• Title/Summary/Keyword: Concrete slab

Search Result 1,727, Processing Time 0.029 seconds

Structural Analysis of Multipurpose Fishway in Chuksan River (척산천의 다기능 어도의 구조 해석)

  • Lee, Young Jae;Lee, Jung Shin;Kim, Mun Gi;Park, Sung Sik;Jang, Hyeong Kyu
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.1
    • /
    • pp.97-107
    • /
    • 2017
  • In this study, the validity and applicability of the multipurpose fishway which has been constructed for the upstream migration of fish at Chuksan river in Uljin is assessed and analyzed by a commercial software. The upper slab types of fishway in this investigation are reinforced concrete slab (S1 type) and reinforced concrete slab with steel plate (S2 type). The three different sizes of subway passage ($0.8m{\times}0.1m$, $0.8m{\times}0.2m$, $0.8 m{\times}0.3m$) and velocities (0.6 m/s, 1.2 m/s, 1.8 m/s) of Chuksan fishway was investigated and compared for the Chuksan in government design code. The analysis showed that the maximum stress and bending moment of S1 type decreased 1~21 % and 12~27 % compared to the Chuksan in government design code, respectively. Also, the maximum stress of and bending moment of S2 type decreased 11~32 % and 27~39 %. From the numerical analysis, it was found that the S2 type was greatly effective and the subway passage size of $0.8m{\times}0.2m$ was most safe. This result can be utilized to be the basic data for design of the Multipurpose fishway.

Deformation and Stress Distribution of Discontinuous Precast Concrete Track Slab : II. Stress Distribution (불연속 프리캐스트 콘크리트궤도 슬래브의 변형과 응력 분포 : II. 응력 분포)

  • Lee, Dong Hoon;Kim, Ki Hyun;Jang, Seung Yup;Zi, Goangseup
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.637-648
    • /
    • 2017
  • In this paper, the effects of initial built-in deformation and temperature deformation on the stress distribution of discontinuous precast concrete track slab under train load were examined. According to the results, when train load is put on a precast concrete slab with initial built-in deformation and deformation due to temperature gradient, the maximum tensile stresses develop at the upper side of slab in the slab center, edge center and corner of shear pocket; the stress distribution is different from that of the case under train load only. Therefore, to accurately predict the actual weak points and failure modes, one should calculate the stress under train load considering the initial built-in and temperature deformation of the slab.

Experimental Study on the Development of Void Precast Concrete Slab using Rubber Tube Mold for Inner Core (고무튜브 몰드 프리캐스트 콘크리트 유공 슬래브 개발에 관한 실험적 연구)

  • Bae, Kyu-Woong;Hong, Sung-Yub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.293-303
    • /
    • 2021
  • The void PC slab has a structurally reasonable cross-section by forming the hollow section of the neutral axis that is unnecessary for bending behavior. Domestic PC factories have introduced automation equipment to produce hollow PC slabs, and are achieving hollow sections through inserts. However, since the excessive initial investment cost of the PC factory is the main factor in the increase in production cost, other alternatives are needed. Therefore, in this study, when producing hollow PC slab members, by using a rubber tube as a formwork to form an internal hollow space, it is intended to contribute to securing productivity through molding various hollow shapes, making it larger, lightweight, and enabling rapid production. To implement a hollow PC slab using a rubber tube mold, the shape of a hollow cross-section in which the tube is combined was implemented by considering the shape of the rubber tube first. In addition, to secure the concrete quality of the hollow part, the finish properties of the rubber tube mold and concrete were evaluated, and the hollow PC production process was established.

Strength of Interior Post-Tensioned Flat Plate Slab-Column Connection based on Failure Mechanism (파괴 메커니즘을 고려한 내부 포스트텐션 플랫 플레이트 슬래브-기둥 접합부의 강도식 평가)

  • Kim, Min-Nam;Ha, Sang-Su;Lee, Li-Hyung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.126-129
    • /
    • 2006
  • A bending moment $M_u$ transferred at slab-column connection is resisted at the slab critical section by flexure and shear. The ACI 318-05 Building Code(1) gives an empirical equation for the fraction ${\gamma}_{\upsilon}$ of the moment $M_u$ to be transferred by shear at the slab critical section at d/2 from the column face and also the effective wide(c+3h). The equation is based on tests of interior slab-column connections without shear reinforcement. In order to investigate the data eight test specimens were examined. The test shows that increased slab load substantially reduces both the unbalanced moment capacity and the lateral drift capacity of the connection. Especially, the specimens with the bottom reinforcement existence and nonexistence, appears remarkable differences. Studies also show that the code equation for ${\gamma}_{\upsilon}$ does not apply to all cases. The purpose of this study is to compare the test results with present ACI 318-05 Building Code provisions for design of slab-column connections and with the analysis of the experimental data for a new limitation of strength equation without shear reinforcement and bottom reinforcement.

  • PDF

Analysis of PSC Box Girder Railway Bridge and Design of its Diaphragm using Sturt-and-Tie Model (PSC 박스 거더 철도교량의 해석 및 스트럿-타이 모델에 의한 격벽부 설계)

  • Song, Ha-Won;Kim, Hyoung-Woon;Kim, Young-Hoon;Byun, Keun-Joo
    • Journal of the Korean Society for Railway
    • /
    • v.1 no.1 s.1
    • /
    • pp.30-39
    • /
    • 1998
  • The functions of diaphragms at abutments and piers of PSC box girder railway bridge are to transfer forces from the superstructure onto bearings or columns and to stiffen the superstructure cross-section against in -plane deformation. Due to stress disturbance at diaphragm, the design for the diaphragm using conventional design method is relatively irrational than those for other structural members. And, due to contribution to boundary condition of deck slab by the diaphragm, the behavior of deck slab near the diaphragm is different from that of the deck slab obtained from two dimensional analysis of the bridge, which is basis for the design of deck slab. In this paper, three dimensional behavior of deck slab near the diaphragm of prestressed concrete (PSC) box girder railway bridge constructed by the precast span method are analyzed by using three dimensional finite element modeling and using the strut-and-tie model design of the diaphragm are presented. The modeling techniques used in this paper can be applied effectively to examine the causes of cracks at deck slab near diaphragm and to design diaphragm rationally.

  • PDF

Effect of the Combination of Point Loads on the Design Flexural Capacity for Fiber Reinforced Concrete Floor Slab (집중하중 조합에 의한 섬유 보강 콘크리트 바닥슬래브의 설계 휨 내력)

  • Lee, Jong-Han;Cho, Baik-Soon;Kim, Jung-Sik;Cho, Bum-Gu;Ki, Han-Sik
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.1
    • /
    • pp.47-54
    • /
    • 2016
  • In this study, the flexural capacity of fiber reinforced concrete floor slabs were evaluated using main design loads, racking and moving loads. Based on design standards and guidelines, the magnitude and loaded area of each load were determined, and its relationship was assessed. For the application of a single load, flexural capacity should be evaluated in the edge of a floor slab. In addition, the slab with thickness and concrete strength, greater than 180mm and 35MPa, respectively, sufficiently satisfied flexural capacity with a minimum of equivalent flexural strength ratio. The combination of racking loads required the largest equivalent flexural strength ratio to satisfy the flexural capacity of the floor slab. The combination of racking and moving loads showed equivalent flexural strength ratio smaller than the case of combination of racking loads, but larger than the application of single racking or moving loads. The results of this study indicated that the flexure of fiber reinforced concrete floor slabs should be designed using the combination of design loads.

Correlation Analysis Between Crack and TQI in RC Slab Track (철도콘크리트 슬래브 궤도상의 균열과 TQI 상관성 분석)

  • Kwon, Sae Kon;Park, Mi Yun;Kim, Doo Kie;Park, Jae Hak
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.2
    • /
    • pp.71-79
    • /
    • 2012
  • Recently, in the total railroad construction field, the concrete slab track is adapted, not ballast track. Because the ballast track have the characteristics doing the ongoing maintenance and difficult to handle increasing maintenance costs, eventually the concrete slab track is selected as an alternative. However, owing to the hydration heat reactions and temperature affected shrinkage cracks related to concrete itself, a variety of studies to solve maintenance problems related to concrete slab track are underway. This study analysed characteristics of TQI values evaluating the track irregularity, searched the relationship between crack progress and TQI, and then evaluated of the correlation between the two values. Through this method, there is a need to complete the problems of the current method, only TQI is the main decision making tool in track maintenance, and also the need for the development of evaluation index considering the crack.

Strengthening of steel-concrete composite beams with composite slab

  • Subhani, Mahbube;Kabir, Muhammad Ikramul;Al-Amer, Riyadh
    • Steel and Composite Structures
    • /
    • v.34 no.1
    • /
    • pp.91-105
    • /
    • 2020
  • Steel-concrete composite beam with profiled steel sheet has gained its popularity in the last two decades. Due to the ageing of these structures, retrofitting in terms of flexural strength is necessary to ensure that the aged structures can carry the increased traffic load throughout their design life. The steel ribs, which presented in the profiled steel deck, limit the use of shear connectors. This leads to a poor degree of composite action between the concrete slab and steel beam compared to the solid slab situation. As a result, the shear connectors that connects the slab and beam will be subjected to higher shear stress which may also require strengthening to increase the load carrying capacity of an existing composite structure. While most of the available studies focus on the strengthening of longitudinal shear and flexural strength separately, the present work investigates the effect of both flexural and longitudinal shear strengthening of steel-concrete composite beam with composite slab in terms of failure modes, ultimate load carrying capacity, ductility, end-slip, strain profile and interface differential strain. The flexural strengthening was conducted using carbon fibre reinforced polymer (CFRP) or steel plate on the soffit of the steel I-beam, while longitudinal shear capacity was enhanced using post-installed high strength bolts. Moreover, a combination of both the longitudinal shear and flexural strengthening techniques was also implemented (hybrid strengthening). It is concluded that hybrid strengthening improved the ultimate load carrying capacity and reduce slip and interface differential strain that lead to improved composite action. However, hybrid strengthening resulted in brittle failure mode that decreased ductility of the beam.

An Evaluation on Punching Shear Capacity of R/C Flat Plate Slab (RC 플랫 플레이트 슬래브의 뚫림전단성능평가)

  • Kim, Jong-Keun;Shin, Sung-Woo;Yang, Ji-Soo;Lee, Li-Hyung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.205-213
    • /
    • 2003
  • The primary purpose of this study is to investigate punching shear capacity of flat plate slab using high strength concrete in column. It may be much contributed to economy efficiency and structural advantages that High Strength Concrete(HSC) used for vertical member and Normal Strength Concrete(NSC) for horizontal member. Therefore, six plate flat slab specimens with HSC column and NSC slab had been made and tested with real scale. The major variables were compressive strength of concrete(fck=285, $460kgf/cm^2$), extended length of HSC from column face and amount of shear reinforcements. As the result of this test, the maximum load and punching shear capacity of specimens is affected by extended length and shear reinforcements.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF