Analytical Study for Ultimate Behavior of Steel Cable-stayed Bridges under Construction Stage (시공중 강사장교의 극한거동에 대한 해석적 연구)

  • Lee, Joo-Tak;Kim, Seung-Jun;Kim, Jong-Min;Choi, Jun-Ho;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.6
    • /
    • pp.691-704
    • /
    • 2011
  • This paper presents an investigation on the ultimate behavior of steel cable-stayed bridges in the construction stage, considering various geometric nonlinearities and material nonlinearities. To numerically determine the state of cable-stayed bridges in the construction stage, initial shape analysis and construction stage analysis via backward process analysis were done sequentially. Then nonlinear analysis of the state under the construction load condition, considering the weight of the derrick crane and the key segment of the girder loaded onto the tip of the center span, was performed to investigate the ultimate behavior of the structure. The effects of the girder-mast stiffness ratio, the cable-arrangement types, and the area of the stay cables on the ultimate behavior were also extensively investigated. Moreover, the results of the ultimate analysis, considering both geometric nonlinearities and material nonlinearities, were compared with the results of the geometric nonlinear analysis, for a more meaningful investigation of the ultimate behavior of steel cable-stayed bridges in the construction stage.

An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry - (시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 -)

  • Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.148-159
    • /
    • 2012
  • Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.

Satisfaction Level of Construction Quality Management by Survey of The Field Staffs (현장 실무자 대상 조사에 의한 건설공사 품질관리 관련 만족도에 관한 고찰)

  • Park, Hyeong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.34-45
    • /
    • 2009
  • In domestic, the Quality Management system of construction work has been compounded of the association of regulation which is ground for relevant law and operation of Quality Management system by ISO/KS A 9001(QMS) established by the contractor. Two quality guaranteed systems must be operated with complementary and integrated system, but we can not make full use of QMS of contractor and only run routinized quality management system in all construction project by the standard, methods, process provided in the law. These problems were demanded better condition in the past ten years, since the ISO standards have been introduced. Establishing preventive consideration of quality management by setting a goal of drastic quality guarantee is an urgent problem of construction industry. This study is quick to fellow, which should do three things. 1. The attitude survey related quality management of staff in charge in construction site has run. 2. Base on these results, we adjust satisfaction measurement about operation of construction quality management system. 3. Subsequently, we want to offer our thesis about advanced opinion for the next.

Analyzing Relationships between Stock Prices and Business Performances of Construction Companies (건설기업의 주식가격과 경영성과와의 상관관계 분석)

  • Kim Hee-Joon;Kim Myung-Sun;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.76-84
    • /
    • 2003
  • The bankruptcy possibility of construction firms have been higher by the environment of current construction industry. Thus, converting management environment for growth into that for value or profit is required. Nowadays, funds of construction firms is almost provided by financial institutions. As the firms' size grow, they have a form of fund provision through the securities market; however, fair distribution for returns is not practiced by opening company. Especially, construction firms lost trust of Investor by lack of awareness to firm clearness, and then a vicious cycle of no effectiveness in fund provision through securities market is continued again. On this study correlation between stock quotations and primary financial factors of firms in order to grasp actual management condition in construction firms was analyzed. By this, the correlation between stock quotations and the result of firm management was provided. Also, necessity of firm's capital provision was explained, thus ways to ensure firm clearness was searched.

A Study on the Status and Actual Condition of Suspended Buildings in Gangwon (강원도 공사중단 건축물의 현황 및 실태 조사 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.138-144
    • /
    • 2019
  • To analyze the present state of buildings suspended in Gangwon and estimate the compressive strength by visual inspection and Schmidt hammer method in order to analyze durability etc.. In this study, we analyzed the problems that existed in the location where construction is suspended and efficient management method. Expected construction restoration of construction will be restarted, and important parts of the construction site should be given the best protection measures so that the quality can be maintained thoroughly. The construction of the suspended construction is exposed to the freezing and thawing damage over time. Therefore, it is necessary to take measures such as maintenance, and take protective measures by establishing a plan to improve the durability of buildings that are under construction.

A Study on Improvement through a Survey on the Condition of Construction Waste Treatment of Public Institutions (공공발주기관의 건설폐기물처리 실태조사를 통한 개선에 관한 연구)

  • Park, Jeong-Gwon;Lee, Myeong-Eun;Kim, Chang-Hak
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.141-150
    • /
    • 2022
  • The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.

Analyzing the Working Conditions for Female Field Managers Employed by General Contractors

  • Son, Chang-Baek;Shin, Won-Sang;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.441-448
    • /
    • 2013
  • In recent years, the number of female workers pursuing careers in the construction engineering and management field has increased, despite the fact that the job positions have been traditionally considered as retaining job functions and/or qualities that are more appropriate to male than female. This may be attributed to the fact that the positions also require delicate and/or detail-oriented job functions, which can be successfully performed by female. It is important for project participants to understand the working conditions for female field managers by analyzing their job performance. This study collects expert opinions regarding female's managerial performance on job site. Survey questionnaires were administered to two focus groups, male and female field managers who work for general contractors. This study contributes to encouraging female's social and economic involvement by investigating the challenges they face in the workplace, and provides measures to respond to such challenges.

A Study on the Design of Two-Span Continuous P.S. Composite Bridges (2경간 P.S. 연속합성보 교량의 설계에 관한 연구)

  • 구민세;신동기;이재혁
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1995.04a
    • /
    • pp.203-210
    • /
    • 1995
  • A construction method for continuous prestressed Composite Bridges(PCB's) is developed and successfully applied to the design of two-span continuous PCB's of five different span lengths. The construction of continuous PCB's goes through 17 different loading conditions. for each loading condition, the allowable stress design method is used to determine section properties. The analytical results of two-span continuous PCB's arc compared with those of simple PCB's. The comparison shows that the use of the proposed method can reduce 10-15 percents of the concrete section area and approximate 28 percents of the steel section area, as well as 5-8 percents of the girder height. The study indicates that the use of the proposed PCB's method can significantly reduce construction and maintenance costs of bridges.

  • PDF

A Study on the Transmission Tower Foundation Design and Construction Method - A Focus of Cylindrical Foundation - (가공 송전 철탑기초 설계 및 시공 방법 연구 - 심형기초를 중심으로 -)

  • Jang, Suk-Han;Kim, Hee-Kwang;Lee, Kang-Hyeon;Han, Kyung-Soo;Ham, Bang-Wook;Chung, Ki-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.6
    • /
    • pp.1031-1034
    • /
    • 2007
  • Electric transmission lines pass through a variety of area. Foundation supporting the conductors and tower are selected properly in accordance with external load, for example dead load, wind load, snow load, construction load etc, and topography and geology condition. Typical types of foundation are as follows: pad foundation for small load and hard soil or rock in mountainous area, pile foundation for medium or large load and soft soil in plain field area. This paper introduced cylindrical foundation design & construction for large load and mountainous area. This foundation failure mode against pulling-out show splitting failure by tensile force toward circumferential direction.

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF