• Title/Summary/Keyword: Construction Cost Estimation System

Search Result 181, Processing Time 0.025 seconds

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

An Efficient Attitude Reference System Design Using Velocity Differential Vectors under Weak Acceleration Dynamics

  • Lee, Byungjin;Yun, Sukchang;Lee, Hyung-Keun;Lee, Young Jae;Sung, Sangkyung
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.17 no.2
    • /
    • pp.222-231
    • /
    • 2016
  • This paper proposes a new method achieving computationally efficient attitude reference system for low cost strapdown sensors and microprocessor platform. The main idea in this method is to define and compare velocity differential vectors, geometrically computed from INS and GPS data with different update rate, for generating attitude error measurements which is further used for filter construction. A quaternion based Kalman filter configuration is applied for the attitude estimation with the adapted measurement model of differential vector comparison. Linearized model for Extended Kalman Filter and low pass filtered characteristics of measurement greatly extend the affordability of the proposed algorithm to the field of simple low cost embedded systems. For performance verification, experiment are done employing a practical low cost MEMS IMU and GPS receiver specification. Performance comparison with a high grade navigation system demonstrated good estimation result.

A Development of Work Breakdown Structure and Link to Standard Estimation System for 3D Printing Building (건축물 3D 프린팅 공종분류체계 도출 및 표준품셈 연계방안 제시)

  • Ju, Ki-Beom;Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.702-708
    • /
    • 2018
  • 3D printing technology is attracting increasing attention as a key technology of the fourth industrial revolution that can change the production paradigm of existing industries. The introduction of construction 3D printing technology has been slower than other industries because of the characteristics of the construction field. On the other hand construction automation using 3D printing is required to reduce the production population, as well as improve productivity and safety. In this study, a construction 3D printing work breakdown structure and link method to a standard estimation system were developed as a preliminary preparation for introducing 3D printing to construction. Based on expert consultation on construction and 3D printing, a hypothetical scenario was developed based on existing construction 3D printing technology. According to the scenario, 16 kinds of works required for 3D printing construction work were derived. The existing work breakdown structure and standard estimation system were analyzed, and the 3D printing work was linked. 3D printing works that were the same as the existing breakdown structure were found, and non-existent works were added to the similar breakdown structure. These results are expected to be helpful for future 3D printing construction management and cost estimation. The actual standard estimation system through 3D printing work will need to be calculated.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Quantitative estimation system development for project similarity (주요 건물군의 유사도 정량화 측정 시스템)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.