Water Transportation and Stratification Modification in the Andong-Imha Linked Reservoirs System (안동호-임하호 연결에 따른 물 이동과 수온성층 변화)

  • Park, Hyeung-Seok;Chung, Se-Woong
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.1
    • /
    • pp.31-43
    • /
    • 2014
  • Recently, Andong Reservoir and Imha Reservoir located in Nakdong River basin (Korea) are being connected by a tunnel (length 2km, diameter 5.5m) for a conjunctive use. The objectives of this study were to construct a two dimensional(2D) laterally-averaged model for two reservoirs, and examine the effects of connection on the water transportation and temperature stratification in the reservoirs. The 2D models for each reservoir were calibrated using field data obtained in 2006, and applied to the linked system for the year of 2002 when a severe flood intruded into Imha Reservoir during the typhoon Rusa. Simulation results showed that 364 million $m^3$ of water can be conveyed from Imha to Andong, while 291 million $m^3$ of water from Andong to Imha after connection. It resulted in 1.38 m increase of annual averaged water level in Andong Reservoir, whereas 3.75 m decrease in Imha Reservoir. The structures of thermal stratification in both reservoirs were influenced in line with the flow exchanges. In Andong Reservoir, the location of thermocline moved upward about 10 m compared to an independent operation. The results imply that the persistent turbidity issue of Imha Reservoir might be shifted to Andong Reservoir during a severe flood event after connection.

A research on the design parameters for a double-transmission main system for sustainable water supply (이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구)

  • Hyun, Inhwan;Hong, Juneui;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

Design and Implementation of Physical Computing Education Content based on Augmented Reality

  • Kim, So-Young;Jung, Eunmi;Kim, Heesun
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.14 no.4
    • /
    • pp.198-205
    • /
    • 2022
  • Along with a variety of coding education, physical computing education for controlling various sensors is being actively conducted for elementary, middle, and high school students in line with the era of the fourth industrial revolution. A problem with physical computing education using Arduino is pin connection errors between Arduino and various sensors. Most of the students who come into contact with the Arduino for the first time often do not know the purpose of the Arduino pin and the connection position of the pin. Also, hardware built with incorrect pin connections to the Arduino board often does not work properly. If this case continues, students will lose interest in coding education. Therefore, in this paper, we implemented an augmented reality application that informs the connection process of the Arduino board and the sensor during physical computing coding education using Arduino, and designed and implemented educational content for the Arduino pin position and connection process. First, we explain the role of the Arduino board and the sensor and the location of the pins. After that, the students run the educational augmented reality educational content using their smartphones and check the correct pin connection process between the Arduino and the sensor. In the physical computing education, augmented reality content is used to increase the understanding and immersion of the class. It is expected that the educational effect will also increase by inducing fun and interest in physical computing coding education.

A Study on the Effect of the Right to Disconnect on the Job Satisfaction (IT초연결 환경에서 연결되지 않을 권리 인식이 직무만족에 미치는 영향에 관한 연구)

  • Park, Jungryeol;Kwon, Sundong
    • Journal of Information Technology Applications and Management
    • /
    • v.27 no.3
    • /
    • pp.55-68
    • /
    • 2020
  • Recently, organizational workers are complaining of stress due to excessive connection on SNS and are claiming the right to disconnect. If these claims are not properly managed, organizational performance may deteriorate. Therefore, organizations need to approach the issue of the right to disconnect carefully. This study examined the effects of work connection at office, IT hyper-connected environments, and work connection at home on the right to disconnect, and analyzed the effect of this perception on job satisfaction, and then analyzed gender differences in these effects. The research results are as follows. First, it was found that the work connection at office lowered the right to disconnect. Second, the deeper IT hyper-connected environment, the higher the right to disconnect. Third, it was found that the work connection at home raises the right to disconnect. Fourth, it was found that the right to disconnect increases job satisfaction to a certain extent, but lowers job satisfaction when it exceeds the appropriate line. Fifth, in the case of men, the effect of the right to disconnect on job satisfaction has sharply increased and sharply reduced. On the other hand, in women, it gradually increased and then decreased slowly. Considering the results of these studies, organizations need to check the current status and appropriate level of the work connection at home for organizational performance management. Organizations need to formulate organizational management measures that take into account the positive and negative functions of the right to disconnect. And organizations need to come up with management measures that take gender into account.

Text Line Segmentation using AHTC and Watershed Algorithm for Handwritten Document Images

  • Oh, KangHan;Kim, SooHyung;Na, InSeop;Kim, GwangBok
    • International Journal of Contents
    • /
    • v.10 no.3
    • /
    • pp.35-40
    • /
    • 2014
  • Text line segmentation is a critical task in handwritten document recognition. In this paper, we propose a novel text-line-segmentation method using baseline estimation and watershed. The baseline-detection algorithm estimates the baseline using Adaptive Head-Tail Connection (AHTC) on the document. Then, the watershed method segments the line region using the baseline-detection result. Finally, the text lines are separated by watershed result and a post-processing algorithm defines the lines more correctly. The scheme successfully segments text lines with 97% accuracy from the handwritten document images in the ICDAR database.

An Auto-drawing Algorithm for the Single Line Diagram of Distribution Systems (배전선로 회선별단선도 자동생성 알고리즘)

  • Son, Ju-Hwan;Lim, Seong-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.5
    • /
    • pp.854-859
    • /
    • 2010
  • Distribution Automation System(DAS) is designed to improve operational efficiency by acquisition and control of remote data using its components such as central computation units, communication network and feeder remote terminal units. A conventional human machine interface of the DAS adopts a schematic diagram which is made by drawing power equipments on the geographic information system map. The single line diagram is more useful than the schematic diagram for the main tasks of distribution system operation such as protective relay coordination, service restoration and loss minimization. Since the configuration of the distribution line is changed according to the relocation of the open tie switches, the auto-drawing algorithm based on the connection between the sections and the switches is an essential technique. This paper proposes a new auto-drawing algorithm for a single line diagram of distribution systems based on tertiary tree and collision avoidance method. The feasibility of the proposed algorithm has been testified for various cases using practical distribution system with 12 feeders.

Experimental study on the seismic behavior in the connection between CFRT column and steel beam

  • Lu, Xilin;Yu, Yong;Kiyoshi, Tanaka;Satoshi, Sasaki
    • Structural Engineering and Mechanics
    • /
    • v.9 no.4
    • /
    • pp.365-374
    • /
    • 2000
  • The structural behavior of connections between concrete-filled rectangular tubular column (CFRT column) and steel beam has been studied in this paper through sub-assemblage loading tests. It is found that the sub-assemblages exhibit ductile restoring force characteristics under seismic loading. A formula for the prediction of the yield strength of each member in the connection is proposed by using the yield line theory under the assumption of a simple stress transfer mechanism. It is shown that the proposed formula can produce a reasonable prediction while providing a basis for further investigation.

A Study on the Fault Current of Distribution System according to Connection of Wind Turbine Generation Grid-Connected Transformer (풍력발전 계통연계 변압기의 결선에 따른 배전계통의 고장전류에 관한 연구)

  • An, Hae-Joon;Ro, Kyoung-Soo;Kim, Hyun-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.369-371
    • /
    • 2007
  • This study suggests a modeling of grid-connected wind turbine generation system that has induction generator, and aims to perform simulations for outputs by the variation of actual wind speed and for fault current of wind generation system by the transformer winding connection. This study is implemented by matlab&simulink. The simulation shall be performed by assuming single line to ground fault generated in the system. Generator power, generator rotor speed, generator terminal current and fault current shall be observed following the performance of simulation. The fault current change will be dealt through the simulation results for fault current of wind generation system following the grid-connected transformer winding connection and the simulation result by the transformer neutral ground method.

  • PDF

The Relationship between Wind Power Generation Grid-connected Transformer Winding Connection and Fault Current in MATLAB & SIMULINK (MATLAB & SIMULINK에서 풍력발전 계통연계 변압기결선과 고장전류와의 관계)

  • An, Hae-Joon;Kim, Hyun-Goo;Jang, Gil-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.307-309
    • /
    • 2008
  • This study suggests a modeling of grid-connected wind turbine generation system that has induction generator, and aims to perform simulations for outputs by the variation of actual wind speed and for fault current of wind generation system by the transformer winding connection. This study is implemented by matlab&simulink. The simulation shall be performed by assuming single line to ground fault generated in the system. Generator power, generator rotor speed, generator terminal current and fault current shall be observed following the performance of simulation. The fault current change will be dealt through the simulation results for fault current of wind generation system following the grid-connected transformer winding connection and the simulation result by the transformer neutral ground method.

  • PDF

Evaluation on Effect of Wind Power Generation System According to Transformer Winding Connection at Matlab&Simulink (MATLAB&SIMULINK에서 변압기 결선에 따른 풍력발전 시스템의 영향 평가)

  • An, Hae-Joon;Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.772-773
    • /
    • 2007
  • This study suggests a modeling of grid-connected wind power generation system that has induction generator, and aims to perform simulations for outputs by the variation of actual wind speed and for fault current of wind generation system by the transformer winding connection. This study is implemented by matlab&simulink. The simulation shall be performed by assuming single line to ground fault generated in the system. Generator power, rotor speed, terminal voltage, system voltage, and fault current shall be observed following the performance of simulation. The fault current change will be dealt through the simulation results for fault current of wind generation system following the grid-connected transformer winding connection and the simulation result by the transformer neutral ground method.

  • PDF