• Title/Summary/Keyword: Construction Analysis

Search Result 16,173, Processing Time 0.044 seconds

A Analytical Study on Governmental Regulation for the Promotion of Construction Technology Development (건설기술개발 촉진과 연계된 제도분석 연구 - PQ 기술개발평가항목과 특허출원추이와의 비교분석을 중심으로 -)

  • Kim, Jae-Wook;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.140-153
    • /
    • 2008
  • The recent stagnation of construction market draw more attention to construction technology development which is believed to be playing a important role in increasing the competitiveness of the construction industry. Thus, increasing pressures has been on the government playing a catalytic role of strengthen technology competitiveness. Hereupon, this study analyzed technology skill evaluation items of the Pre-Qualification system to facilitate construction technology development at the national level and tried to show the correlation between the PQ system and patent application through multilateral analysis of patent applications. Analysis results are intended to provide basic reference in decision-making process related to governmental regulation improvement especially on the PQ system. This research also attempted to draw implications to increase the use of technology related regulations such as patent & utility model based on PQ system analysis results. To do so, a comprehensive trend Analysis on the PQ system has been conducted from the view points of construction technology. Similar analysis has been done with the patent system & Utility model system. Based on Analysis result, implications of regulation improvements was outlined to promote construction technology development, due to eventually increase the competitiveness of Korean construction industry.

Determinants of Efficiency of Specialty Construction Companies Using DEA and Tobit Regression Models (DEA와 토빗회귀 모형을 이용한 전문건설기업 효율성 결정요인 분석)

  • Jung, Dae-Woon;Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.45-55
    • /
    • 2024
  • This study analyzed the efficiency determinants of specialty construction companies by industry using the DEA model and the Tobit model. The analysis targets are 394 specialty construction companies as of 2022. As a result of analysis of efficiency determinants using 12 company characteristics as independent variables, the biggest problem for specialty construction companies was overall efficiency reduction due to rising labor costs. In addition, in a situation where construction companies' loan regulations are severe, the debt ratio was found to have a positive effect on efficiency. Company size had a different impact by industry, and the number of businesses held, credit score, and total capital turnover had an effect only on some industries. This study presents results that are an advance on existing research in that it strategically analyzes factors for improving the efficiency of specialty construction companies. However, it has limitations such as limiting the analysis to only specialty construction companies subject to external audit, insufficient number of companies subject to analysis by industry, and analyzing relative efficiency in the same category for each industry.

Development of Back Analysis Program for Total Management Using Observational Method of Earth Retaining Structures under Ground Excavation (지반굴착 흙막이공의 정보화시공 종합관리를 위한 역해석 프로그램 개발)

  • 오정환;조철현;김성재;백영식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10c
    • /
    • pp.103-122
    • /
    • 2001
  • For prediction of ground movement per the excavation step, observational results of ground movement during the construction was very different with prediction during the analysis of design. step because of the uncertainty of the numerical analysis modelling, the soil parameter, and the condition of a construction field, etc. however accuratly numerical analysis method was applied. Therefore, the management system through the construction field measurement should be achieved for grasping the situation during the excavation. Until present, the measurement system restricted by ‘Absolute Value Management system’only analyzing the stability of present step was executed. So, it was difficult situation to expect the prediction of ground movement for the next excavation step. In this situation, it was developed that ‘The Management system TOMAS-EXCAV’ consisted of ‘Absolute value management system’ analyzing the stability of present step and ‘Prediction management system’ expecting the ground movement of next excavation step and analyzing the stability of next excavation step by‘Back Analysis’. TOMAS-EXCAV could be applied to all uncertainty of earth retaining structures analysis by connecting ‘Forward analysis program’ and ‘Back analysis program’ and optimizing the main design variables using SQP-MMFD optimization method through measurement results. The application of TOMAS-EXCAV was confirmed that verifed the three earth retaing construction field by back analysis.

  • PDF

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Effective Analysis Framework for Construction Post Evaluation (건설공사 사후평가 수행결과의 효과적인 분석방법)

  • Kim, Tae Yeong;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1145-1152
    • /
    • 2016
  • A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.

An Analysis of Constructability and Economic Efficiency for Pipe Work using Insert & Coupling Joint Method (일체형 삽입식 신속 연결구를 이용한 건축 배관 연결 공법의 시공성 및 경제성 분석)

  • Kim Tae-Hoon;Kim Dae-Won;Suk Sung-Joon;Park Chul;Lee Jun-Seo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.189-194
    • /
    • 2006
  • The internal construction industry is not situation of cost reduction based on low wages anymore by the increase in wages as insufficient supply of stilled workers. Recently remodeling constructions that only need to change facilities as to stay the existing structures are on the increase. Now the method of piping facility used to remodeling construction needs stilled workers, large work space and a variety of tools. These complex construction process have a difficulty of high-quality and economical construction. In addition it have the hish incidence of warranty and a problem of cost increase as a commitment of manpower by warranty repair. In order to solve these problems it is necessary for appropriate new technology to the internal construction environment. Piping fittings by Insert & Coupling Joint is a method that unskilled workers can be easily constructed though one touch set up and it is convenient to maintain for repair work of piping facility. This technology show the effect of 3 percentages labor cost reduction as compared with piping fittings by press joint on apartment 500 households. Therefore this technology is supposed that attain a cost reduction though the technical and economical construction and a client satisfaction though the high-quality construction on the present construction market.

  • PDF

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

A Study on Survey and Analysis for the Standardization to Information Attribute of Construction Material (건설자재 정보속성 정형화를 위한 조사 ${\cdot}$ 분석적 연구)

  • Han, Choong-Han;Ju, Ki-Bum;Kim, Hyung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.768-773
    • /
    • 2007
  • Standardization to information attribute of construction material is continuous demanded through the life cycle of a construction project, and the productivity elevation is derived of contribution effect in construction market. This study surveyed the means of acquisition and attribute of information to a staff in purchase, which are effected on the revitalization of information circulation to the construction material Proposed the standardization to information attribute of construction material that is based on improvement and application to the information attribute. And information attribute is classified with construction process through analysis on test list of quality certification. This study also suggested representative attribute of quality information, for the elevation of safety and quality in construction industry. Therefore, logicality of common information is based by analysis of mathematical statistics, systemicity of quality information is applied by MasterFormat(2004)

  • PDF

Potential use of local waste scoria as an aggregate and SWOT analysis for constructing structural lightweight concrete

  • Islam, A.B.M. Saiful;Walid, Walid;Al-Kutti, A.;Nasir, Muhammad;Kazmi, Zaheer Abbas;Sodangi, Mahmoud
    • Advances in materials Research
    • /
    • v.11 no.2
    • /
    • pp.147-164
    • /
    • 2022
  • This study aims to investigate the influence of scoria aggregate (SA) and silica fume (SF) as a replacement of conventional aggregate and ordinary Portland cement (OPC), respectively. Three types of concrete were prepared namely normal weight concrete (NWC) using limestone aggregate (LSA) and OPC (control specimen), lightweight concrete (LWC) using SA and OPC, and LWC using SA and partial SF (SLWC). The representative workability and compressive strength properties of the developed concrete were evaluated, and the results were correlated with non-destructive ultrasonic pulse velocity and Schmidt hammer tests. The LWC and SLWC yielded compressive strength of around 30 MPa and 33 MPa (i.e., 78-86% of control specimens), respectively. The findings indicate that scoria can be beneficially utilized in the development of structural lightweight concrete. Present renewable sources of aggregate will preserve the natural resources for next generation. The newly produced eco-friendly construction material is intended to break price barriers in all markets and draw attraction of incorporating scoria based light weight construction in Saudi Arabia and GCC countries. Findings of the SWOT analysis indicate that high logistics costs for distributing the aggregates across different regions in Saudi Arabia and clients' resistant to change are among the major obstacles to the commercialized production and utilization of lightweight concrete as green construction material. The findings further revealed that huge scoria deposits in Saudi Arabia, and the potential decrease in density self-weight of structural elements are the major drivers and enablers for promoting the adoption of lightweight concrete as alternative green construction material in the construction sector.

KOREAN CONSTRUCTION PROJECT MANAGER'S CAPABILITY CHANGE OVER THE LAST DECADE

  • Soun JO;Hyunsang CHO;Seeun CHOI;Minji BAEK;Jimin KIM;Hyounseung JANG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.761-768
    • /
    • 2024
  • The South Korean construction industry has grown larger and more complex through collaboration with various fields. In the construction industry, faced with the era of the 4th Industrial Revolution, the importance of project managers is growing for successful construction projects. Amid these changes, it is necessary to grasp the capabilities and importance of project managers for the development of the South Korean construction industry and analyze how they affect it. This study aims to review the required capabilities of the project manager and suggest implications with a comparison of current capabilities and importance. To this end, a survey was conducted on the importance and Performance of the project manager. Using collected data, changes in capabilities are identified by comparing the Performance and importance of project managers respectively in 2010 and 2022 through the Importance - Performance Analysis (IPA) method. The analysis results show changes in the Performance and importance of project managers according to changes in the construction environment, and the insufficient capabilities of them. Based on this research, it is expected that efficient construction management will be possible amid changes in the construction environment by presenting the method to improve necessary capabilities to project managers in South Korea.