• Title/Summary/Keyword: Concrete slab

Search Result 1,734, Processing Time 0.042 seconds

Mapped relationships between pier settlement and rail deformation of bridges with CRTS III SBT

  • Jiang, Lizhong;Liu, Lili;Zhou, Wangbao;Liu, Xiang;Liu, Chao;Xiang, Ping
    • Steel and Composite Structures
    • /
    • v.36 no.4
    • /
    • pp.481-492
    • /
    • 2020
  • To study the rail mapped deformation caused by the pier settlement of simply - supported bridges with China Railway Track System III (CRTS III) slab ballastless track (SBT) system under the mode of non-longitudinal connection ballastless track slab, this study derived an analytical solution to the mapped relationships between pier settlement and rail deformation based on the interlayer interaction mechanism of rail-pier and principle of stationary potential energy. The analytical calculation results were compared with the numerical results obtained by ANSYS finite element calculation, thus verifying the accuracy of analytical method. A parameter analysis was conducted on the key factors in rail mapped deformation such as pier settlement, fastener stiffness, and self-compacting concrete (SCC) stiffness of filling layer. The results indicate that rail deformation is approximately proportional to pier settlement. The smaller the fastener stiffness, the smoother the rail deformation curve and the longer the rail deformation area is. With the increase in the stiffness of SCC filling layer, the maximum positive deformation of rail gradually decreases, and the maximum negative deformation gradually increases. The deformation of rail caused by the pier settlement of common-span bridge structures will generate low-frequency excitation on high-speed trains.

Influence of bi-directional seismic pounding on the inelastic demand distribution of three adjacent multi-storey R/C buildings

  • Skrekas, Paschalis;Sextos, Anastasios;Giaralis, Agathoklis
    • Earthquakes and Structures
    • /
    • v.6 no.1
    • /
    • pp.71-87
    • /
    • 2014
  • Interaction between closely-spaced buildings subject to earthquake induced strong ground motions, termed in the literature as "seismic pounding", occurs commonly during major seismic events in contemporary congested urban environments. Seismic pounding is not taken into account by current codes of practice and is rarely considered in practice at the design stage of new buildings constructed "in contact" with existing ones. Thus far, limited research work has been devoted to quantify the influence of slab-to-slab pounding on the inelastic seismic demands at critical locations of structural members in adjacent structures that are not aligned in series. In this respect, this paper considers a typical case study of a "new" reinforced concrete (R/C) EC8-compliant, torsionally sensitive, 7-story corner building constructed within a block, in bi-lateral contact with two existing R/C 5-story structures with same height floors. A non-linear local plasticity numerical model is developed and a series of non-linear time-history analyses is undertaken considering the corner building "in isolation" from the existing ones (no-pounding case), and in combination with the existing ones (pounding case). Numerical results are reported in terms of averages of ratios of peak inelastic rotation demands at all structural elements (beams, columns, shear walls) at each storey. It is shown that seismic pounding reduces on average the inelastic demands of the structural members at the lower floors of the 7-story building. However, the discrepancy in structural response of the entire block due to torsion-induced, bi-directionally seismic pounding is substantial as a result of the complex nonlinear dynamics of the coupled building block system.

Size Effects in the Failure of Simple Supported Sandwich Slab Bridges (단순지지된 샌드위치 슬래브교량의 파괴시 치수효과)

  • Han, Bong-Koo;Kim, Duck-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.83-90
    • /
    • 2010
  • Composite materials can be used economically and efficiently in civil engineering applications when standards and procedure for analysis, design, construction and quality control are to be established. Bridge systems, including the girders and cross-beams, and concrete decks behave as the specially orthotropic plates. For such systems with sections, boundary conditions other than Navier solution types, it is very difficult to obtain its analytical solution. To design the bridge made by the composite materials, cross-section was used as the form-core shape for economical reason and finite difference method was used for output of the stress value. The Tsai-Wu failure criterion for stress space is used. In this paper, the rate of tensile strength reduction due to increased size was considered. And also numerical study is made for these cases.

A Study on the Optimum Mix and Exposing Method of the Fine-Size Exposed Aggregate PCC Pavements (소입경 골재노출콘크리트포장의 최적 배합 및 노출기법에 관한 연구)

  • Kim, Young-Kyu;Lee, Seung-Woo;Yoo, Tae-Seok;Kim, Hyung-Bae
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.1-15
    • /
    • 2009
  • Surface of exposed aggregate concrete pavements is consists of exposed coarse aggregate by removing upper 2$\sim$3mm mortar of concrete slab. Exposed aggregate concrete pavements have advantages of maintaining low-noise and adequate skid-resistance level during the performance period. In order to provide the successful exposed concrete aggregate pavement, uniform distribution of the coarse aggregate on pavement surface through adequate the mix design and exposing method. The mix design in concrete pavement is generally designed on the basis of strength, but mix design of exposed aggregate pavement employed in this study includes the consideration of noise and skid resistance, as well as strength. Smaller of maximum coarse aggregate is known to be effective for reduce noise level. Optimum mix design and exposing method of fine-size exposed aggregate portland cement concrete pavement that can reducing the noise and maintain the adequate level of skid resistance are proposed in this study. To consider the variation of optimum exposing time due to the hardening speed of mortar by climatic condition, quantitative is also suggested measurement of hardening state.

  • PDF

Applicability of Current Design Code to Class B Splice of SD600 Re-Bars (SD600 철근의 B급 겹침 이음에 대한 현행설계기준의 적용성)

  • Choi, Won-Seok;Chung, Lan;Kim, Jin-Keun;Park, Hong-Gun
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.4
    • /
    • pp.449-459
    • /
    • 2011
  • An experimental study was performed to evaluate the applicability of current design code to the class B splice of SD600 reinforcing bars. Twelve simply supported beam and slab specimens with re-bar splices were tested under monotonic loading. Parameters for this test were re-bar diameter, concrete cover thickness, concrete strength, and stirrup spacing. Concrete strengths ranged 24.7~55.3 MPa. Most of the specimens were designed to satisfy the class B splice length specified by current design code. Average bar stresses resulting from this test were compared with the predictions by the KCI code provisions. Based on the result, the applicability of the current design code to SD600 re-bars were evaluated. The re-bar splices gave satisfactory performance for all D13 re-bar splices and for D22 and D32 splices with transverse reinforcement. On the basis of the test result, for D22 and the greater diameter bars, the use of either transverse reinforcement of the thicker concrete cover was recommended.

Analysis of Dowel Bar Placement Accuracy with Construction Methods (시공방법에 따른 다웰바 시공상태 분석)

  • Lee, Jae-Hoon;Kim, Hyung-Bae;Kwon, Soon-Min;Kwon, Ou-Sun
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.101-114
    • /
    • 2007
  • Dowel bars in the jointed concrete pavement are used to both provide load transfer across pavements joints and prevent the joint faulting leading to longer service life. On the contrary, the misplacement of dowel bar can provide negative results including the joint freezing(locking) that may cause the joint spatting and unexpected mid-slab cracking. The dowel bar can be placed using the assembly or dowel bar inserter (DBI) during the concrete pavement construction. In the domestic practice of the concrete pavement construction, the dowel bar is placed using the assembly method. This study primarily focuses on the comparison of these two dowel placement methods using the field data from the KHC test road in which both dowel placement methods have been applied to a certain length of the concrete pavement. The field data regarding the alignment of the dowel bars placed by both methods was collected using MIT-SCAN2, a nondestructive measuring equipment, and processed to compute Joint Score and Running Ave. Joint Score which are used as indicators of the dowel bar performance. The comparison of the methods for the dowel bar placement using these indicators shows that the DBI method provided much better alignment of the dowel bars reducing the risk of joint freezing than the assembly method. In order to improve the quality of the dowel bar placement using the assembly method, the current weak points of the assembly method including the fabrication, storage, and installation of dowel bar assembly were investigated and the solution was suggested. The improved dowel bar sets based on the suggested solution have been applied to an actual practice of the concrete pavement construction. The field data shows that the improved assembly method suggested in this study can highly reduce the risk of joint freezing.

  • PDF

Static Behavior of Steel-Concrete Composite Beam with Perfobond Rib Shear Connector (Perfobond rib 전단연결재가 설치된 강.콘크리트 합성보의 정적거동)

  • Ahn, Jin Hee;Chung, Hamin;Kim, Sang Hyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.4
    • /
    • pp.421-432
    • /
    • 2009
  • In this study, push-out and static loading tests were conducted to evaluate the behavioral characteristics of composite beams with a perfobond rib shear connector. The shear capacity of the perfobond rib was found to be proportional to its concrete strength, which is in turn affected by the increase in the concrete end-bearing strength and concrete dowel action to resist the shear force. The relative slips of the push-out specimen, however, which was used to assess the ductility of the shear connector, increased to some extent, but it no longer increased when it reached the critical concrete strength because of the flexibility of the transverse rebar in the rib hole. The static-loading-test results revealed a crack on the concrete slab in the composite beam with a perfobond rib on the side of the rib hole and transverse rebar for the applied moment and shear force to the rib hole, depending on the static loading. The shear resistance characteristics of the perfobond rib shear connector were found to resist the shear force from the relative slip on the interface of the composite beam. Thus, the sectional effect of the shear connector to the composite beam with a perfobond rib should be considered when designing the composite beam because the behavior of the composite beam can change owing to the shear connector.

Flexural Strength Evaluation of Steel Plate-Concrete Composite Beam using Bolted (절곡 강판을 볼트로 체결한 강판-콘크리트 합성보의 휨강도 평가)

  • Han, Myoung-Hwan;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.126-136
    • /
    • 2018
  • A steel-plate concrete composite beam is composed of a steel plate, concrete and shear connector to combine inhomogeneous two materials. The steel plate is assembled by welding an existing composite beam. In this study, new steel-plate concrete composite beam, called a SPC Beam, was developed to reduce the shear connector and improve the workability. The SPC Beam was composed of folding steel plates and concrete, without a shear connector. The folding steel plate was assembled using high strength bolt instead of welding. To improve the workability in field construction, a hat-shaped Cap was attached to the junction with a slab. Monotonic load testing under two points was conducted under displacement control mode. The flexural strength of the specimen for positive moment and negative moment was calculated using the plastic stress distribution method. The test results showed that the flexural strength of the new SPC Beam had 80% of the strength of a complete composite beam. In addition, increasing the composite ratio was possible through clearance controls of the cap. In this study, the performance of the SPC Beam was verified through additional experiments and analyses with the cross-sectional shape and cap as variables, because the representative shape in the positive negative moment region is targeted.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Prediction of Crack Pattern of Continuously Reinforced Concrete Track Induced by Temperature Change and Shrinkage of Concrete (온도 변화와 콘크리트 수축에 의한 연속철근 콘크리트궤도의 균열 발생 패턴 예측)

  • Bae, Sung Geun;Choi, Seongcheol;Jang, Seung Yup;Cha, Soo Won
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.270-280
    • /
    • 2014
  • In this study, to examine the causes of cracks in continuously reinforced concrete tracks (CRCTs) and the main factors affecting cracking, a field survey on the status of cracks and crack patterns in the Gyeong-bu high speed line was conducted, and the crack patterns of CRCT due to the temperature difference between the top of the slab (TCL) and the bottom of the subbase (HSB) and the drying shrinkage of concrete were predicted by a nonlinear finite element model considering the structure of CRCT. The results of the numerical analysis show that cracks will be developed at the interface between the sleeper and the TCL, and under the sleeper due to the temperature difference and concrete shrinkage. This corresponds well to the crack locations found in the field. Also, it is found that the most significant factors are the coefficient of thermal expansion with respect to the temperature difference, and the drying shrinkage strain with respect to shrinkage. According to the results, the reinforcement ratio should be carefully determined considering the structures of CRCT because the crack spacing is not always proportional to the reinforcement ratio due to the sleepers embedded in the TCL.