• Title/Summary/Keyword: Competitive electricity market

Search Result 197, Processing Time 0.023 seconds

A Study on the Market Power and Transmission Rights in Electricity (송전권이 지역적 시장지배력에 미치는 영향 고찰)

  • Park, J.S.;Han, S.M.;Kim, K.M.;Kim, B.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.855-857
    • /
    • 2005
  • Transmission congestion is one of the Key factor to local market power in competitive electricity markets. Financial transmission rights provide the financial protection to their holders by paying back the congestion cost. However, the market participants who have market power can exacerbate their market power. This paper analyzes the effect of exercising local market power with the rights on the market price. The proposed methodology was demonstrated with the Optimal Power Flow(OPF). Case study is fulfilled by GAMS simulation. The simulation are condusted in case of Nodal Pricing.

  • PDF

Evaluation Methodology of System Interruption Cost Taking into Consideration Failure Rate of Distribution Facilities (배전기자재별 고장확률을 고려한 배편계통 수용가 정전비용 산출 기법)

  • Choe, Sang-Bong;Kim, Dae-Gyeong;Jeong, Seong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.5
    • /
    • pp.232-237
    • /
    • 2002
  • It is increased for methodology to evaluate distribution power system interruption cost in power supply zones under competitive electricity market. This paper presents algorithms to evaluate system interruption cost in distribution power supply zones taking into consideration failure rate of distribution facilities and composite customer interruption cost. In this paper, it is introduced for weighting factor for each customer failure duration and failure rate of distribution facilities to evaluate reasonable system interruption cost in distribution power supply area. Also, this Paper estimates evaluation results of system interruption cost using a sample model system. Finally, evaluation results of system interruption cost based on failure rate of distribution facilities and composite customer interruption cost are shown in detail.

A Development Of The Window-Based Load Management System Package In A Competitive Electricity Market (경쟁적 전력시장의 윈도우 기반 부하관리 시스템 패키지 개발)

  • Chung, Koo-Hyung;Kim, Jin-Ho;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.441-443
    • /
    • 2002
  • This paper presents a window-based load management system (LMS) package developed as a decision-making tool in the competitive electricity market. The presented LMS package can help the users to monitor system load patterns, analyze their past energy consumption and schedule the future energy consumption. The LMS package can also provide the effective information on real-time energy/cost monitoring, consumed energy/cost analysis, demand schedule and cost-savings. The developed LMS package can be used to establish the optimal demand schedule and consumption strategy.

  • PDF

A Cooperative Game Embedding Transmission Pricing in the Competitive Electricity Market (송전요금을 고려한 게임이론적 전력거래분석)

  • Kang, Dong-Joo;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.3-5
    • /
    • 2000
  • It has been the paradigm of game theory that more than two utilities compete and determine the price and amount of dispatch. In order for this theory to be available on real power system, it is necessary to consider the transmission costs as well as the generation costs. In addition Independent System Operator(ISO) should be able to mitigate the congestion, recover the transmission costs and provide information for long-term capacity investment by devising reasonable pricing schemes for the transmission services. Generators also have to take the transmission costs into account when building the bidding strategies. This paper proposes an approach to analyzing the profit maximizing game considering the transmission cost in a competitive electricity market.

  • PDF

A Study on Contingency Constrained Optimal Power Flow Algorithm (상정사고를 고려한 최적조류계산 알고리즘에 관한 연구)

  • Joung, Sang-Houn;Chung, Koo-Hyung;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.3
    • /
    • pp.123-127
    • /
    • 2006
  • The recent movement to deregulated and competitive electricity market requires new concepts in applying dispatch algorithms to system operation and planning. As power systems tend to be operated more closely to their ultimate ratings, the role of Contingency Constrained Optimal Power Flow is changed and the importance for security enhancement will be more increased in the new and competitive electricity market. This paper presents a contingency constrained optimal power flow (CCOPF) algorithm. The proposed algorithm maintains the nodal voltage levels and transmission line's power flow within the specified limits before and after a contingency. A case study demonstrates the proposed algorithm with the IEEE-14RTS under N-1 contingency criterion.

Reliability Pricing Model system construction (신뢰도기반 가격산정모델 시스템 구축)

  • Lee, Cheon-Ho;Han, Seok-Man;Kim, Jong-Hyuk;Chung, Koo-Hyung;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.812-813
    • /
    • 2007
  • The procurement of generation and transmission/Distribution capacity in vertically-integrated electric industry is sufficient by facility construction in suitable time. However, the introduction of competitive electricity market increase the efficiency of availability for facilities and fuels. As a result, long-term capacity procurement is required for stable demand-supply balance since it is expected to maintain their generation capacity at a minimum for profit maximization. In this paper, a new long-term capacity procurement mechanism is constructed, which is able to assure supplemental contribution in competitive electricity market.

  • PDF

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

An Assessment of Local Market Power and Bid Cap Under Uniform Pricing Scheme (Uniform Pricing하에서의 지역적 완화방안으로서의 Bid Cap)

  • 신영균;김발호;전영환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.10
    • /
    • pp.610-615
    • /
    • 2003
  • With the growing competitive pressure from market participants, utilities, consumer and government, analyses of existing competitive electricity market become more important. The presence of congestion in the transmission system can significantly increase the potential of exercising market power. Since the congestion in the network depends on the several factors, the market power cannot be simply analyzed through the existing indices. This paper presents a systematic analysis on local market power under uniform pricing scheme and provides determining approach of the level of price cap as mitigation measure of the strategic market power.

Profit Evaluation Model for a Generator Investment in the Wholesale Electricity Market (도매전력시장에서의 발전기 투자 수익 평가 모형)

  • Jung, Jung-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.7
    • /
    • pp.1205-1210
    • /
    • 2007
  • Several mechanisms are introduced for the procurement of capacity adequacy. In the competitive electricity market, however, it is a GENCO that makes generation investment decision. A GENCO will invest a new generator when it can get more profit than cost. There requires a model to evaluate profit with respect to a new generation investment. In the view of long-term investment, evaluation of a profit of a generator in the electricity market is quite different from that of short-term operation. In this paper, a new profit-evaluation model is proposed for the long-term generation investment. It can treat the probabilistic characteristics of generators, ie, forced-outage-rates, which affect profit of generators.

A Study on the Assessment of Reasonable Reserve Margin in Basic Plan of Electricity Supply and Demand (전력수급기본계획의 적정 설비예비율 산정 개선방안)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.418-419
    • /
    • 2006
  • After electricity power industry restructuring, "Long term power development plan", setting up by government, is replaced by "Basic plan of electricity supply and demand". In this basic plan, one of the most important factors is assessment of appropriate capacity margin. The benefit of GENCO is decided by the market price, and the price is largely affected by the level of reserve margin. As a consequence, appropriate reserve margin is determined by market power. However, Cost Based Pool(CBP) is a limited competitive market, and government policy for supply and demand is very important factor or reserve margin determination. This paper points out issues about existing reserve margin assessment method which is used in basic plan and suggests improved assessment method. In the case study, capacity margin is calculated by proposed assessment method and result shows the advantages of suggested method.

  • PDF