• Title/Summary/Keyword: Construction Analysis

Search Result 15,928, Processing Time 0.039 seconds

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

Accuracy Analysis of Road Surveying and Construction Inspection of Underpass Section using Mobile Mapping System

  • Park, Joon Kyu;Um, Dae Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.2
    • /
    • pp.103-111
    • /
    • 2021
  • MMS (Mobile Mapping System) is being used for HD (High Definition) map construction because it enables fast and accurate data construction, and it is receiving a lot of attention. However, research on the use of MMS in the construction field is insufficient. In this study, road surveying and inspection of construction structures were performed using MMS. Through data acquisition and processing using MMS, point cloud data for the study site was created, and the accuracy was evaluated by comparing with traditional surveying methods. The accuracy analysis results showed a maximum of 0.096m, 0.091m, and 0.093m in the X, Y, and H directions, respectively. Each RMSE was 0.012m, 0.015m, and 0.006m. These result satisfy the accuracy of topographic surveying in the general survey work regulation, indicating that construction surveying using MMS is possible. In addition, a 3D model was created using the design data for the underpass road, and the inspection was performed by comparing it with the MMS data. Through inspection results, deviations in construction can be visually confirmed for the entire underground roadway. The traditional method takes 6 hours for the 4.5km section of the target area, but MMS can significantly shorten the data acquisition time to 0.5 hours. Accurate 3D data is essential data as basic data for future smart construction. With MMS, you can increase the efficiency of construction sites with fast data collection and accuracy.

BIM-based Priority Activity in Construction Standard Unit Price (BIM기반 표준시장단가 우선적용 공종 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.204-205
    • /
    • 2022
  • Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.

  • PDF

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Analysis of Causes of Conflict in Construction Projects (건설공사에서의 갈등원인 연구)

  • Oh, Guk-Yeol;Lee, Young-Dai;Kim, Chang-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.473-478
    • /
    • 2007
  • The construction industry is huge-there are lots of project organizations and many different people who work on them. Conflict will occur in any long - term relationship and it happens in personal, professional, family, and social relationships. Disputes between parties to construction projects are of great concern to the industry. The study of construction industry disputes, and the causes of those disputes, is essential. The purpose of this study is to identify the root causes of conflicts in construction industry. A questionnaire field survey was conducted to investigate the root causes of construction conflicts. The professionals working for owner, contractor and consultants were targeted for the collection of data. Descriptive analysis such as mean score and standard deviation as well as factor analysis was employed to find underlying factors related to conflicts in construction field. Student's t-test and ANOVA test tools were used to compare the perceptions of various categories of population and project. Factor analysis was used to group the numbers of conflict causes. This study reveals four root causes of construction conflict. They are: (i) weak project leadership (ii) weak contractor selection (iii) weak project management, and (iv) project participants' attitude.

  • PDF

Analysis of Relationship between Construction Accidents and Particulate Matter using Big Data

  • Lee, Minsu;Jeong, Jaewook;Jeong, Jaemin;Lee, Jaehyun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.128-135
    • /
    • 2022
  • Because construction work is conducted outdoors, construction workers are affected by harmful environmental factor. Especially, Particulate Matter (PM10) is one of the harmful environmental factors with a diameter of 10㎍/m3 or less. When PM10 is inhaled by human, it can cause fatal impact on the human. Contrary to the various analyses of health impact on PM10, the research on the relationship between construction accidents and PM10 are few. Therefore, this study aims to conduct the relative frequency analysis which find out the correlation between construction accidents and PM10, and the modified PM10 grade is suggested to expect accidents probability caused by PM10 in the construction industry. This study is conducted by four steps. i) Establishment of the database; ii) Classification of data; iii) Analysis of the Relative Frequency of accidents in the construction industry by PM10 concentration; iv) Modified PM10 groups to classify the impact of PM10 on accident. In terms of frequency analysis, the most accidents were occurred in the average concentration of PM10 (32㎍/m3). However, we found that the relative frequency of accident was increased as the concentration of PM10 increased. This means the higher PM10 concentration can cause more accidents during construction. In addition, PM10 concentration was divided as 6 groups by the WHO, but the modified PM10 grade by the relative frequency on accident was suggested as 3 groups.

  • PDF

The study for accidents prevention through the analysis of construction machinery-related accidents (건설기계로 인한 재해특성 분석을 통한 예방 방안)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.71-79
    • /
    • 2014
  • The scale of construction industry recently tends to become bigger and larger in line with development of construction technologies and methods. Although increasing usage of construction machinery has led to improving productivity, reducing schedule and cost, constructions workers have been exposed to unstable work environment, causing more and more accidents. Construction machinery-related laws and regulations has not been enacted and reflected the conditions and circumstances of the construction industry in a timely manner. A various construction machinery and equipments produced and changed in structure randomly are so widely used that related-accidents may occure gradually. Propose a plan for accidents prevention through the analysis of characteristics and cases on construction machinery-related accidents over the past five years from 2009 to 2013.

Priority Analysis for Developing Construction Automation Technology using the IPA (IPA를 활용한 건축시공 자동화 기술개발 우선순위 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.173-174
    • /
    • 2016
  • Domestic construction industry has trouble in ensuring competitiveness by aging of skilled labors and lack of innovation in construction technologies. Under the current circumstances, the construction automation technology becomes an useful alternative for enhancing competitiveness through productivity, quality and safety improvement. Thus, this study analyzes the priority in developing construction automation technology using IPA technique. The results show that repetitive and heavy material-included activities have high priority, and will be used as preliminary data for establishing reasonable target and range of construction automation.

  • PDF

A Study on the Reliability Improvement of Safety Management System in Major Construction Companies - Focused on G Construction Company - (대형건설업체의 안전성 확보를 위한 안전경영시스템의 신뢰도 개선 방안 -G 건설사를 중심으로-)

  • Cho, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.101-108
    • /
    • 2013
  • Industrial disaster caused the deaths of 2,114, construction workers among them was the highest of 621 deaths. In the construction industry, has established a number of safety alternatives to prevent accidents. But until now, the cause of the accident has stopped being superficial analysis, awareness on the root cause of the acciden did not reflect. In this study, we analyze the characteristics and causes in G contractors' safety accidents. And innovation strategy, organization-wide safety management system and detailed tasks to derive essentially was to prevent the occurrence of large construction companies. A lot of business for accident prevention effect was transient and formal, to reflect a management style and organizational culture, and try to prevent construction accidents. we will strive to prevent the disaster from the construction site through the improvement of these.