• Title/Summary/Keyword: Constructability review

Search Result 26, Processing Time 0.026 seconds

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction (초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용)

  • Lee, Junehyuck;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

DESIGN MANAGEMENT FOR CONSTRUCTABILITY REVIEW OF HIGH QUALITY EXPOSED CONCRETE

  • Doo Won Hwang;Young woong Song;Yoon ki Choi;Dong Woo Shin;Jae Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1154-1157
    • /
    • 2005
  • This report is to do design management for constructability review of high quality exposed concrete, which is used increasingly in recent. To secure systematic management at design phase, we reviewed each definition and work at each design phase, we define high quality exposed concrete, a part of architectural concrete, as "an exposed concrete which has well ordered joint & is in pursuit of smooth surface." We reviewed requirements and influential factor to obtain High quality finishing surface and compared construction process of high quality exposed concrete with that of other finishing method. Management method at each design phase for constructability review to meet additional works and requirements is presented.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses (공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구)

  • Lee, Hae-Chan;Kim, Jin-Man;Lee, Dong-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

Constructability Assessment Model for International Construction Projects Using Structural Equation (구조방정식을 활용한 해외건설 프로젝트 시공성 평가 모델)

  • Lee, Yong Wook;Lee, Sang-Ku;Jang, Woosik;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.941-951
    • /
    • 2015
  • In the recent years, Korean construction companies have been awarded 680 billion USD in the oversea projects which lead to a successful quantitative growth. However, due to the lack of capability in the core technology and project management compared to the leading companies, in addition to low-price bidding, massive deficit projects have caused problems to the companies. In order to overcome the limitations of the lack of capabilities, the term constructability has been researched recently by developed countries to apply in the practical use. The concept of constructability must be applied for Korean companies to compete in the EPC construction projects. The term constructability is defined as the factor that affect the overall construction process of a project which is defined by the ease of construction and to secure the project quality. Therefore, this study aims to develop a constructability assessment model using the structural equation to assess the factors that affect the constructability in the design and construction stage. The purpose of using the structural equation is to analyze the direct and indirect correlation between each factor that affects the international construction projects. Total of 8 latent variables and 34 measured variables are derived through literature review, corporate reports, experts' interview and surveys. The result of the model suggests the constructability factors that are to be managed the most efficiently to reduce cost, time and improve the quality as well as a countermeasure strategy to successfully execute the target international construction projects.

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

Investigating Structural Stability and Constructability of Buildings Relative to the Lap Splice Position of Reinforcing Bars

  • Widjaja, Daniel Darma;Rachmawati, Titi Sari Nurul;Kwon, Keehoon;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.315-326
    • /
    • 2023
  • The design principles and implementation of rebar lap splice in architectural structures are governed by building regulations. Nevertheless, the minimization of rebar-cutting waste (RCW) is often impeded by the mandatory requirements pertaining to the rebar lapping zone as prescribed in design codes. In real-world construction scenarios, compliance with these rules often falls short due to hurdles concerning productivity, quality, safety, time, and cost. This discrepancy between code stipulations and on-the-ground construction practices necessitates an academic exploration. The goal of this research was to delve into the effect of rebar lap splice placement on the robustness and constructability of building edifices. The study initially took on a review of the computation of rebar lapping length and the rules revolving around the lapping zone. Following this, a structural robustness and constructability examination was undertaken, focusing on adherence to the lap splice zone. The interpretations and deductions of the research led to the following insights: (1) the efficacy of rebar lap splice is not solely contingent on the moment, and (2) the implementation of rebar lap splice beyond the specified zone can match the structural integrity and robustness of those confined within the designated area. As a result, the constraints on the rebar lapping zone ought to be revisited and possibly relaxed. The conclusions drawn from this research are anticipated to reconcile the disconnect between building codes and practical construction conditions, furnishing invaluable academic substantiation to further the endeavor of achieving near-zero RCW.

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF