In the early stages of a construction project, the most important thing is to predict construction costs in a rational way. For this reason, many studies have been performed on the estimation of construction costs for apartment housing and office buildings at early stage using artificial intelligence, statistics, and the like. In this study, cost data held by a provincial Office of Education on elementary schools constructed from 2004 to 2007 were used to compare the multiple regression model with an artificial neural network model. A total of 96 historical data were classified into 76 historical data for constructing models and 20 historical data for comparing the constructed regression model with the artificial neural network model. The results of an analysis of predicted construction costs were that the error rate of the artificial neural network model is lower than that of the multiple regression model.
Recently, the number of accidents reported involving foreign laborers has risen, and the need to prevent accidents at construction sites has become more urgent. It has been found that 90 percent of construction accidents are caused by unsafe work practices, and various studies have been conducted on these practices with the aim of preventing accidents at construction sites. However, the tendency with previous studies was to average the results of survey responses, and as a result it is impossible to consider the potential risk of how many foreign laborers feel unsafe in relation with the unsafe practices. Therefore, in this study, importance-performance analysis (IPA) was improved in order to assess the potential risk of the unsafe practices of foreign laborers at construction sites in Korea. To verify the applicability of the improved IPA, a survey was carried out, and then the results were compared with those of the IPA. Through the use of the improved IPA, unsafe practices that were not found in the previous IPA but have potential risk were identified. The method proposed in this study is expected to contribute to the prevention of construction accidents of foreign workers by enabling a more efficient management.
This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.
오늘날 건설수요는 고도화, 프로젝트의 대형화, 공사여건의 복잡화와 같은 외부환경에 의해 변하고 있다. 이에 정부에서는 외부환경의 변화에 적절히 대응하고자 선진화된 발주방식을 도입하였다. 그러나 이러한 의도와는 달리, 기 발주된 프로젝트에서는 발주방식별 장 단점 등이 효과적으로 나타나지 못하고 있다. 이러한 원인은 사업의 기획단계에서 발주방식을 선정할 때 사업의 특성을 충분히 반영하지 못하는 현재의 "대형공사 입찰방법 심의기준"에서 그 원인을 찾을 수 있다. 따라서 본 연구는 프로젝트의 특성에 따른 적절한 발주방식을 적용하기 위하여 공동주택 건설공사의 발주방식에 영향을 주는 영향요인을 분석하고자 한다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1396-1403
/
2009
The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.
Davari, Saman;Shahinmoghadam, Mehrzad;Motamedi, Ali;Poirier, Erik
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.1122-1129
/
2022
The concept of Digital Twin (DT) has been receiving an increasing amount of attention in the construction management and building engineering research domains. Although the benefits of DT are evident, confusion with regards to the concept of DTs and its relationship with others such as Cyber-Physical Systems (CPS), Building Information Modelling (BIM) and Internet of Things (IoT) remains. This paper aims to help allay this confusion through an in-depth analysis of the definition of DT and its unique characteristics. As such, a review of the past and current definitions of DT and CPS in various domains is performed. An analysis is then conducted to identify the overlaps between the definition of DT with CPS, as well as with BIM and IoT. Finally, given the relatively closer resemblances between DT and CPS, a set of four distinct dimensions enabling their comparative analysis and highlighting their shared and unique characteristics is discussed. This paper contributes to the existing literature by exploring the definition of DT and presenting two original conceptualizations that help further refine the concept of DT in the construction and management and building engineering domain.
As data management and analysis technology advances, there is active discussion on how to utilize data generated in construction projects. Among them, the materials produced during the supervision work are highly useful because their generation cycle and format are regulated according to relevant laws. In this study, we analyzed whether the data produced during the supervision work in the construction phase of apartment housing can be utilized for project performance management. First, this study identified key data necessary for performance management through FGI with experts in the field of apartment housing. Next, we collected supervisory data from the case project and identified whether the data was generated, its cycle, and storage format. As a result of the analysis, the supervisory data contained various information that could measure the performance of construction projects and had the advantage of standardized data. In the future, utilizing supervisory data is expected to enable effective performance management of apartment housing construction projects.
The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.
In recent year, the u-City construction projects which integrate IT technology into urban infrastructures are being pushed forward by many local governments. These projects contain various purposes in an aspect of regional economy : to reinforce a competitiveness of region by increasing efficiency of urban managements and to revitalize regional economy by stimulating the regional high-tech industries that related to u-City construction. In this context, regional economic impact assessment of u-City construction projects is particularly important because, it give us information about effectiveness of u-City construction policy as a stimulus of regional high-tech industries and the policy feasibility of u-City construction projects that can be a base of public projects. However, it is challenging to assess the impact of u-City projects on regional economy properly due to a lack of understanding about industrial classification, and specific industrial inputs related to u-City construction. In this study, we suggest u-City industrial classifications, and specific-industrial inputs induced by u-City construction projects based on associated legislations, business report for a u-City construction, and results from previous studies. Using these classification and industrial input, we also investigate the regional economic impacts of a u-City construction project in Wha-sung and Dong-tan cities employing Input-output analysis. The empirical results suggests that u-City industries have relatively high in production inducement, and value added inducement compared to input of other industrial sectors. These results indicate that regional economic impact of a Wha-sung and Dong-tan u-City construction project are relatively high, but economic impacts of u-City construction projects vary according to the regional industrial structure, and the specific expense accounts of u-City construction projects.
건설 분야의 산업재해가 차지하는 비율은 전체 산업의 29%로 고위험군산업에 해당한다. 또한 다양한 공정이 존재하며, 소수의 관리자가 다수의 근로자를 관리하고 감독하는 특성상 위험도 관리가 필수적이다. 따라서 공사의 종류 및 공법에 따라 체계적이고 과학적인 위험도분석 방안을 마련해야 하며, 작업현장의 위험도를 점진적으로 완화하고 개선해야한다. 본 연구에서는 도로 교량공사 공종별 안전사고 발생확률 자료 및 전문가 데이터를 기초로 하고 확률론적 접근 방법인 몬테카를로 시뮬레이션을 활용하여 신뢰도 있는 위험지수를 산정할 수 있는 방안을 제시하고 평가하였다. 리스크 식별은 도로 교량공사를 토공사, 배수공사, 교량공사로 구분하여 전문가 데이터를 바탕으로 발생가능한 안전사고를 분류하였다. 도로 교량공사의 토공사, 배수공사, 교량공사의 세부공종별로 위험지수를 도출하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.