Collapsible soil presents a porous unsaturated structure, its sudden settlement after humidification, without supplementary charge, can be of a big nuisance for the foundations and therefore for the constructions built on it. To improve its structure and limit its instability, samples of laboratory reconstituted soil, with different percentages of water contents and compacted at different compaction energies, were treated with glass-fiber. The study of the mechanical behavior was performed by oedometer tests. The microstructure was explored by the Scanning Electron Microscope (SEM). The results obtained show clearly the efficiency of the treatment with glass fiber on reducing the collapsibility of such soil.
The formation of biopolymer-soil matrices mainly depends on biopolymer type and concentration, soil type, pore fluid and phase transfer to influence its strengthening efficiency. In this study, the physical and mechanical properties of sodium alginate (SA) treated kaolinite are investigated through compaction test, thread rolling teat, fall cone test and unconfined compression test with considering biopolymer concentration, curing time, initial water content, mixing method. The results show that the liquid limit slightly decreases from 69.9% to 68.3% at 0.2% SA and then gradually increases to 98.3% at 5% SA. At hydrated condition, the unconfined compressive strength (UCS) of SA treated clay at 0.5%, 1%, 2% and 3% concentrations is 2.57, 4.5, 7.1 and 5.48 times of untreated clay (15.7 kPa) at the same initial water content. In addition, the optimum biopolymer concentration, curing time, mixing method and initial water content can be regarded as 2%, 28 days, room temperature water-dry mixing (RD), 50%-55% to achieve the maximum unconfined compressive strength, which corresponds to the UCS increment of 593%, compared to the maximum UCS of untreated clay (780 kPa).
To cope with the mass-production and supply of plug seedling, the supply of transplanters is necessary. In the study, a transplanting test was carried out to find the optimum working condition in the mechanizd transplantation and to acquire the basic data for the improvement of transplanters by the research and analysis of working capacity of the local manual transplanters. The size of hopper affected transplanting stand and rate. Re-irrigation was required for the transplanted seedlings because they wilt 1 day after the transplanting if soil compaction is incomplete. Consequently, back-forth-left-right compaction method was good for soil covering and compaction. It may be thought to increase the amount of irrigation water at the time of transplanting by double-irrigation mechanism, but it needs to increase the larger water tank which makes the operation uneasy. So, assuming the working model by 1 or 2 operators with the machine size as small as possible, it seemed that eliminating of automatic irrigation method was desirable in view of efficiency. Though semiautomatic transplanter needs some structural improvements, it seemed still suitable for transplanting of plug seedlings such as 45-day red pepper seedlings in 128-hole tray and 25-day Chinese cabbage seedling in 128-hole tray. If traveling speed of the transplanter is limited to less than 14 m/min, with the transplanting depth of 2~3cm and transplanting space of 30cm.
Impermeable surfaces such as transportation land uses including roads and parking lots accumulate high heavy metals and particulate matters concentration especially during dry season which worsens the river water quality and distort the water circulation system during rainfall events. Recently, the government has been promoting policies to install Low Impact Development (LID) facilities such as permeable pavements or grass blocks in parking lots or pavements. However, transition of asphalt-paved surfaces to permeable pavement generated asphalt wastes which are detrimental to the environment and has cost implications due to its removal and disposal. Therefore this study was conducted to provide a method of constructing a cost-effective permeable pavement to reduce waste generation and cost. In this study, comparative analysis of the water circulation capacity and economic efficiency of the traditional construction method and new method proposed in this study through the lab-scale experiment. The proposed method was to make holes in existing asphalt pavements, layout geotextile fabric and permeable base media such as sand before compaction. After compaction, layout grass blocks on the compacted base media then layout sand in between each grass blocks before compaction. Apparently, there was no significant difference between the traditional installation method of permeable pavement and the proposed method in this study considering surface runoff, infiltrated volume, stored volume, and rainfall-runoff delay time. The proposed method in this study generated 86% less wastes compared to the traditional installation method and has 70% cost reduction considering asphalt removal and disposal. The construction method proposed in this study yielded similar performance compared to the traditional installation method and water circulation effect, but was proven to be less complicated and economical.
Kim, Jeong-Ho;Kim, Seung-Wook;Kim, Hong-Taek;Hwang, Jeong-Soon
Journal of the Korean Geotechnical Society
/
v.22
no.7
/
pp.73-83
/
2006
The behaviour characteristics of Granular Compaction Pile (GCP) are mainly governed by the lateral confining pressure mobilized in the soft soil matrix to restrain the bulging failure of the granular compaction pile. The GCP method is most effective in soft soil with undrained shear strength ranging $15{\sim}50kPa$. However, the efficiency of this method reduces the more compressible soil conditions, which does not provide sufficient lateral confinement. In the present study, the GCP method reinforced with uniformly graded permeable concrete is suggested for the extension of application to the soft ground. Also, large triaxial compression tests are conducted on composite-reinforced soil samples for verification of availability of the suggested method and the settlement estimation method of the reinforced GCP is proposed. Furthermore, for the verification of the proposed method, predicted settlements by the proposed method are compared with results of 3-dimensional numerical analyses. In addition, parametric studies are performed together with detailed analyses of relevant design parameters.
In this paper, field measurement of the Block Type Mechanically Stabilized Earth (MSE) wall curved section was performed, and the reinforced area of the curved part is studied through the result. MSE method has been applied to various fields because of easy construction and excellent economic efficiency, so that it can be easily access in our life. However due to lack of compaction and stress concentration phenomenon, cracks and collapse occur in the curve of MSE wall, which is important for safety. The cause of collapse is lack of research on curved section, lack of design criteria, lack of construction due to economical efficiency and shortening of construction period, insufficient compaction space. In this study, therefore, it was examined the existing design and construction standards, analyzed the cause through accident examples of the curved section of the Block Type MSE wall. As a result, the horizontal displacement of the curved section was 90% higher than that of the straight section and 60% higher than that of the concave section. In the case of the convex section in the curved section reinforcement region, the maximum displacement is shown in the H/2 section in the horizontal direction from the center of the MSE wall, and the range of influence from H is shown. In the case of the concave section, the maximum displacement is shown in the center, The minimum displacement was confirmed in H/4 section in the horizontal direction from the center of the MSE wall. As a basic study on the reinforcement area rehabilitation through the actual construction of block type MSE wall, the behaviors of the straight part and the curved part were compared and analyzed. And analyzed the reinforced area in order to reduce the damage of the stress concentration phenomenon and secure the safety.
This study reviewed the liquefaction reinforcement and ground reinforcement methods widely used domestically and abroad through construction method characteristics and analyzed the economic feasibility and reinforcement efficiency of each reinforcement method. The analysis results were used to evaluate the applicability of the appropriate reinforcement method for the liquefaction reinforcement of new and existing structures. As a result of evaluating the applicability of the reinforcement method based on the economic feasibility and reinforcement effect of each reinforcement method, the compaction method, which secures the construct ability by applying large equipment, is advantageous when reinforcing a new structure, and the low-fluidity mortar injection method (C.G.S method) and the high-pressure injection method (J.S.P method) are considered appropriate in the existing structure.
In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.
Transactions of the Korean Society of Automotive Engineers
/
v.6
no.5
/
pp.104-110
/
1998
In automotive industries, various processes for the cost reduction have been investigated lively. As one of them, powder metallurgy becomes influential. Compared to other methods used for he manufacture of steel components the Powder metallurgy process is competitive primarily due to the small number of production steps to reach the final geometry and thereby also the energy-efficiency. In this paper, to alter present forging process into powder metallurgy process by which the automotive clutch disc spline hub is manufactured machining process, the mechanical properties of sintered materials is investigated by specimen test. Selecting the 3 kinds of materials-SMF 4040, SMF 9060 and DHP-1, their properties according to heat treatment such as carburizing -tempering and plasma-nitrodizing are compared. By result of specimen test - tensile test, compression ring test, Impacting test, measurment of hardness, and microstructure analysis - we concluded that SMF 9060 and carburizing-tempering heat treatment is an optimal material and heat treatment method for the spline hub. It will be able to reduce manufacturing cost and weight.
Journal of The Korean Society of Agricultural Engineers
/
v.53
no.6
/
pp.121-128
/
2011
Long-term water treatment performance analysis was conducted for the constructed wetland treating agricultural tailwater. Studied wetland was established in 2001 and operated from June, 2002 to November, 2010. Wetland vegetation cover was shown over 90 % coverage after 2005. According to vegetation development, accumulation of sediment nutrient was observed; Organic Carbon, T-P and T-N. In addition, DO concentration and temperature was decreased in the constructed wetland output. An infiltration rate also significantly decreased due to compaction of wetland soil. A runoff coefficient was increased due to the low infiltration rate after 2005. A T-N, TSS and Chl.a removal rate was maintained constantly. However, the T-P removal rate was slightly decreased along to wetland operation because low DO concentration could increase elution of phosphorus from sediment. After constructing open water, the T-P removal rate was increased. This is because open water could accelerate the reaearation process. Consequently, over three years of vegetation development could be helpful for wetland performance. In addition, DO concentration is important factor to maintain the T-P treatment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.