• Title/Summary/Keyword: Construction Documents and Drawings

Search Result 56, Processing Time 0.025 seconds

A Development of XML-based Electronic Document DTD fort Drawings and Documents on Construction (건설공사 설계도서의 전자문서 DTD 개발)

  • Jeong, Seong-Yun;Kim, Seong-Jin;Ok, Hyun;Na, Hei-Suk
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.04b
    • /
    • pp.220-222
    • /
    • 2002
  • 건설사업을 시행하면서 생성되는 설계도서를 건설CALS/EC 체계에 따라 사업참여주체간에 보다 효과적으로 교환 및 공동 활용하기 위해서는 먼저 설계도서의 전자화가 필요하며 이 때 전자화된 도서는 하드웨어나 소프트웨어에 제약을 받지 않으면서 표준화된 설계도서의 논리 구조가 필요하다. 본 연구에서는 설계도서에 관한 XML DTD(Document Type Definition)을 설계하였다.

  • PDF

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

Identifying and Analyzing Pre-Dispute Factors for Construction Projects (건설공사 사전분쟁요인 도출 및 분석)

  • Park, Sung-Yong;Yang, Jin-Kook;Kim, Byeong-Ok;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.48-57
    • /
    • 2009
  • As recent construction projects have gradually become larger in size and complex, construction documents such as drawings and specifications revealed the limitations that can not express all the necessary information. Due to the lack of stipulations on the contract, disputes arise among contracting parties. Traditionally, many construction companies in Korea make an unfair agreement with the clients so that the irrational items are included in their contract documents. Potential dispute factors are triggered as a result of misleading or omitted items on the written documents. This paper analyzed the civic counseling cases obtained from the public procurement service in Korea, and identified the potential dispute factors that can occur during pre-dispute stage alone with their influence analysis. The results found from this study can be used for the development of checklists that prevent the dispute in the process of construction projects.

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

A Study on the Records Management and the Existing Architectural Archives of Architectural Bureau(建築所, 1906-1910) in Korea (도지부(度支部) 건축소(建築所)(1906-1910)의 기록물 관리와 현존 기록물에 관한 연구)

  • Kim, Tae-Woong
    • Journal of architectural history
    • /
    • v.11 no.3 s.31
    • /
    • pp.7-19
    • /
    • 2002
  • Architectural Bureau(建築所, Kunchukso) that Imperial Japan set up in the Dept. of Treasury (度支部, Takjibu) executed many construction works from Oct. 1906 to Aug. 1910. In the meantime, this bureau produced many architectural records. But they were hardly preserved. Because Imperial Japan disposed the architectural records which had the historical value in according to the legal and administrative criteria. Nevertheless, it is important to inquiry precisely the architectural records considerating that the buildings that Architectural Bureau made were the products of government initiated construction and its activities influenced those of similar architectural bureaus after 1910. The results are summarized as follows : First, Architectural Bureau put through all processes from plan, design, executation to examination. Second, Architectural Bureau were producted many architectural records which cotained not only drawings but also various types of documents. Third, Architectural Bureau applied the preservation method at the first time in order to control buildings. Therefore, we can verify many informations that the drawings didn't give by analyzing the architectural records. In conclusion, we can establish the foundation that clarify the facts of buildings under the rule of Japan Imperialism and grasp the meanings if we raise the value of records and draw up the use plan by seeking new the architectural records and dividing them into the several groups on the production organizations.

  • PDF

Development of Economic Analysis Model for Rebuilding Feasibility Evaluation of Old School Building (노후 학교건물의 개축 타당성 평가를 위한 경제성 분석 모델 개발)

  • Lee, Changsu;Ahn, Heejae;Kwon, Woobin;Kim, Minju;Kim, Harim;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.273-274
    • /
    • 2023
  • Although there are many old school buildings that is more than 40 years in Korea, it is difficult to rebuild all of them due to limitations in budget management. Therefore, objective feasibility evaluation criteria are necessary to determine which school buildings should be rebuilt preferentially among the numerous old school buildings. One of the rebuilding feasibility evaluation items, economic evaluation generally requires documents such as construction statements and facility drawings. However, because most buildings older than 40 years do not have these documents, an economic analysis model that requires only basic building information should be developed. In this study, the economic analysis model that can be used for evaluating the rebuilding feasibility only with the number of years, total floor area, and structural information of school buildings was established. This model can contribute to the objective feasibility evaluation of old school buildings because it can evaluate numerous buildings on the same criteria based on basic building information.

  • PDF

A study on the management of drawings of Metropolitan Rapid Transit (도시철도 도면 관리에 관한 연구 -서울시 도시철도공사를 중심으로-)

  • Kim, Miyon
    • The Korean Journal of Archival Studies
    • /
    • no.11
    • /
    • pp.181-214
    • /
    • 2005
  • Metropolitan rapid transit system plays an essential role in the public transportation system of any large city, and its managing agency is usually charged with the responsibility of storing and managing the design drawings of the system. The drawings are important and historically valuable documents that must be kept permanently because they contain comprehensive data that is used to manage and maintain the system. However, no study has been performed in Korea on how well agencies are preserving and managing these records. Seoul Metropolitan Rapid Transit Corporation(SMRT) is the managing agency established by the city of Seoul to operate subway lines 5, 6, 7, and 8 more efficiently to serve its citizens. By the Act on Records Management in Public Institutions(ARMPI), SMRT should establish a records center to manage its records. Furthermore, all drawings produced by SMRT and other third party entities should be in compliance with the Act. However, SMRT, as a form of local public corporation, can establish a records center by its own way. Accordingly, the National Archives & Records Service(NARS) has very little control over SMRT. Therefore, the purpose of this study is to research and analyze the present state of storage and management of the drawings of metropolitan rapid transit in SMRT and is to find a desirable method of preservation and management for drawings of metropolitan rapid transit. In the process of the study, it was found that a records center is being considered to manage only general official documents and not to manage the drawings as required by ARMPI. SMRT does not have a records center, and the environment of management on the drawings is very poor. Although there is a plan to develop a new management system for the drawings, it will be non-compliant of ARMPI. What's happening at SMRT does not reflect the state of all other cities' metropolitan rapid transit records management systems, but the state of creation of records center of local public corporation is the almost same state as SMRT. There should be continuous education and many studies conducted in order to manage the drawings of metropolitan rapid transit efficiently by records management system. This study proposes a records center based on both professional records centers and union records centers. Although metropolitan rapid transit is constructed and managed by each local public corporation, the overall characteristics and processes of metropolitan rapid transit projects are similar in nature. In consideration of huge quantity, complexity and specialty of drawings produced and used during construction and operation of metropolitan rapid transit, and overlap of each local public corporation's effort and cost of the storage and management of the drawings, they need to be managed in a professional and united way. As an example of professional records center, there is the National Personnel Records Center(NPRC) in St. Louis, Missouri. NPRC is one of the National Archives and Records Administration's largest operations and a central repository of personnel-related records on former and present federal employees and the military. It provides extensive information to government agencies, military veterans, former federal employees, family members, as well as researchers and historians. As an example of union records center, there is the Chinese Union Dangansil. It was established by several institutions and organizations, so united management of records can be performed and human efforts and facilities can be saved. We should establish a professional and united records center which manages drawings of metropolitan rapid transit and provides service to researchers and the public as well as members of the related institutions. This study can be an impetus to improve interest on management of not only drawings of metropolitan rapid transit but also drawings of various public facilities.

A Development of Service System for Electronic Design·Completion Documents and Drawings on Port Construction (항만건설공사 전자설계·준공도서 서비스 시스템 개발)

  • Jeong, Seong-Yun;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1269-1270
    • /
    • 2012
  • 설계 준공도서는 건설공사를 시공하거나 유지 관리에서 필요한 정보를 담고 있는 자료이다. 과거에는 전자설계 준공도서가 단순 보관용으로 사용되어 활용도가 낮았다. 본 연구는 전자설계 준공도서의 활용도를 제고하고 전자설계 준공도서의 적합성 검사, 시스템 등록 서비스 등의 업무처리 시간을 단축시키실 수 있는 전자설계 준공도서 서비스시스템을 개발하였다. 연구결과를 응용하면 항공, 철도 등 다른 건설분야의 전자설계 준공도서 서비스 시스템 개발로 확대할 수 있을 것으로 사료된다.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF