on management of not only drawings of metropolitan rapid transit but also drawings of various public facilities.
Proceedings of the Korea Information Processing Society Conference
/
2012.04a
/
pp.1269-1270
/
2012
설계 준공도서는 건설공사를 시공하거나 유지 관리에서 필요한 정보를 담고 있는 자료이다. 과거에는 전자설계 준공도서가 단순 보관용으로 사용되어 활용도가 낮았다. 본 연구는 전자설계 준공도서의 활용도를 제고하고 전자설계 준공도서의 적합성 검사, 시스템 등록 서비스 등의 업무처리 시간을 단축시키실 수 있는 전자설계 준공도서 서비스시스템을 개발하였다. 연구결과를 응용하면 항공, 철도 등 다른 건설분야의 전자설계 준공도서 서비스 시스템 개발로 확대할 수 있을 것으로 사료된다.
International conference on construction engineering and project management
/
2013.01a
/
pp.94-102
/
2013
The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.