• 제목/요약/키워드: Computational Building Information Modeling (BIM)

검색결과 94건 처리시간 0.03초

초기 설계단계 에너지 성능평가를 위한 IFC 기반 IDF 변환기 개발 (Development of the IFC based IDF Converter for Energy Performance Assessment in the Early Design Phase)

  • 김인한;김지은;최중식
    • 한국CDE학회논문집
    • /
    • 제16권2호
    • /
    • pp.146-155
    • /
    • 2011
  • As the seriousness of environmental pollution being on a rise, a low carbon and environment-friendly design for energy efficiency has been issued. With respect to energy in the construction industry, an adoption of BIM which is possible for the various energy performance assessments in the early design phase has been actively working on. In the most cases of energy performance assessment, the data compatibility from the lack of standard software and format became a problem and the improvement for data compatibility system has been needed. This study is to develop the IFC based IDF converter as a middleware which connects between BIM software and energy analysis software. For the building energy performance assessment, Energy Plus and IFC are selected for the standard energy analysis software and its file format. Parameters are organized by steps and the integrated material library is built so it is trying to reduce the existing problem of energy software interface as much as possible. The development of IDF Converter will promote the spread of related fields with increasing the BIM standard and the utilization of energy performance assessment.

강상자형 교량의 BIM기반 내진해석 프로세스 (Seismic Analysis Process of Steel Box girder Bridge based on BIM)

  • 이헌민;이진경;유재명;신현목
    • 한국전산구조공학회논문집
    • /
    • 제24권4호
    • /
    • pp.421-428
    • /
    • 2011
  • 국내 토목분야의 건설산업에서는 비효율적인 의사소통으로 인하여 발생하는 업무전환 단계에서의 정보누락 및 그로 인한 비용손실 등의 문제점을 해소시키기 위한 획기적인 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보활용의 효율성을 극대화시킨다. 본 논문에서는 BIM기반의 교량건설 프로젝트의 구조설계 업무에서 사용할 목적으로 강상자형 교량의 3차원 정보모델을 활용한 내진해석 프로세스를 제안하였다. 또한 3차원 정보모델의 속성정보들이 구조적 데이터를 내재할 수 있도록 하기 위하여 3차원 모델링작업이 구조설계 업무를 통하여 결정되는 정보들을 활용하여 이루어질 수 있도록 하는 프로세스를 제안하였다. 제시된 프로세스는 현재 건설이 진행 중인 강상자형 교량을 적용하여 구성하였다. 또한 프로세스를 적용하여 내진해석의 최종 산출물인 내진계산서의 도출이 가능하다.

BIM기반 철근콘크리트구조의 물량산출 비교 (A Comparison of Quantity Take-Offs of RC Structures based on BIM)

  • 윤종덕;조현식;이재홍;신재용;김은석
    • 한국전산구조공학회논문집
    • /
    • 제33권1호
    • /
    • pp.35-44
    • /
    • 2020
  • 최근 건설업계에서 설계시의 수량산출 및 예정공사비의 정확도에 대한 요구가 높아지고 있으며, 설계변경 시에 즉각적인 물량의 변화와 공사비의 변화를 파악하는 것이 중요한 이슈가 되고 있다. 또한, 수량과 공사비와 관련한 각종 소송들이 빈번하게 발생하면서 이를 해결하기 위한 방안으로 BIM기반의 물량산출 및 견적이 대안으로 등장하였다. 그러나 현재 BIM기반의 물량산출 및 견적은 2D 기반의 기존 방식보다 활용이 원활하지 못하다. 이는 물량산출 및 내역에 대한 국가적인 표준이나 기준이 마련되어 있지 못하고, 산출 작업자의 경험이 중요한 요소로 작용하기 때문이다. 하지만, 이는 견적의 관점이고 설계자의 관점에서 BIM을 이용한 즉각적이고 비교적 정확도가 우수한 수량과 공사비의 파악이 예산에 맞는 설계를 진행하기 위하여 필요하다. 본 연구에서는 서울시 ◯◯타운 생활관의 철근콘크리트 구조의 콘크리트, 철근, 거푸집의 수량을 사례로 2D기반의 설계수량과 BIM을 기반으로 한 계획설계, 실시설계 시의 수량과 실제 시공수량을 비교·분석하고 차이가 발생하는 원인을 분석하여 향후 설계자 관점에서 BIM기반의 수량산출에 도움이 되고자 하였다.

BIM 기반 건설 프로젝트의 협업 지원 시스템 (A Building Information Modeling based Collaboration Supporting System for Construction Project)

  • 윤수원;진상윤;최철호;이강;신태홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.476-481
    • /
    • 2008
  • The objective of this paper is to propose a conceptual framework of a BIM based collaboration supporting System, called Construction Project Life Cycle Management (CPLM). The framework of CPLM is proposed by reflecting the characteristics of the AEC industry such as deliverly methods, process, fragmentation, etc.. And it is a system intended to help project participants make better decisions and to facilitate coordination between various stakeholders in a project by providing virtual collaboration environment.

  • PDF

BIM기반 철근콘크리트 보의 주철근 자동배근 매크로 생성 및 구현에 관한 연구 (The Study on Development of Automatic Main Placing Macro of Beams for RC Structures based on BIM)

  • 조영상;신태송;홍성욱;이제혁;장현석
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.537-540
    • /
    • 2010
  • 본 논문에서는 보의 주철근을 대상으로 건물정보모델링(BIM, Building Information Modeling)통합 설계 시스템 상에서 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근 시스템(ARPM, Automatic Reinforcement Placing Module)을 개발하는데 목적이 있다. 구조분야에서의 BIM 프로세스는 정보호환체계를 구축하는 과정에 있으며, 철골 구조 프로세스의 경우 표준 호환 포맷을 이용하여 원활한 정보 호환 체계를 유지하고 있다. 하지만, 철근 콘크리트의 BIM 통합 설계 시스템은 철근 배근정보의 생성과 호환이 원활하지 않아 표준 정보 호환 체계가 구축되지 않은 실정이다. 기존 2차원 기반 프로세스에서는 철근 배근 설계에 있어 표준화된 기준에 따른 배근이 아닌 관행이나 일률적인 배근 지침에 따라 배근 상세를 정하고 있고, 2차원 배근 설계 결과만 제시하고 있어 상호 호환 가능한 철근 배근 정보데이터가 생성되지 않는다. 철근 콘크리트 구조에서의 철근 배근 정보를 생성하고 BIM 통합 구조 설계시스템에서의 정보 호환성을 확보하기 위해, 보의 주철근을 대상으로 구조 해석 데이터베이스와 통합 설계 플랫폼 간의 호환 시스템을 생성하고, 콘크리트학회 콘크리트 구조설계기준에 따른 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근시스템(ARPM)을 개발하는데 목적이 있다.

  • PDF

국내 건설 산업에서의 물량산출 특성을 고려한 공법기반 견적자동화 시스템 개발 (Development of Construction Method based Automated Estimation System Considering Characteristics of the Domestic Construction Industry)

  • 정준호;이창희;김성아;진상윤;최철호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.93-96
    • /
    • 2010
  • 현재 국내외에서 Building Information Modeling을 적용한 여러 분야의 연구가 활발하게 진행되고 있으며, 일부 국외에서는 3D 기반의 견적을 실제 프로젝트에 반영하고 있다. 반면, 국내 건설 프로젝트에서는 여전히 2D 설계도면과 물량산출 프로그램을 이용하여 견적이 이루어지고 있다. 작업의 신속성 및 정확성을 중요시하는 국내 견적 문화에서는 3D 기반의 물량산출 방식 도입을 부정적으로 바라보는 시각이 있으나, 향후 건설 산업의 경쟁력 확보를 위해서 3D 기반 견적작업이 필요하다. 이에 국외에서 상용화된 견적 시스템을 국내 건설 프로젝트에 적용한 결과, 몇 가지 한계점이 있는 것으로 드러나 국내 견적 방식에 적합한 3D기반의 물량산출 프로그램 개발이 절실한 상황이다. 따라서 본 연구에서는 국내 건설 산업에서의 물량 산출 특성을 반영한 공법기반 견적자동화 시스템 개발 및 검증을 통해 국내 3D 기반의 견적 도입을 앞당기고자 한다.

  • PDF

아파트 최적 배치 자동화 - Rhino Grasshopper를 활용한 parametric model의 최적화를 중심으로 - (Automation in Site Planning of Apartment Complex - Through Rhino Grasshopper's Parametric Modeling and Optimization -)

  • 성우제;정요한
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.22-32
    • /
    • 2020
  • Apartment building site planning is one of time consuming and labor-intensive tasks in architectural design field, due to its complexity in zoning regulations, building codes, local restrictions, and site-specific conditions. In other words, the process can be seen as a very complicated mathematical function with layers of variables and parameters, which ironically can be automated using computational methods on parametric tools. In this paper, a practical method of automating site planning of an apartment complex has been proposed by utilizing parametric approaches in Rhino 3D and Grasshopper. Two primary parameters, building heights and positions, determine the efficacy of building layouts under all regulatory standards, thus testing out numerous combinations of the two will produce some successful layout alternatives. For this, equation solver has been used for iterating the parametric model to sort out meaningful results among others. It also has been proven that the proposed process significantly reduced the time in site planning down to less than an hour on most cases, and many successful alternatives could be obtained by using multiple computers. Post evaluation processes such as day light and view shed analysis helped sort out the best performing ones out of functioning alternatives.

BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안 (Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management)

  • 김한도;남정용;김용주;류인혜
    • 한국전산구조공학회논문집
    • /
    • 제36권6호
    • /
    • pp.381-389
    • /
    • 2023
  • BIM에서 가장 중요한 요소 중의 하나가 디지털 데이터이다. 체계적인 디지털 데이터 관리를 위해 최근까지 연구를 통해 객체분류체계(OBS)와 속성분류체계(Pset)가 제시되어 왔다. 특히 공정 및 기성 관리에 사용되는 디지털 데이터는 WBS와 CBS로 나뉘고 이를 BIM 객체와 매핑하려면 CBS의 수량 분개가 필요한데 CBS는 양이 매우 방대하고 공종이나 규격, 명칭 및 CBS 코드가 발주처마다 상이하여 WBS나 BIM 모델에 맞는 수량 분개 작업을 엑셀 등을 이용해서 수작업으로 한다는 것은 사실상 어렵다. 이러한 문제점을 극복하기 위해 BIM 모델에 의해 산출하기 힘든 수량 중에서 대부분을 차지하는 연장에 근거한 수량의 전체분을 분개하는 방안, 축적된 WBS-CBS 이력으로부터 최적 CBS를 도출하는 방안과 합리적인 CBS 데이터베이스 구축을 위해 필수적인 CBS 코드 통합 표준화 방안을 제시하였다.

개방형BIM기반 2D도면 자동 생성 프로그램 개발에 관한 연구 (Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies)

  • 김인한;이민재;최중식;김구택
    • 한국CDE학회논문집
    • /
    • 제21권4호
    • /
    • pp.417-425
    • /
    • 2016
  • Especially for resolving BIM data compatibility issue, as one of recently raised BIM technology issues, has also been improved by using open BIM, representatively using IFC (Industry Foundation Classes) format. As shown in many case studies, usefulness of BIM technology is increasing day by day, and the IFC-based open BIM technology is essential in recent AEC projects where the productive collaboration is of importance. One of current problems in actual projects is that there is a conflict between conventional ways and newly developed BIM ways. Using both conventional and new technologies leads construction workers to having more work loads, consequently the efficiency and productivity of on-site workers have been decreased. Thus, it is strongly necessary to facilitate 3D BIM models to extract and generate 2D precision drawings in automation, especially using open BIM technologies. Some native BIM authoring tools have limitations in there automatic generation of 2D drawings, and there is no standardized mechanism to generate 2D drawings from heterogeneous applications. For this reason, this paper aims to develop an automated stand-alone program to generate 2D drawings in automation using IFC file, totally independent from various BIM authoring tools. By using the application described in this paper, any type of general drawings such as plan, section and elevation can be extracted without additional efforts. The development approach described in this paper, based on the open BIM technologies, has a strong impact to the current process especially in the perspective of enhancing productivity when we need to find out a trade-off in-between conventional and new approaches.

건축물 사용승인 제도의 현장조사 자동화를 위한 UAV활용방안 연구 (A Study on Utilization of Unmanned Aerial Vehicle for Automated Inspection for Building Occupancy Authorization)

  • 이승현;류정림;추승연
    • 한국CDE학회논문집
    • /
    • 제22권1호
    • /
    • pp.44-58
    • /
    • 2017
  • The inspection for building occupancy authorization has lacked objectivity due to manual measurement methods. This is why connivance of the illegal buildings has been rampant, which has led to so many incidents. Consequently, this law has lost its intent to protect people's lives and property. In this study, for the purpose of improvement of this law, the research was conducted by the utilization of unmanned aerial vehicle for automated inspection for building occupancy authorization. Theoretical considerations about building occupancy authorization and the trend of UAV technology were accomplished. Secondly, a series of reverse engineering was conducted including digital photography, network RTK-VRS surveying and post-processing data. Thirdly, the resultant spatial information was used for building occupancy inspection authorization in a BIM platform and the effectiveness and applicability of UAV-based inspection was analyzed. As a result, methodology for UAV-based automated building occupancy inspection authorization was derived. And it was found that eleven items would be possible to be automated among thirty total items for building occupancy authorization. Also it was found that UAV-based automated inspection could be valid in inspecting building occupancy authorization due to authentic accuracy, effectiveness and applicability with government policy.