• Title/Summary/Keyword: Connecting Rod Bolt

Search Result 8, Processing Time 0.072 seconds

A case study on the bolt failure of the moving parts of a marine diesel engine (선박용 디젤기관의 운동부 볼트 손상사례에 대한 연구)

  • Kim, Jong-Ho;Lee, Jae-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.118-124
    • /
    • 2017
  • To investigate and analyze the cause of the failure of the connecting rod bolt and the crank pin bearing bolt of the diesel engine of this study, the following results were obtained through site surveying, the investigation of literature referring to similar failures, testing and inspection of the fracture surface, and the experience of the researchers. The fractured crank pin bearing bolt of the diesel engine is estimated to be damaged later than the connecting rod bolt. From the shape of fracture surface, it is evident that the failed connecting rod bolt is fractured by fatigue failure due to abnormally repeated loads (e.g. loosening of the connecting bolt, etc.), and is not failed by brittle fractures due to the impact load. The surface of the U-nut on the fractured connecting rod bolt has been worsening due to the improper use of lubricant (agent for prevention of thread fixing) and no usage of separating the each connecting rod on each cylinder. Moreover, there is the possibility that those poor surface conditions of the fractured connecting rod bolt have affected the failure of the connecting rod bolt of the main engine. And it could be assumed that the mechanical characteristic and manufacturing process of the failed connecting rod bolt and crank pin bearing bolt, which were made by a domestic company, conform to the design requirements for those bolts.

Finite Element-Based Fatigue Assessment of Engine Connecting-Rod Bolts (엔진 커넥팅 로드 볼트의 유한요소 피로 평가)

  • Cho, Sung-San;Chang, Hoon;Lee, Kyung-Woo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.16 no.4
    • /
    • pp.14-20
    • /
    • 2008
  • Fatigue fracture of engine connecting-rod bolts is encountered frequently during the developement of high-speed engines. Only the engine dyno test is a currently reliable fatigue durability assessment method. It is because the available rig tests cannot mimic the engine running condition completely, and because the finite element analysis cannot provide realistic stresses near the bolt thread that is modeled as a cylinder. This paper introduces a methodology to assess the fatigue durability of the connecting-rod bolts using the finite element analysis. The methods to contruct the bolt model, to extract the critical bolt stresses for the fatigue analysis, and to obtain the bolt fatigue endurance limit experimentally are discussed. Reliability of the method is verified indirectly.

PROCEDURE FOR COMPUTER-AIDED PRELOAD SELECTION OF ENGINE CONNECTING-ROD BOLTS

  • Cho, S.S.;Chang, H.;Lee, K.W.
    • International Journal of Automotive Technology
    • /
    • v.8 no.3
    • /
    • pp.319-325
    • /
    • 2007
  • Preload of critical engine bolts affects the performance and durability of engines. In modern engines that pursue higher power outputs and which are of lighter weight, it becomes more difficult to select an optimal target preload in consideration of various factors such as the role and structural characteristics of joint members, joint load, and fatigue durability of bolts and joint members. A procedure to select the bolt preload using computer-aided engineering technology, especially the finite element method, has been developed. The procedure is illustrated with connecting-rod bolts for which an appropriate preload is known. The selection criteria of target preload and the finite element modeling technique for connecting-rod bolts are also explained.

Failure Analysis by Fracture Study of Connecting Rod Bolts in Diesel Engine for Military Tracked Vehicles (군용 궤도차량 디젤엔진의 커넥팅 로드 볼트 파손 검토를 통한 고장원인분석)

  • Oh, Dae San;Kim, Ji Hoon;Seo, Suk Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.191-200
    • /
    • 2020
  • Tracked military vehicles are operated under harsher conditions and climates than ordinary vehicles, and the components require high degrees of reliability and durability. A diesel engine is the main power generator, and when the vehicle breaks down, there is a high possibility of causing a large-scale accident. Therefore, analyzing the cause of engine failure can be important for preventing similar cases that may occur. In this study, we clarified the mechanism of engine failure according to an overhaul test, hardness measurement, and an analysis of the fracture surface. The overhaul test confirmed that a bolt was separated from the connecting rod (number 4). In addition, the hardness measurement results of the connecting rod bolt conformed to the standard, and it was found that the bolt fracture was ductile fracture through an analysis of the fracture surface. Based on the results, it was concluded that damage to a diesel engine of a tracked military vehicle was caused by separating and damage caused by loosening of the connecting rod bolts, resulting in cascading damage. The results of the study could be used as reference examples and could be useful for another study on engine failure analysis.

Robust Design of Connecting Rod (커넥팅로드 강건 설계 방안)

  • Han, Moonsik;Yang, Chulho
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.1
    • /
    • pp.142-147
    • /
    • 2014
  • Finite element analysis along with DOE scheme has been performed to obtain robust design of connecting rod assembly. An analysis was conducted with five loading steps. Fatigue analysis was done using commercial software FEMFAT and fatigue safety factors at the interested regions such as shank area of small end and big end were calculated. 27 design cases using 3 factors with 3 levels are constructed by design of experiment. Each case is simulated to find the most influential factors. Response for this study, maximum Von-Mises stress, has been used to determine main factors of connecting rod assembly. Among the 3 factors, compression load affected the response greatly. However, bolt assembly load and width of shank flat area showed a little influence to the response. Interaction effects among factors considered did not occur. Connecting rod assembly considered in this study showed its sensitivity to the noise factor such as compression load rather than design factor such as width of flat shank area.

Research on no coal pillar protection technology in a double lane with pre-set isolation wall

  • Liu, Hui;Li, Xuelong;Gao Xin;Long, Kun;Chen, Peng
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.537-550
    • /
    • 2021
  • There are various technical problems need to be solved in the construction process of pre-setting an isolation wall into a double lane in the outburst prone mine. This study presents a methodology that pre-setting an isolation wall into a double lane without a coal pillar. This requires the excavation of two small section roadways to dig a wide section roadway, followed by construction of the separation wall. During this process the connecting lane is reserved. In order to ensure the stability of the separation wall, the required bearing capacity of the isolation wall is 4.66 MN/m and the deformation of the isolation wall is approximately 25 cm. To reduce the difficulty of implementing support the roadway is driven by 5 m/d. After the construction of the separation wall, the left side coal wall is brushed 1.5 m to make the width of the gas roadway reach 2.5 m and the roadway support utilizes anchor rod, ladder beam, anchor cable beam and net configuration. During construction, the concrete pump and removable self-propelled hydraulic wall mold are used to pump and pour the concrete of the isolation wall. In the process of mining, the stress distribution of coal body and isolation wall is detected and measured on site. The results demonstrate that the deformation of the surrounding rock of roadway and separation of roof in the roadway is small. The stress of the bolt and anchor cable is within equipment tolerance validating their selection. The roadway is well supported and the intended goal is achieved. The methodology can be used for reference for similar mine gas control.