• Title/Summary/Keyword: Constructed wetland design

Search Result 53, Processing Time 0.033 seconds

Lifecycle cost assessment of best management practices for diffuse pollution control in Han River Basin (한강수계 비점오염원 저감시설의 생애주기비용 평가)

  • Lee, Soyoung;Maniquiz-Redillas, Marla C.;Lee, Jeong Yong;Mun, Hyunsaing;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.448-455
    • /
    • 2016
  • Diffuse pollution management in Korea initiated by the Ministry of Environment (MOE) resulted to the construction of pilot facilities termed Best Management Practices (BMPs). Twelve BMPs installed for the diffuse pollution management in the Kyung-An Stream were monitored since 2006. Data on the mass loading, removal efficiency, maintenance activities, etc. were gathered and utilized to conduct the evaluation of long-term performance of BMPs. The financial data such as actual construction, design and maintenance cost were also collected to evaluate the lifecycle cost (LCC) of BMPs. In this study, most of the maintenance activity was focused in the aesthetic maintenance that resulted to the annual maintenance cost of the four BMP types was closely similar ranging from 8,483 $/yr for retention pond to 8,888 $/yr infiltration system. The highest LCC were observed in constructed wetland ($418,324) while vegetated system had the lowest LCC ($210,418). LCC of BMPs was not so high as compared with the conventional treatment facility and sewage treatment plant. On the other hand, the relationship of removal efficiency on unit cost for TSS and TN was significant. This study will be used to design the cost effective BMP for diffuse pollution management and become models for LCC analysis.

Analysis on the Water Circulation and Water Quality Improvement Effect of Low Impact Development Techniques by Test-Bed Monitoring (시범 단지 운영을 통한 LID 기법별 물순환 및 수질개선 효과 분석)

  • Ko, Hyugbae;Choi, Hanna;Lee, Yunkyu;Lee, Chaeyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.5
    • /
    • pp.27-36
    • /
    • 2016
  • Low Impact Development (LID) techniques are eco-friendly storm water management process for water circulation restoration and non-point pollutant reduction. In this study, four LID techniques (Small constructed wetland, Infiltration trench box, Infiltration trench, Vegetated swale) were selected and installed as a real size at the real site. All facilities were evaluated as monitoring under the real environmental climate situation and an artificial rain with exceeding design rainfall. In various rainfall, runoff reduction efficiency and non-point pollutant removal efficiency are increased to the bigger Surface Area of LID (SA)/Catchment Area (CA) ratio and the bigger Storage Volume of LID (SV)/Catchment Area (CA) ratio. Runoff did not occur at all rainfall event (max. 17.2 mm) in infiltration trench and vegetated swale. But Small constructed wetland was more efficient at less than 10 mm, a efficiency of infiltration trench box was similar at different rainfall. Although different conditions (such as structural material of LID, rainfall flow rate, antecedent dry periods), LID techniques are good effects not only water circulation improvement but also water quality improvement.

Design for Carbon Neutral Arboretum in Gwangju Metropolitan City (광주광역시 탄소중립 수목원 설계)

  • Kim, Hoon Hee
    • KIEAE Journal
    • /
    • v.9 no.3
    • /
    • pp.61-68
    • /
    • 2009
  • Gwangju Metropolitan Government & Ministry of Environment have signed a model city in response to Climate Change agreement. The agreement calls for Gwangju to cut greenhouse gas emissions 10% below 2005 levels by 2015. Gwangju has seen this agreement as an opportunity to cut pollution and conserve the environment as well as to reinvigorate local economy. According to policy of Gwangju, Gwangju held design competition for Gwangju City Arboretum on march, 2009. The purpose of design competition was to give a wide publicity to Gwangju as Hub City of Asian Culture and construct carbon-neutral arboretum in accordance with the policy of 'Low-Carbon and Green Growth'. First of all, a design concept of arboretum is 'winding, round, overlay 'to reflect the landscape of Nam-do which is surrounded by mountains and river flows through the village. Second, the arboretum has five different places with these themes - Forest of Festivals, Health, Nature, Nostalgia, Education and Future. Each place has a symbolic theme park and different flow planning respectively. Third, the most critical point is that the arboretum is a carbon-neutral park. Gwangju arboretum will soon be developed in metropolitan sanitary landfill and constructed as the O2 arboretum based on low carbon strategy. Fourth, the O2 arboretum suggests specialized issue : 'Energy Saving', 'Recycling System', 'Green Network', 'Water System(rainwater maintenance and wetland development)'. Besides, main buildings(greenhouse, visitor center, Nam-do experience exhibition hall, and forest museum) is designed in consideration of harmony with topography character, surroundings. Also, planting will be a multilayer plant based on native landscape trees in consideration of function and the growth characteristics.

Treatment of Nutrients Using the Upflow Vegetated Filter (상향류식 수초여과지를 이용한 영양염류처리)

  • Lee, Jun-Ho;Bang, Ki-Woong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.12
    • /
    • pp.1287-1292
    • /
    • 2006
  • Constructed wetlands are well known as highly efficient system to treat wastewater from different sources. Among the constructed wetlands, upflow types of constructed wetlands have become a common selection of wastewater during the last decade. We conducted a pilot scale study at peen house on treating potential of nutrients by upflow vegetated filter(UVF) pilot wetland which was combined with hydrodynamic separator and used the cattail plant(Typha angustifolia), and operated with artificial nutrients influent. This study evaluate the performances of upflow vegetated fille, in removal of nutrients. The objectives of this study were two-fold: (i) to evaluate the nutrients removal performance of pilot-scale upflow vegetated filter, filled with a mixture of perlite and soil media and planted with cattails and (ii) to design of scale-up upflow vegetated filter using Froude number. Results indicated that, under the condition of the ranges of hydraulic surface load rate were $22.7{\pm}9.6\;m^3/m^2/day$, the average removal of $COD_{Mn}$, and TN, TP were 57.5%, 40.0% and 41.5%, respectively. Computational fluid dynamics, FLUENT 6.0 program was used to predict the distribution of velocity in UVF and hydrodynamic separator. Full scale UVF was designed using the Froude number scale-up method that was assumed geomertic similarity between model and prototype. Result shows that the UVF with 3 m diameter has capacity of design sewage flowrate 75 $m^3/day$.

Integrated Eco-Engineering Design for Sustainable Management of Fecal Sludge and Domestic Wastewater

  • Koottatep, Thammarat;Polprasert, Chongrak;Laugesen, Carsten H.
    • Journal of Wetlands Research
    • /
    • v.9 no.1
    • /
    • pp.69-78
    • /
    • 2007
  • Constructed wetlands and other aquatic systems have been successfully used for waste and wastewater treatment in either temperate or tropical regions. To treat waste or wastewater in a sustainable manner, the integrated eco-engineering designs are explained in this paper with 2 case studies: (i) a combination of vertical-flow constructed wetland (CW) with plant irrigation systemfor fecal sludge management and (ii) integrated CW units with landscaping at full-scale application for domestic wastewater treatment. The pilot-scale study of fecal sludge management employed 3 vertical-flow CW units, each with a dimension of $5{\times}5{\times}0.65m$ (width ${\times}$ length ${\times}$ media depth) and planted with cattails (Typha augustifolia). At the solid loading rate of 250 kg total solids (TS)/$m^2.yr$ and a 6-day percolate impoundment, the CW system could achieve chemical oxygen demand (COD), TS and total Kjeldahl nitrogen (TKN) removal efficiencies in the range of 80 - 96%. The accumulated sludge layers of about 80 - 90 cm was found at the CW bed surface after operating the CW units for 7 years, but no clogging problem has been observed. The CW percolate was applied to 16 irrigation Sunflower plant (Helianthus annuus) plots, each with a dimension of $4.5{\times}4.5m$ ($width{\times}length$). In the study, the CW percolate were fed to the treatment plots at the application rate of 7.5 mm/day but the percolate was mixed with tap water at different ratio of 20%, 80% and 100%. Based on a 1-year data of 3-crop plantation were experimented, the contents of Zn, Mn and Cu in soil of the experimental plots were found to increase with increasing in CW percolate ratios. The highest plant biomass yield and oil content of 1,000 kg/ha and 35%, respectively, were obtained from the plots fed with 20% or 50% of the CW percolate, whereas no accumulation of heavy metals in the plant tissues (i.e. leaves, stems and flowers) of the sunflower is found. In addition to the pilot-scale and field experiments, a case study of the integrated CW systems for wastewater treatment at Phi Phi Island (a Tsunami-hit area), Krabi province, Thailand is illustrated. The $5,200-m^2$ CW systems on Phi Phi Island are not only for treatment of $400m^3/day$ wastewater from hotels, households or other domestic activities, but also incorporating public consultation in the design processes, resulting in introducing the aesthetic landscaping as well as reusing of the treated effluent for irrigating green areas on the Island.

  • PDF

An Analysis of Suitable site of Constructed Wetland using High Resolution Satellite Image and GIS in Kyoung-An Stream (고해상도 위성영상과 GIS를 이용한 인공습지 적지 분석 -경안천을 대상으로-)

  • Koh, Chang-Hwan;Jin, Do;Ha, Sung-Ryong
    • Journal of Wetlands Research
    • /
    • v.10 no.2
    • /
    • pp.115-128
    • /
    • 2008
  • Various human activities such as the Urbanization and Industrialization are estimated the main factors to pollute the stream. Now days, numerous studies are carried out for managing non-point sources which have un-effect on water quality of streams by land-use and livestock. In case of Korea, a matter of concern that the management of Pal dang reservoir - the main water resources of the national capital region - has been occurring. Especially, large-scale constructed-wetlands are planned and constructed at the end of Kyoung-an stream. Additionally a lot of sewage treatment plants are newly installed and extended in this watershed. According to these efforts, water quality of Kyoung-an stream is predicted that would be improved. But the more detail and scientific analysis should be carried out for the water quality improvement, because, existing water quality improvement projects are not involved to analyze root of water quality deterioration and improvement plans. Therefore, this study aims to select suitable areas for constructed-wetlands and to calculate size of the constructed-wetlands for water quality improvement in Kyoung-an stream through the geographical pollutant distribution analysis and land-use pattern analysis by high resolution satellite image and suitable area analysis of constructed-wetlands by GIS(Geographic information system). The progress of this study is (1) to select maximum pollutant loaded area by geographical analysis based on water quality data, (2) to analyze land-use patterns using high resolution satellite image, (3) to select suitable areas of constructed-wetlands, (4) to calculate area and volume of chosen constructed-wetlands using GIS. Basically, sizes of constructed-wetlands are induced through the constructed-wetlands design index based on treatment ratio(provided by Korea Water Resources Corporation). As a result of this study, two areas are selected to construct constructed-wetlands. One of the area was $127,586m^2$ near by Yong-in sewage treatment plant, and the other area was $1,647m^2$ near by Ju-buk stream and Dae-dae stream.

  • PDF

Natural Treatment of Wastewater from Industrial Complex in Rural Area by Subsurface Flow Wetland System (인공습지에 의한 농공단지 폐수처리)

  • Yoon, Chun-Gyeong;Lim, Yoong-Ho;Kim, Hyung-Joong
    • Korean Journal of Environmental Agriculture
    • /
    • v.16 no.2
    • /
    • pp.170-174
    • /
    • 1997
  • Constructed wetland system was studied to treat wastewater from industrial complex in rural area. Pilot plant at the Baeksuk Nongkong Danzi in Chunahn-City was used for field study. For the DO, the effluent concentration was higher than the influent concentration and it implies that natural reaeration supplies enough oxygen to the system. For the SS, the effluent concentration was consistently lower than the water quality standard even though the influent concentration varied significantly, which showed that SS was removed by the system effectively which is consist of soil and plants. For the BOD and COD, the average removal rate of them were 56% and 43%, respectively, therefore, the effluent concentration could not meet water quality standards when influent concentration was high. The removal rate of BOD and COD can be improved by supplemental treatment in addition to this system if necessary. For the T-N and T-P, the influent concentration of them were lower than the water quality standards than no further treatment was needed. Overall, the result showed that constructed wetland system is a feasible alternative for the treatment of wastewater from industrial complex in rural area. For actual application of this system, further study on design factors including loading rate, removal mechanism, and temperature effects is required to meet water quality standard consistently. Compared to existing systems, this system is quite competitive because it requires low capital cost, almost no energy and maintenance, and therefore, very cost effective.

  • PDF

Status, Trend and Strategy on Municipal Wastewater Management in China

  • Wang, Baozhen;Wang, Lin;Liu, Shuo;Wang, Li;Wang, Zheng
    • Journal of Wetlands Research
    • /
    • v.9 no.1
    • /
    • pp.47-60
    • /
    • 2007
  • The rapid development of economy in China at the expense of consuming huge amount of energy and resources, water resource in particular, which has resulted in the production and discharge of increasing amount of wastewater to the water environment. In order to effectively control the increasing water pollution trend, the State Council has stipulated that all the cities with population over 500,000 should reach wastewater treatment rate of 60% by 2005, and all the cities should reach the rate of 60% by 2010, of which Capital Beijing and all the province capital cities and important tourism cities should reach 70% then. By the end of 2005, of the 661 cities in China, 393 have built and operated municipal wastewater treatments with a total number of 790 sets, total treatment capacity of $80.91{\times}106m^3/d$ and total treatment rate of > 48%. Other 73 cities have started the construction of municipal wastewater treatment plants, and other 168 cities have started to prepare, planning and design of wastewater treatment plants. Most of municipal wastewater treatment plants in big cities in China operate normally and perform well with good quality of effluent in terms of wastewater treatment train, but the sewage sludge treatment is usually poor with big problems. It has been found that the small scale WWTPs using activated sludge process in the towns are usually operated and maintained abnormally because of lack of fund, skilled operators and energy. It is therefore suggested that the small scale MWWTPs in small cities and towns adopt appropriate technologies, of which the most available ones are multi-stage ponds, constructed wetlands and the combination of them for further purification and reuse of treated wastewater.

  • PDF

Design Strategies for Ecological Restoration Using System Dynamics - Focused on 2015 Miryang-si Jayeon Madang Development Project - (시스템 다이내믹스를 활용한 생태복원 설계 전략 - 2015 밀양시 자연마당 조성사업을 사례로 -)

  • Ham, Eun-Kyung;Song, Ki-Hwan;Chon, Jinhyung;Cho, Dong-Gil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.86-97
    • /
    • 2015
  • "The Jayeon Madang Development Project("JMDP")" is a project being promoted by the Ministry of Environment to create a cultural space and a natural rest area within the city. Abuksan, located at Abuksan in Gyeongsangnam-do Miryang-si Naeil-dong, has suffered a substantial amount of environmental degradation over time, so the need for ecological restoration made it a natural choice for the location of the JMDP's site. The purpose of this study is to examine ecological restoration design strategies used in Abuksan as part of the JMDP using system dynamics. The national archery center, hole, and arable land sites are key restoration areas in Abuksan that have faced with ecological problems. In this study, we identified the status of each site, determined key strategies being implemented, and designed based on the strategies implemented up to this point for solving problems associated with each sites through the use of causal loop diagrams. The results of the causal loop diagram analysis are as follows. The national archery center site was designed around strategies including planting green manure crops and introducing hugelkultur to reduce soil acidification and green network degradation. The hole site was designed as a constructed wetland based on the emergence of hygropreference vegetation, hydrated by rainwater collected at the bottom of hole, ecological and cultural benefits of such an environment. The arable land site restoration design was built around planting native vegetation on one part of the arable land site after soil quality improved and around restoration of grassland and a dry wetland on the other part of the site to reduce soil acidification, erosion, and green network degradation. This study is a significant attempt to apply principles of system dynamics to ecological restoration by providing the design strategies using comprehension of some problems in the ecosystem feedback loops, which has not been used before in general design processes for ecological restoration.

Operating Status and Improvement Plans of Ten Wetlands Constructed in Dam Reservoirs in Korea (국내 10개 댐저수지 인공습지의 운영현황 및 개선방안)

  • Choi, Kwangsoon;Kim, Sea Won;Kim, Dong Sup;Lee, Yosang
    • Journal of Wetlands Research
    • /
    • v.16 no.3
    • /
    • pp.431-440
    • /
    • 2014
  • To propose the improvement and management plans to strengthen the pollutant removal efficiency of dam reservoir's constructed wetlands(CWs), the operation status and configuration of CWs (including water depth, operational flow, water flow distribution, residence time, and pollutant removal efficiency, aspect ratio, open water/vegetation ratio etc.) were analyzed in 10 major wetlands constructed in dam reservoirs. The pollutant concentrations in the inflows of the studied CWs were lower than those of American and European constructed wetlands. Especially, organic matter concentrations in all of inflows were below 3 mg/L(as BOD) due to advanced treatment of sewage disposal plant and an intake of low concentration water during dry and normal seasons. The average removal efficiency of total nitrogen(TN) and total phosphorus(TP) for 10 CWs ranged from 7.6~67.6%(mean 24.9%) and -4.9~74.5%(mean 23.7%), respectively, showing high in wetlands treating municipal wastewater. On the other hand, the removal efficiency of BOD was generally low or negative with ranging from -133.3 to 41.7%. From the analysis of the operation status and configuration of CWs, it is suggested that the low removal efficiency of dam reservoir's CWs were caused by both structural (inappropriate aspect ratio, excessive open water area) and operational (neglecting water-level management, lack of facilities and operation for first flush treatment, lake of monitoring during rainy events) problems. Therefore, to enable to play a role as a reduction facility of non-point source(NPS) pollutants, an appropriate design and operation manuals for dam reservoir's CW is urgently needed. In addition, the monitoring during rainy events, when NPS runoff occur, must be included in operation manual of CW, and then the data obtained from the monitoring is considered in estimation of the pollutant removal efficiency by dam reservoir's CW.