This paper describes that the effect on the other system is generated by the single line to ground fault of the underground transmission systems and distribution systems established the common ground in trefoil. Each system is modeled by EMTP/ATPDraw and the system carry out simulations according to the various values of common ground to analyse. In this study, the result of analysis based on simulation suggests protection method and ground system of each system.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.51
no.6
/
pp.298-306
/
2002
We performed an safety evaluation on constructing of a common grounding system for electrical railway in view of its efficacy and technical fit. In order to compare the conventional grounding method, which has been individually conducted, with the common grounding with all ground wires connected in common to the counterpoise buried below the surface of the earth in parallel with rail, we set up scenarios with several cases of fault and load conditions in Chungbuk railway sections with the common grounding system. Based on models for railway conductors including the grounded system, line Parameters of railway power system are computed. The circuit model for power system with up and down lines, auto-transformers and railway substations is used to compute impedances of counterpoise and substation ground net. For each scenario with faults and operation conditions of railway, the induced potentials on signal and communication lines are also computed. It is shown that the common grounding for Chungbuk railway is superior experimentally to the conventional method in three respects: (1) the lower rail potentials during operation of railway in line, (2) the lower rail potentials for short-circuit faults between catenary and rail, and (3) the lower stress voltages on signal and communication lines for short-circuit or ground faults. The analysis results confirm that the grounding system for electric railway is required to be built by the common grounding and be evaluated on its safety in design.
This article presents an investigation of the effects on a grounding system of wireless power transfer (WPT) when transmitting over relatively far distances, that is, up to 1.25 m. Conventional two-coil WPT systems are sufficiently commercialized in strong coupling range, but it is important to accomplish the long-range WPT in weak coupling range for further various applications. This system depends on the coupling effect between the two coils that the grounds of the transmitting and receiving coils should be completely separated. However, when evaluating the performance of two-coil systems with the instrument consisting of two ports and one common ground, undesirable problems occur in weak coupling ranges, for example, obtaining disagreeable transmission efficiency and degrading system stability/reliability. We investigate the problems of the leakage power from common ground systems and provide a practical solution to obtain a reliable WPT system by using an isolation transformer. The usefulness of this approach is that it is possible to achieve the stability of the system with relatively far transmitting distances and to determine the exact transmission efficiency.
Journal of the Korea Institute of Military Science and Technology
/
v.24
no.3
/
pp.328-338
/
2021
A study on common modular design based on open standards to reduce the life cycle cost of ground weapon system is underway. Since the ground weapon system includes major mission equipment such as fire control system, it is essential to apply the concept of fault tolerance through automatic reconfiguration and blocking unspecified equipment through connectivity control. However, it is difficult to generalize due to the difference in operating characteristics for each system. In this paper, we propose a plug-and-play framework, which includes plug-and-play architecture and mechanism. The proposed method can be used in common by the application of each component as it is divided into a common service layer. In addition, the proposed connectivity control and autonomous reconfiguration method facilitates reflection of operating characteristics for each system. We constructed a verification environment that can simulate ground weapon systems and components, and verified that the proposed framework works through scenario-based functional tests.
Seo, Seok-Bae;Kim, Su-Jin;Koo, In-Hoi;Ahn, Sang-Il
Proceedings of the KSRS Conference
/
2007.10a
/
pp.544-547
/
2007
Because data processing systems in recent years are more complicated, main function of the data processing is divided as several sub-functions which are implemented and verified in each subsystem of the data processing system. For the verification of data processing system, many interface tests among subsystems are required and also a lot of simulation systems are demanded. This paper proposes CTHS (Common Test Harness System) for satellite ground segment development which has all of functions for interface test of the data processing system in one PC. Main functions of the CTHS software are data interface, system log generation, and system information display. For the interface test of the data processing system, all of actions of the CTHS are executed by a pre-defined operation scenario which is written by purpose of the data processing system test.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2007.11a
/
pp.195-197
/
2007
This paper presents experimental results on the safety of persons due to a ground fault in 22.9 kV-Y distribution system In order to evaluate the touch voltages due to internal ground faults in a step down transformer based on the newly prescribed KS C IEC 60364 standard series, the verification tests in a 22.9 kV multi-grounded neutral system were carried out From the experimental results, it was found that there will be significant potential rise jeopardizing LV equipment insulation in case of separate grounding between HV and LV system and the effective measures against hazardous touch voltages due to a IN side ground fault in the common grounding system between HV and LV system are proposed. As a consequence, it was found that the equipotential bonding is an important prerequisite for the effectiveness of the protective measures for the safety of persons in the common ground system between 22.9 kV-Y and low-voltage grounding system.
This paper is to demonstrate the effectiveness of one point grounding in support of ESS protection. One point grounding provides for the dispatching of excess energy for protection of switching equipment and personnel from lightning discharge hazards and for a natural sink for noise from atmospheric lightning and power transients. In most ESS installations there are a number of different items that must be maintained at a common ground potential for safety, fault protection or noise reduction. The items typically consist of power systems, heating and ventilating systems, distributing frames, repeating equipmets, switching equipments, etc. Grounding system of an ESS Office is most effective when all the ground points are connected to a single, common earth. The one point grounding prvides a common reference potential, keeping all the items of telecommunications facility free from the earth current and voltage hazards.
Journal of electromagnetic engineering and science
/
v.13
no.4
/
pp.214-223
/
2013
This paper proposes a theoretical analysis of hidden device detection and a design of multiband circular polarization patch array antenna for non-linear junction detector system application. A good axial ratio of circular polarization patch antenna is realized by a new approach that employs inclined slots, two rectangular grooves and a truncated ground for the conventional antenna. A good axial ratio of the 1.5 dB lower is measured by having an asymmetric gap distance between the ground planes of the coplanar waveguide feeding structure. The common ground plane of the linear array has an optimum trapezoidal slot array to reduce the mutual coupling without increasing the distance between the radiators. The higher gain of about 1 dBi is realized by using the novel common ground structure. The measured return loss, gain, and axial ratio of the proposed single radiator, as well as the proposed array antennas, showed a good agreement with the simulated results.
This paper investigates the transient characteristics of grounding systems used in under-ground distribution power cables. Recently, two kinds of grounding system are used for underground distribution cables in Korea. The first one is conventional multi-point grounding system, the other is newly proposed non-bundled common grounding system. The non-bundled common grounding system has an advantage the decreasing the power loss due to decrease of the shield circulation current. In this paper, the lightning overvoltage induced in neutral wire (in case of non-bundled common grounding system, overvoltage between opened neural wires and grounding in each phase) of these two kinds of grounding systems are estimated and compared by field tests and EMTP simulations. The EMTP simulation methods are firstly verified by comparison of measurement and simulation. Finally, the insulation level against lightning is expected by EMTP simulation results using verified model.
All the power generating station require dc auxiliary power systems to operate those dc components that must be available if a loss of ac power occur. Some examples of such components are auxiliary motors, circuit breakers, relays and solenoids. The dc source may be one common battery for both power and control or two separate batteries; one for power and another for control. Typically, a dc auxiliary power system is designed as an ungrounded system, instead of grounded system, so that a low-resistance ground fault on one of its two polarities will not affect the operation of the system, thus increasing system reliability and continuity of service. A ground detector should provide a high polarity-to-ground resistance so that a single ground fault occurring on the system will not affect the operation of that system. Sensitive relays have been known to energize momentarily while the cable and capacitive charge to ground shifts[1]. A power station had experienced this kind of incident and performed root cause analysis based on PC based simulation program known as PSpice. This simulation showed adapted relays on the system energize momentarily and design criteria on this relay should be corrected.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.