• Title/Summary/Keyword: Construction Cost of Educational Facility

Search Result 17, Processing Time 0.023 seconds

A Basic Study on School Facility Management for Violence Prevention Based on CPTED Method (CPTED이론을 적용한 학교시설물 유지관리 방안 기초연구)

  • Kim, Boo-Young;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.112-113
    • /
    • 2013
  • For prevention of the school violence, many researchers have been conducted the studies based on crime prevention through environment design(CPTED) in the architecture planning phase. However, besides of architecture planning, the study considering the aspect of the facility management is needed during life cycle of educational facilities. In this study, the objective is to propose the effective school facility management for violence prevention based on CPTED method during life cycle of the facilities.

  • PDF

An Analysis of the Construction Period Extension Causes of Environmental Improvement in School Facilities (학교시설 환경개선 공사사례의 공기연장 원인 분석)

  • Maeng, Joon-Ho;Kim, Sung-Joon ;Song, Byung-Joon ;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.22 no.1
    • /
    • pp.13-27
    • /
    • 2023
  • This study analyzed the reasons for extending the construction period considering factors such as the quality of construction materials, safety and cost-effectiveness of construction, size of construction, academic schedule, and local conditions (complaints) when determining the appropriate period for school construction projects tailored to a specific region or educational office. Based on the example of construction projects for school facility improvement by education office A, this study conducted a case study to identify the motives for construction period extension. To determine the appropriate construction period for school facilities, this study conducted a comprehensive review of construction projects under the jurisdiction of education office A, examined data from the Meteorological Data Open Portal, and performed advanced statistical analysis. Future case studies must determine the appropriate construction period for school facilities in a rational and systematics.

A Study on the Investment Priority Item of Educational Facilities using AHP Method;Focused on Elementary ${\cdot}$ Middle ${\cdot}$ High school of Chungcheong-Namdo (AHP기법을 이용한 교육시설물 투자 우선순위 Item 도출에 관한 연구;충청남도 초 ${\cdot}$${\cdot}$ 고등학교를 중심으로)

  • Kim, Sung-Kyum;Lee, Eun-Dong;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.98-102
    • /
    • 2006
  • This study was conducted to derive a priority of investment in educational facilities by collecting and analyzing investment records from elementary, middle, and high schools in Chung Nam area. In addition, the AHP survey and analysis were performed in order to draw the priority item in the educational facility improvement. Students, parents, teachers and a educational facility managers from those schools provided their opinions and data for the AHP study. As a result of the study, the actual investment-cost and a lack of educational facilities were found. A priority item based on the above study was derived which can be used to increase user's satisfaction in the educational facilities. The result of this study can be used as a basis to improve the environment of the educational facilities.

  • PDF

A Study on Cost Estimate for Building Parts in the Schematic Design Phase -Focusing on Educational Research Facility- (부분별 코스트산정법을 활용한 계획설계 비용예측에 관한 연구 - 교육연구시설을 중심으로 -)

  • Kim, Yo-Han;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.18-25
    • /
    • 2011
  • Construction cost estimation in the early phase provides the opportunity to make reasonable decisions related to the project. For estimating this cost, various methods have been developed. But several problems have been recognized like accuracy, relation beteewn design and cost etc. In this study, we developed the method of cost estimating for building parts. The modified method has defferent ratio of space functions to calculate cost more correctly. Also historical cost data is used in this modified method for architects to estimate cost conveniently. By this modified method, we expects architects should easily design buildings based on cost.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

Measurement of Air Contaminants Emission from Interior Finish Material (실내 건축 마감자재의 공기오염물질 방출량 분석)

  • Kim, Yun-Deok;Lim, Soo-Young
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.1
    • /
    • pp.58-65
    • /
    • 2007
  • For the moderns who spend more than 80% of the time inside a building, interior environment became important since it directly affects their health. Recently as noxiousness of the air contaminants of the interior space stood out as well as the above trend, the Ministry of Environment enacted a lawto maintain the interior air quality at certain level of standard in the multi use facility and newly constructed apartment. To make the indoor air clean, removal technology of various contaminants should be developed and interior materials with chemical treatment should be restrained. In other words, selection of interior finish affects indoor air quality from the initial design stage to the construction stage. However, only limited contaminants emission data of building materials are supplied by related companies. There is no average contaminants emission data for overall materials. Moreover, high cost and equipments for one time measurement of VOCs emission of interior finish are the obstacles of active research and data measurement. Therefore, this paper searched the current condition of average VOCs & HCHO emission of various interior finish based on the study requested to research center from the building material company through Stands Test Method for Indoor Air Quality.