• Title/Summary/Keyword: Constraints graph

Search Result 123, Processing Time 0.033 seconds

Polygon Modeling with Constraint Management (구속조건 관리를 이용한 다각형 모델링)

  • 김기현;김재정
    • Korean Journal of Computational Design and Engineering
    • /
    • v.3 no.3
    • /
    • pp.145-153
    • /
    • 1998
  • An approach has been developed to generate parametric models with Boolean operations. The approach combines Boolean operations and graph manipulation on the constraints imposed on primitives. A Boolean operation is first performed on two primitives and new geometric elements such as vertices and edges are computed. Then to generate the constraint graph of the polygon the each constraints graph of two primitives are merged by adding the new geometric elements with its corresponding constraints. In the merging process, some of the geometric elements belonging to the primitives may be eliminated based on its contribution to the polygon. A computer implementation in a 2D space is described to illustrate the approach with examples.

  • PDF

Synthesis of Asynchronous Circuits from Deterministic Signal Transition Graph with Timing Constraints (시간 제한 조건을 가진 결정성 신호 전이 그래프로부터 비동기 회로의 합성)

  • Kim, Hee-Sook;Jung, Sung-Tae
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.27 no.2
    • /
    • pp.216-226
    • /
    • 2000
  • This paper presents a new method to synthesize timed asynchronous circuits directly from the specification without generating a state graph. The synthesis procedure begins with a deterministic signal transition graph specification with timing constraints. First, a timing analysis extracts the timed concurrency and timed causality relations between any two signal transitions. Then, a hazard-free implementation under the timing constraints is synthesized by constructing a precedence graph and finding paths in the graph. The major result of this work is that the method does not suffer from the state explosion problem, achieves significant reductions in synthesis time, and generates circuits that have nearly the same area as compared to previous methods.

  • PDF

A Global Graph-based Approach for Transaction and QoS-aware Service Composition

  • Liu, Hai;Zheng, Zibin;Zhang, Weimin;Ren, Kaijun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.5 no.7
    • /
    • pp.1252-1273
    • /
    • 2011
  • In Web Service Composition (WSC) area, services selection aims at selecting an appropriate candidate from a set of functionally-equivalent services to execute the function of each task in an abstract WSC according to their different QoS values. In despite of many related works, few of previous studies consider transactional constraints in QoS-aware WSC, which guarantee reliable execution of Composite Web Service (CWS) that is composed by a number of unpredictable web services. In this paper, we propose a novel global selection-optimal approach in WSC by considering both transactional constraints and end-to-end QoS constraints. With this approach, we firstly identify building rules and the reduction method to build layer-based Directed Acyclic Graph (DAG) model which can model transactional relationships among candidate services. As such, the problem of solving global optimal QoS utility with transactional constraints in WSC can be regarded as a problem of solving single-source shortest path in DAG. After that, we present Graph-building algorithms and an optimal selection algorithm to explain the specific execution procedures. Finally, comprehensive experiments are conducted based on a real-world web service QoS dataset. The experimental results show that our approach has better performance over other competing selection approaches on success ratio and efficiency.

Dynamically-Correct Automatic Transmission Modeling (동적 특성을 고려한 자동변속기의 모델링)

  • 김정호;조동일
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.5
    • /
    • pp.73-85
    • /
    • 1997
  • An automatic transmission is an important element of automotive power systems that allows a driving convenience. Compared to a manual transmission, however, it has a few problems in efficiency, shift feel, and maintenance. To improve these, it is imperative to understand the dynamics of automatic transmissions. This paper develops a dynamically-correct model of an automatic transmission, using the bond graph method. The bond graph method is ideally suited for modeling power systems, because the method is based on generalized power variables. The bond graph method is capable of providing correct dynamic constraints and kinematic constraints, as well as the governing differential equations of motion. The bond graph method is applied to 1-4 in-gear ranges, as well as various upshifts and downshifts of an automatic transmission, which allows an accurate simulation of an automatic transmission. Conventional automatic transmission models have no dynamic constraint, which do not allow correct simulation studies.

  • PDF

The Implementation of Graph-based SLAM Using General Graph Optimization (일반 그래프 최적화를 활용한 그래프 기반 SLAM 구현)

  • Ko, Nak-Yong;Chung, Jun-Hyuk;Jeong, Da-Bin
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.4
    • /
    • pp.637-644
    • /
    • 2019
  • This paper describes an implementation of a graph-based simultaneous localization and mapping(SLAM) method called the General Graph Optimization. The General Graph Optimization formulates the SLAM problem using nodes and edges. The nodes represent the location and attitude of a robot in time sequence, and the edge between the nodes depict the constraint between the nodes. The constraints are imposed by sensor measurements. The General Graph Optimization solves the problem by optimizing the performance index determined by the constraints. The implementation is verified using the measurement data sets which are open for test of various SLAM methods.

AN IMPROVED COMBINATORIAL OPTIMIZATION ALGORITHM FOR THE THREE-DIMENSIONAL LAYOUT PROBLEM WITH BEHAVIORAL CONSTRAINTS

  • Jun, Tie;Wang, Jinzhi;Feng, Enmin
    • Journal of applied mathematics & informatics
    • /
    • v.26 no.1_2
    • /
    • pp.283-290
    • /
    • 2008
  • This paper is motivated by the problem of fitting a group of cuboids into a simplified rotating vessel of the artificial satellite. Here we introduce a combinatorial optimization model which reduces the three-dimensional layout problem with behavioral constraints to a finite enumeration scheme. Moreover, a global combinatorial optimization algorithm is described in detail, which is an improved graph-theoretic heuristic.

  • PDF

A Genetic Algorithm for Directed Graph-based Supply Network Planning in Memory Module Industry

  • Wang, Li-Chih;Cheng, Chen-Yang;Huang, Li-Pin
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.3
    • /
    • pp.227-241
    • /
    • 2010
  • A memory module industry's supply chain usually consists of multiple manufacturing sites and multiple distribution centers. In order to fulfill the variety of demands from downstream customers, production planners need not only to decide the order allocation among multiple manufacturing sites but also to consider memory module industrial characteristics and supply chain constraints, such as multiple material substitution relationships, capacity, and transportation lead time, fluctuation of component purchasing prices and available supply quantities of critical materials (e.g., DRAM, chip), based on human experience. In this research, a directed graph-based supply network planning (DGSNP) model is developed for memory module industry. In addition to multi-site order allocation, the DGSNP model explicitly considers production planning for each manufacturing site, and purchasing planning from each supplier. First, the research formulates the supply network's structure and constraints in a directed-graph form. Then, a proposed genetic algorithm (GA) solves the matrix form which is transformed from the directed-graph model. Finally, the final matrix, with a calculated maximum profit, can be transformed back to a directed-graph based supply network plan as a reference for planners. The results of the illustrative experiments show that the DGSNP model, compared to current memory module industry practices, determines a convincing supply network planning solution, as measured by total profit.

A Shortest Path Planning Algorithm for Mobile Robots Using a Modified Visibility Graph Method

  • Lee, Duk-Young;Koh, Kyung-Chul;Cho, Hyung-Suck
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1939-1944
    • /
    • 2003
  • This paper presents a global path planning algorithm based on a visibility graph method, and applies additionally various constraints for constructing the reduced visibility graph. The modification algorithm for generating the rounded path is applied to the globally shortest path of the visibility graph using the robot size constraint in order to avoid the obstacle. In order to check the visibility in given 3D map data, 3D CAD data with VRML format is projected to the 2D plane of the mobile robot, and the projected map is converted into an image for easy map analysis. The image processing are applied to this grid map for extracting the obstacles and the free space. Generally, the tree size of visibility graph is proportional to the factorial of the number of the corner points. In order to reduce the tree size and search the shortest path efficiently, the various constraints are proposed. After short paths that crosses the corner points of obstacles lists up, the shortest path among these paths is selected and it is modified to the combination of the line path and the arc path for the mobile robot to avoid the obstacles and follow the rounded path in the environment. The proposed path planning algorithm is applied to the mobile robot LCAR-III.

  • PDF

Modeling and Scheduling of Cyclic Shops with Time Window Constraints

  • Seo, Jeong-Won;Lee, Tae-Eog
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.161-164
    • /
    • 2000
  • A cyclic shop is a production system that repeatedly produces identical sets of jobs, called minimal part sets, in the same loading and processing sequence. We consider a version of cyclic shop where the operations are processed and unloaded within time limits, so called a time window. We model the shop using an event graph model, a class of Petri nets. To represent the time window constraint, we introduce places with negative time delays. From the shop modeling graph, we develop a linear system model based on the max- plus algebra and characterize the conditions on the existence of a stable schedule.

  • PDF

A scheduling algorithm for conditonal resources sharing consideration (조건부 자원 공유를 고려한 스케쥴링 알고리즘)

  • 인지호;정정화
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.2
    • /
    • pp.196-204
    • /
    • 1996
  • This paper presents a new scheduling algorithm, which is the most improtant subtask in the high level synthesis. The proposed algorithm performs scheduling in consideration of resource sharing concept based on characteristics of conditionsla bransches in the intermediate data structure. CDFG (control data flow graph) generated by a VHDL analyzer. This algorithm constructs a conditon graph based on time frame of each operation using both the ASAP and the ALAP scheduling algorithm. The conditon priority is obtained from the condition graph constructed from each conditional brance. The determined condition priority implies the sequential order of transforming the CDFG with conditonal branches into the CDFG without conditional branches. To minimize resource cost, the CDFG with conditional branches are transformed into the CDFG without conditonal brancehs according to the condition priority. Considering the data dependency, the hardware constraints, and the data execution time constraints, each operation in the transformed CDFG is assigned ot control steps. Such assigning of unscheduled operations into contorl steps implies the performance of the scheduling in the consecutive movement of operations. The effectiveness of this algorithm is hsown by the experiment for the benchmark circuits.

  • PDF