The equation of end bearing capacity is applied differently depending on the type of pile, construction method, and load characteristics considering the construction standards. The bearing capacity equation of the design standard is presented in various ways according to the design conditions such as construction method and ground condition, etc. but, It does not reflect the ground strength according to the SPT-N value of weathered rock. This study analyzed the trend of allowable tip bearing capacity by pile diameter through about 480 dynamic loading tests conducted for the construction/quality management of piles for the last 6 years since 2015. The equation for the ultimate end bearing capacity per unit area according to the SPT-N value is presented. The proposed formula of ultimate end bearing capacity per unit area can be applied in the range of 15,000kN/m2 to 30,000kN/m2. The proposed formula, which complements the existing formula, enables pile design and construction/quality management.
Defects caused by apartment houses have the term of warranty liability according to the enforcement ordinance of Acts of the Management of Apartment Houses. In case when defects occur during the term, free defect maintenance can be provided from the construction company. Yet, there occur conflicts between the construction company and residents, as to whether there occur defects or not. To resolve these conflicts, this study aimed to analyze construction classification and types that need managing, based on defects of apartment houses occurring during the term of warranty liability. This research analyzed 138,576 cases of data, as of five apartment house complexes. For the construction classification for defects of apartment houses, wooden flooring products accounted for the highest rate, followed by paper hanging, and wooden window. For the construction types of defects, torn/scratching took up with the highest rate, followed by the condition of defect in fixing and operating. In order to embody defects occurring during the term of warranty liability, into the visualization technique, this researcher utilized the word cloud method. This study will pursue the method for maintaining defects during the term of warranty liability, in the subsequent research, using the data that this research presented.
The 6th International Conference on Construction Engineering and Project Management
/
pp.221-225
/
2015
To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.
The 6th International Conference on Construction Engineering and Project Management
/
pp.683-684
/
2015
Project Financing (PF) is the long-term financing of infrastructure and industrial projects based upon the projected cash flows of the project rather than the balance sheets of its sponsors. However, the financial institution, the subject of financing in the case of PF in Korea, the lack of validation system of business, rather than to assess the feasibility of the project, requested a credit reinforcement to the construction company, the fact is Construction Company on loans of the employer is the guarantor or debt argument commitments accordingly. As a result, PF contingent liabilities, which are indirect debt, are triggered in the construction company, not included in the financial statements, along with the disclosure standards established according to 2009 PF contingent liabilities, and major can be a management item. In this study, PF contingent liabilities is of Pearson of the index and the PF debt ratio showing the main financial ratios and risk by classifying the credit rating and contractors Ranking of construction companies in order to analyze the impact on the financial condition of the company was performed correlation analyzes, through the Pearson correlation coefficient analysis indicated quantitative or negative relationship to derive the explicit indication.
터널 굴착시 굴진면 전방의 지반상태를 사전에 파악하는 것은 터널의 안정성을 증가시킴과 동시에 시공성을 향상시켜 경제적인 터널 시공을 할 수 있도록 한다. 이에 본 연구에서는 터널 천공시 획득되는 천공데이터를 이용하여 굴진면 전방의 암반강도를 예측하고자 하였다. 이는 암반강도가 현장에서 암반분류 및 지보패턴 설계 등의 핵심인자로 가장 보편적으로 활용될 뿐만 아니라, 암반강도의 변화를 통해 굴진면 전방의 지반상태 변화를 예측하는데도 활용할 수 있기 때문이다. 이를 위해 본 연구에서는 다양한 강도 특성을 보이는 균질한 암석시험편을 대상으로 착암기 종류를 변화시켜가며 천공실험을 수행하였다. 실험결과 천공속도는 다른 천공데이터들과 착암기의 종류 및 암석의 강도에 따라 고유한 값을 보이는 것으로 나타났다. 또한, 동일한 암석에 대해 천공시 타격압이 증가하면 천공속도는 선형적으로 비례하여 증가하는 것으로 나타났다. 이러한 결과를 바탕으로 본 연구에서는 터널 시공 현장에서 착암기의 제원, 현장 계측 데이터 및 천공속도와 암반강도의 상관관계를 이용하여 터널 굴진면 전방의 암반강도를 예측할 수 있는 방안을 제안하였다.
Many construction equipment or supporting structure should be installed in a field without appropriate anchorage to cause a collapse of those. Anchor length, anchor diameter, hooked or non hooked will be made and tested in the study. This one will be analyzed and compared with the previous study in order to find out some difference, strength by strength, based on this study. Embedded re-bar and the resistant capacity against pulled out force of re bar have been tested and analyzed by concrete design strength and rebar diameter in the study. 21Mpa and 24MPa compressive strength which are used in construction practice have been applied as variables. Those rebars are composed of D13, D16. D22 which are mostly used at construction sites. The followings are summarized as conclusions.1) ductility is not increased as rebar diameter becomes larger under the condition of non-hooked anchorage.2) those are two times of displacement difference between small diameter of rebar and large one with hooked anchorage of rebar while being 1/10 times difference with non-hooked condition but, only 10% difference of maximum load are shown, not conspicuously between hooked and non-hooked condition.3) displacement related to ductility can be three(3) times decreased if only concrete compressive strength and rebar diameter become larger with heavy support weight.
This paper presents an effective construction method of adaptive multiple control systems utilizing some knowledge upon the plants. The adaptive multiple control system operates plants un-der widely changing environmental conditions. The adaptive multiple control system is composed of a family of candidate controllers together with a supervisor. The system does not require any identification schemes of environmental conditions. Monitoring outputs of the plant, the supervisor switches from one candidate controller to another, The basic ideas of adaptation are as follows: (1)each candidate controller is prepared for each environmental condition in advance; (2)the supervise. applies a sequence of speculative controls to the plant with candidate controllers just after the start of control or just after the detection of a change in the environmental condition. Each candidate controller can keep the system stable during one-step period of the speculative control and the most appropriate candidate controller for the environmental condition to which the system is exposed can be selected before the last trial of speculative control step comes to an end. We proposed a construction method of adaptive multiple control system without any knowledge of plant dynamics and applied the method to a cart-pole balancing problem and a vehicle anti skid braking system. In real applications, as we can often easily obtain a piece of knowledge upon plant dynamics beforehand, we intend to extend the method such that multiple control systems can be efficiently designed using the knowledge. We apply the new idea to the cart-pole balancing problem with variable length of the pole. The simulation experiments lead us to the conclusion that the new attempt can reduce the manpower to design the candidate controllers for adaptive multiple control systems.
Although it is important to reflect the accurate information of the ground condition in the tunnel design, the analysis and design are conducted by limited information because it is very difficult to get it practically on considering various geography and geotechnical condition. So construction management of information concept is required to manage immediately on the field condition because it is very time-consuming to establish the countermeasure of underground reinforcement and the pattern change of Bo. Therefore, when construction is on tunnel area, examination of accurate safety and prediction of behavior is performed to overcomes the limit of predicting behavior by using Artificial Neural Network(ANN) in this study. Firstly, the field data was secured. Secondly, suitable structure was made on multi-layer perceptrons among the ANN. Thirdly, learning algorithm-propagated applies to ANN. The data for the learn of field application using ANN was used by considering impact factors, which influenced the behavior of tunnel, and performing credibility analysis. crown displacement, spring displacement, subsurfacement, and rock bolt axial force are predicted at the tunnel construction and on-site application was confirmed by using ANN from analyzing and comparing with measurement value of on-site. In this study, the data from Seoul Highway $\bigcirc\bigcirc$ tunnel section was applied to the ANN Theory, and the analysis on the investigate value and the reasoning for the value associated with field application was performed.
콘크리트의 수축으로 인한 균열가능성 평가에 있어서 대부분의 경우 콘크리트를 균질한 물질로 가정하는 방식으로 접근하고 있다. 그러나 이러한 방식으로 접근할 경우 불구속조건 하의 콘크리트에서 자기수축으로 인한 미세균열(micro-cracking) 현상을 평가하는 것이 불가능함과 동시에 콘크리트 내부의 균열 발생 현상을 이해하는데 한계가 있다. 이에 이 연구에서는 시멘트 모르타르 시험체를 가지고 실험적으로는 음향방출(acoustic emission) 장비를 사용하여 내부 균열 발생량을 측정 및 평가하였으며, 이론적인 접근방식의 일환으로 실제 모르타르 시험체로부터 구하여진 이차원 이미지를 사용하여 NIST에서 개발한 OOF code로 유한요소해석을 수행하였다. 실험 및 해석 결과, 모르타르의 내부에서 시멘트 페이스트상의 수축 및 골재의 내부구속으로 인하여 발생하는 미세균열 발생 현상을 보다 현실적으로 이해할 수 있었다.
콘크리트의 열화는 현재 전세계적인 관심 분야로서 가장 보편적인 열화원인은 염해이다. 이를 고려한 내구수명 예측기법의 개발은 토목건설 기술에 매우 중요한 부분을 차지하고 있으나, 대부분의 기존의 연구는 수명예측에 대한 기법에 집중되어 왔을 뿐, 콘크리트 표면의 미세 기후조건을 고려한 환경 분석은 매우 드문 실정이다. 그러나 콘크리트의 내구성은 표면의 특성에 의해 지배되므로, 실질적으로 표면상태에 대응한 미세 기후조건을 연구하여 환경대응 인자로 정립할 필요가 있다. 본 연구는 현장 기후조건을 계측하여 콘크리트의 미세기후조건을 해석할 수 있는 방법을 제안하였다. 이 결과는 염소이온 확산계수와 같은 재료 매개변수에 반영하여 더욱 정밀한 수치 해를 얻는데 이용되었다. 본 연구는 콘크리트의 내구성 설계기법을 개발하기 위하여, 환경인자에 대응한 매개변수를 도출하는데 이용될 수 있을 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.