• 제목/요약/키워드: Concrete track

검색결과 390건 처리시간 0.033초

탄성파시험에 의한 프리캐스트 슬래브궤도의 강성구조와 충전성능 평가 (Evaluation of Stiffness Structure and Grouting Efficiency beneath the Precast Slab Track by Elastic Wave Tests)

  • 이일화;조성호;장승엽;강윤석;한성우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1303-1308
    • /
    • 2007
  • Recently, precast concrete tracks are replacing ballast track for efficient and economic maintenance of track. Precast concrete railroad tracks are manufactured in factory, and transported to railroad construction site for installation. Therefore, quality of precast concrete track itself should be sufficiently good. On the contrary to the convenient manufacturing of precast concrete track, the installation of a precast concrete track requires careful steps. Typically, a precast concrete track is placed on an approximately 15-cm thick lean concrete layer. A mortar is filled between lean concrete layer and precast concrete track to adjust the sloping angle of a precast concrete track for a safe train operation at a curvy section. Then, the use of filled mortarproduces a void underneath a precast concrete track, which is harmful to structural safety of a precast concrete track undercyclic loading. Therefore, it is essential to make sure that there is no void left beneath a precast concrete track after mortar filling. In the continuous resonance method, the amplitude of frequency response measured using an instrumented hammer and an accelerometer is plotted against a pseudo-depth, which is half of the wave velocity divided by frequency. The frequency response functions are measured at consecutive measurement locations, 6-cm interval between measurement points, and then combined together to generate a 2-D plot of frequency response. The sections with strong reflections or large amplitude of frequency response are suspicious areas with internal voids and unfilled areas. The 2-D frequency response plot was efficient in locating problematic sections just by examining the color shade of a visualized plot in 2-D format. Some of the problematic sections were drilled to make a visual inspection of mortar filling. The visual image of interface between mortar and precast concrete track was verified using the validity of the continuous resonance technique adopted in this research.

  • PDF

서울메트로 $1\sim4$호선 고가역(창동역) 고체소음 저감 사례 (The Reduction of Structure-borne Noise in an Elevated Station(Changdong Station) of Seoul Metro Line No. $1\sim4$)

  • 공선용;오희완;김상진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.438-443
    • /
    • 2007
  • In the recent railway construction, the concrete slab track is highlighted as the maintenance-free track and the main stream is moving from ballasted track to concrete slab track. However, in spite of many merits of concrete slab track, the higher noise generated from the concrete slab track is a troublesome question to solve and, by this reason, many studies on noise reduction of concrete slab track are carried out. The railway noise can be classified into the reflection noise emitted from wheel/rail contact and the structure-borne noise transmitted through railway structures. In this presentation, we would like to introduce an example of the successful reduction of structure-borne noise at track retrofitting to maintenance-free concrete slab track in elevated Changdong Station which was built with ballasted track on Rahmen structure.

  • PDF

고속철도 궤도 타입에 따른 진동 특성 (Vibration Characteristics of High-speed Railway Lines on the Type of Track)

  • 이찬우;함염삼;김재철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.332-336
    • /
    • 2011
  • IN THIS STUDY, BASED ON THE TYPE OF HIGH SPEED RAILWAY TRACK VIBRATION CHARACTERISTICS WERE MEASURED AT KTX VEHICLE. KTX ROUTE BALLASTED TRACK HAS BEEN INSTALLED TOGETHER WITH THE CONCRETE TRACK. CONCRETE MUST BE TRACK IRREGULARITY THAN BALLASTED TRACK, VEHICLES VIBRATION VALUES THAT ARE SMALLER. ALSO, IN TERMS OF MAINTENANCE, CONCRETE TRACK IS KNOWN TO BE MORE FAVORABLE THAN THE BALLASTED TRACK. PHASE 2 IS THE KTX, DAEGU - BUSAN IS A SECTION OF CONCRETE TRACK. IN THIS STUDY, "KUUNG-BU HIGH-SPEED RAILWAY LINES" INSTALLED ON THE CONCRETE TRACK AND BALLASTED TRACK KTX FROM THE VEHICLE WHEN INSTALLED BETWEEN RAILS, SLEEPER AND BALLAST ON THE TRACK WAS MEASURED VIBRATIONS.

  • PDF

Parametric Study on Geogrid-Reinforced Track Substructure

  • Oh, Jeongho
    • International Journal of Railway
    • /
    • 제6권2호
    • /
    • pp.59-63
    • /
    • 2013
  • The purpose of this paper was to evaluate the effectiveness of geogrid for conventional ballasted track and asphalt concrete underlayment track using PLAXIS finite element program. Geogrid element was modeled at various locations that include subballast/subgrade, subballast/ballast interfaces, middle of the ballast, and one-third depth of the ballast. The results revealed that the effectiveness of geogrid reinforcement appeared to be larger for ballasted track structure compared to asphalt concrete underlayment track. Particularly, in case of installing geogrid at one-third depth of ballast layer in a conventional ballasted track, the most effectiveness of geogrid reinforcement was achieved. The influence of geogrid axial stiffness on track substructure response was not clear to conclude. Further validations using a discrete element method along with experimental investigation are considered as a future study. The effect of asphalt concrete layer modulus was evaluated. The results exhibited that higher layer modulus seems to be effective in controlling displacement and strain of track substructure. However it also yields slightly higher stresses within track substructure. It infers that further validations are required to come up with optimum asphalt concrete mixture design to meet economical and functional criteria.

콘크리트궤도 적용 경부고속철도의 시공 중 토압 경향 분석 연구 (An analysis study on earth pressure trends during construction of Gyungbu High Speed Railway using Concrete Track)

  • 김기환;김대상;나성훈;신기대
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.671-679
    • /
    • 2010
  • The construction of concrete track for the first time in Korea gives lots of meanings to civil engineering in various aspects. Settlement level needs to be kept minimal for the safety of the track. Concrete track has different structural characteristics comparing to conventional ballast track, so load distribution in concrete track is also different. Since it is the first time to build concrete track, there are very few experience and data available on the subject. Therefore it is important to evaluate how much load is transferred to the ground due to the running vehicle in concrete track and to determine the optimal thickness of layers. In this research, 9 individual earth pressure cells were installed at OOOk930 site in 2nd stage of Kyungbu high speed railway during under construction. The in-situ pressure data were measured at each layers during pump-car and locomotive were moving on the high speed railway surface.

  • PDF

현장모형실험을 통한 자갈궤도와 콘크리트궤도의 동결심도 및 동상량 측정 (Field Model Tests on Frost Penetration Depths and Frost Heave Amounts in Ballast track and Concrete track)

  • 김영진
    • 한국철도학회논문집
    • /
    • 제19권4호
    • /
    • pp.506-514
    • /
    • 2016
  • 철도 현장에 실험용 자갈궤도와 콘크리트궤도를 설치한 후 겨울철에 동결심도와 동상량을 측정하였다. 그 결과 같은 동결지수일 때 자갈궤도보다 콘크리트궤도의 동결심도가 깊게 나타나는 경향을 보였다. 또한 자갈궤도는 하부에 XPS, PE골재층을 포설할 경우 동결심도가 크게 감소하였고, 콘크리트궤도에서는 입도조정층의 두께를 늘릴 경우 동결심도가 감소하는 경향을 보였다. 동상량 역시 자갈궤도에서는 하부에 XPS, PE골재층을 설치할 경우 감소하였고, 콘크리트궤도에서는 입도조정층의 두께를 증가시킬 경우 감소하는 경향을 보였다.

고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설 (Construction and Development of Turnout on concrete roadbed applicable to high speed railway)

  • 박춘복;권호진;전세곤;윤병현;오수진;최용석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

자갈궤도와 콘크리트궤도에서의 하중재하에 따른 노반거동 비교 (A Comparison of Behavior of the Roadbeds of Ballasted & Concrete Track with the Cyclic Loading)

  • 최찬용;이성혁;엄기영
    • 한국지반신소재학회논문집
    • /
    • 제9권3호
    • /
    • pp.1-8
    • /
    • 2010
  • 국내에 적용하고 있는 궤도시스템은 크게 자갈궤도와 콘크리트궤도로 구분할 수 있다. 본 논문에서는 콘크리트궤도와 자갈궤도의 노반 거동현상을 실험적으로 비교하였다. 실 대형 실험결과 하중 분산은 자갈궤도의 경우 연성포장구조, 콘크리트궤도는 강성포장구조의 형태로 하중이 분산되었으며 하중배분율은 약 30%:20%:15%로 자갈궤도보다 폭 넓게 분산되었다. 열차하중에 대한 노반에서 발생된 토압은 약 30kPa 이내로 기존 실차주행시험결과와 유사한 결과이며 자갈궤도에 비해 약 4배 정도 작게 발생하였다. 또한 반복하중에 대한 콘크리트궤도의 지중입자속도는 약 0.3cm/sec 이내로 자갈궤도보다 8배 정도 작게 측정되었다.

  • PDF

열차속도 증가를 고려한 토공상 콘크리트궤도의 거동 분석 (Analysis of the Behavior of Concrete Track on Earthwork Considering the Increase in Train Speed)

  • 김정일;안석준;권종욱;김진일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3214-3219
    • /
    • 2011
  • HONAM High Speed Railway project is under construction with the target to have 350km/h design speed from Songjeong Gwangju City to Osong. The track for the whole section of the line is scheduled to be a concrete track in order to decrease total life cycle cost (LCC) according to the decrease of track destruction. However, the study on the related parts to increase the train speed up to 400km/h is on going in order to strength the competitiveness of high speed railway. On this study, the stress of track has been analyzed according to the concrete track design method of Eisenmann using equivalent depth theory proposed by Odemark for behavior analysis of concrete track on track bed, which is having embankment deformation characteristics by train load. The behavior analysis of track is performed to analyze the stress of track bed layer and track according to the variation of design load and train speed. And also, the characteristics of concrete track have been figured out by analyzing the parameter according to the thickness of track bed layer.

  • PDF

경부고속철도 콘크리트궤도 토공 및 원지반 침하 (I) (Settlement of Embankment and Foundation for Concrete Track of Gyungbu High Speed Railroad)

  • 양신추;문재석;이현정;강대웅;김대상
    • 한국철도학회논문집
    • /
    • 제9권6호
    • /
    • pp.644-651
    • /
    • 2006
  • An application of concrete track is being actively processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance ire, but is very difficult system to maintain after earthwork settlement occurred. Therefore, the management and control of embankment and foundation settlement is very important for the successful concrete track construction. We expect that the main part of the settlement of the concrete track is the one of embankment and foundation supporting it. Settlements vulnerable to the concrete track among the causes of lots of settlements are primary consolidation and secondary compression settlement of foundation, creep settlement of embankment, settlement caused by train load, and unequal settlement resulting from the difference of embankment material and construction process. This paper investigated the settlement causes to make badly effects on the concrete track and also evaluated the settlement with field tests and numerical analysis.