• Title/Summary/Keyword: Consistency in Design and Construction

Search Result 74, Processing Time 0.027 seconds

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

Terrain-Alignment Linked Design (지형 선형 연결 설계)

  • Kim, Yong Seok
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.191-198
    • /
    • 2014
  • PURPOSES : Safety consciousness can be the first factor to hinder the acceptance of design alternative, which moderates the applied design criteria in order to adapt the road to the natural terrain condition. METHODS : The method which enables to check the safety of design alternative by using design consistency concept is suggested. The method is based on the linked or interactive analysis between terrain and road alignment. Real design example is considered as a guide how to apply the method and the analysis result is discussed with the future research. RESULTS : Suggested method can be used for designers as a tool to review their design outputs can be safe as much as the original design. So, designers have the more objective judgement on their designs and have the confidence on their designs. CONCLUSIONS : The method is expected to be used as a tool to see the safety consciousness in an objective view, so any possible conflicts between designers and design-related personnels caused by the terrain-oriented design can be solved.

AHP 기법을 이용한 교량상부구조의 VE 검토

  • Park, Jang-Ho;Sin, Yeong-Seok;An, Ye-Jun;Lee, Gwang-Gyun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.52
    • /
    • pp.58-66
    • /
    • 2011
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types (Steel box girder, Rational girder, PSC-I girder) using Value Engineering (VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost (LCC), Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process (AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

  • PDF

A Study on Improvement of Architectural Design Process on the Interface in Designing of Power Plant (발전플랜트 설계 인터페이스 중심의 건축설계절차 개선에 관한 연구)

  • Lee, Gang-Ok;Kim, Da-Hee
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.9-15
    • /
    • 2020
  • The cooperation with other work types and designing procedure in plant industry and engineering showed clear differences from general construction industries. Current problems are that design's consistency is reduced because of the false system of interface and it ultimately causes frequency changes of design and delayed submission of final book. To solve the problems, the improvements of designing procedure were studied by focusing on the field of architectural designing and the range was limited from power plant construction industry to engineering designing field. If combining GA with the field of architectural designing and receiving data previously, it's possible to conduct expectable designing on small changes in the future, so it's expected to improve greatly cooperation with interface among the work types of power plant engineering received previously from the aspect of consistency. For the application of designing tool, a checklist, interim check will be conducted if progressed by list's division in the designing procedure, not book's completing period. In the interface among the designing work types, direct confirmation and revision must be conducted. In case of 3D modeling, the reflection of input data must be conducted from the basic designing so as to solve interferences intensively.

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

The Implications of Amore-Pacific's New Office Landscaping Through the Ground Theory (근거이론을 통해 본 아모레퍼시픽 신사옥 조경의 함의)

  • Park, Seong-uk;Hong, Youn-Soon;Kim, Woo-Jin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.6
    • /
    • pp.84-95
    • /
    • 2022
  • The landscaping of Amore-Pacific's new building has received various awards since its construction. This study attempted to identify the mechanisms of planning, design, and construction of this project through the ground theory. The results of the study are summarized as follows. The client's place attachment of the sites, which was the company's parent, was the driving force for an international design competiton in which architecture and landscaping were integrated. After that, in the detailed design stage for the actual implementation of the contest-winning plan, competent local designers and contractors were selected, and a consultative body was operated to engage in various opinions and promote rational decision-making. As for consultative body's operation method, simulation, physical model production, and detailed drawings were created after sharing opinions, and landscape design supervision played a major role. Establishing consistency in design and construction through integrated planning and landscape design supervision is required to cultivate craftsmanship and foster landscape coordinators in today's industrialized practice. The accumulation of related follow-up studies and supplementation of the system is anticipated.