• Title/Summary/Keyword: Commercial high-speed train

Search Result 81, Processing Time 0.026 seconds

Construction of Torque Measurement System for High Speed Railway (고속열차의 동력전달축 부하측정 시스템 구축 방안)

  • Kim, Sang-Soo;Kim, Young-Kuk;Kim, Ki-Hwan;Han, Young-Jae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.780-785
    • /
    • 2007
  • Korean Train Express (KTX) has opened to commercial traffic since 2004 at maximum speed 300km/h, and Korea High-speed Railway (HSR-350x) was developed by Korean government, several institutes, and related companies. HSR-350x is now being investigated its performance and tested at the high speed line. In 2004 December, HSR-350x was run over 350km/h and proved its running performance. These high speed railways have 12 motors to transfer the traction effort or the braking force. In this paper, authors propose the construction the measurement system for monitoring the force transferred to the train from the motor. The system is installed to the tripod shaft which is located between the reduction gears and it measures the mechanical load directly.

  • PDF

Reliability Target and Assessment of a Prototype High-Speed Train (시제고속열차의 신뢰도 목표 설정 및 평가 방안)

  • Park, Choon-Soo;Choi, Sung-Hoon;Lee, Tae-Hyung;Kim, Ki-Whan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1-6
    • /
    • 2007
  • A train is subject to a series of reliability-related tasks through its entire life cycle. Among them the reliability demonstration is required for commercial trains and the test is performed during the commissioning period or the early stage of the commercial operation. On the other hands various test are carried out for prototype trains and hence their operational condition is quit different from that of the commercial trains. One should take account of these differences when reliability assessment is needed for the prototype trains. This paper presents a procedure and an analysis method to evaluate reliability of a prototype train. Reliability data have been obtained through test runs of the HSR-350x and operational conditions for the KTX and HSR-350x have been analyzed to compare the reliability targets of the prototype train.

  • PDF

Korea High Speed Train Design - focused on aerodynamic optimal form design development (한국형 고속전철 디자인 -공기역학적 최적형상 디자인개발을 중심으로-)

  • 이병종
    • Archives of design research
    • /
    • v.17 no.3
    • /
    • pp.123-132
    • /
    • 2004
  • This paper shows a study on the "Korean High Speed Train Design" method, its design process and the result in the form of aerodynamic optimal exterior design development of a prototype test train(HSR 350${\times}$). It was developed from 1996 until 2002, six years long in R '||'&'||' D project titled "Development of High Speed Railway Technology" The end result of the project is a prototype test train, which has two power cars, two motorized trailers and three trailers, had been tested successfully in the year 2003 to the highest speed limit 380km/h on high speed line. The improved conceptual design work of a new commercial train and next generation's train is also performed for future needs.uture needs.

  • PDF

A study on the headlight design for high speed train (고속전철용 전조등 설계에 관한 연구)

  • Choi Kweon-hee;Jeon Sung-hyun;Jung Byung-ho;Lee Byung-seok;Kim Kuk-jin
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1398-1401
    • /
    • 2004
  • In case the problem came into the headlight composed of a bulb, lens and reflecting mirror, it has a sealed-beam type which must exchange all and semi-sealed beam type which can exchange only bulb. The headlight of train must be used at the time of going into tunnel and atmospheric phenomena such as heavy snow, rain and foggy as a rule, also it can be used with whistle blow when the dangerous article appears. In this study, general technical specification to improve headlight of the KTX and G7 high speed train is described throughout investigation technique of the industrialized country and headlight specification of train which is on commercial service.

  • PDF

Reformation of Korea Rail Network in $21^{st}$ century (21세기 한국철도망 정비방향)

  • Sin Chong-Seo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1624-1626
    • /
    • 2004
  • On the 105th year of the Korean Railroad, Korea railroad is at the advent of the high speed operation with an commercial operation of KTX(Korea Train eXpress), the fifth high speed line in the world, between Pusan and Seoul at the speed of 300km/hr. In order to enhance nation competitiveness in $21^{st}$ century, Korea Railroad is faced with a task of improving the railroad network in the areas of new line constructions, betterment of existing rail lines, increasing the operation speed and transportation capacity and modernization of rolling stock fleet.

  • PDF

Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service (틸팅열차 상용화대비 기존선 인프라시스템의 효율적 유지보수체계 검토)

  • Yoo, Keun-Su;Lee, Chang-Hun;An, Gang-Yell;Kim, Joung-Tea
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.79-87
    • /
    • 2008
  • The major objective of this study is to investigate the effective maintenance system for the infrastructure on the conventional lines in which the tilting train runs. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks was developed. Besides, the efficiency prediction and the linear fitness of the existing conventional lines for a tiling train service were examined on the preceding study which was the development of track system innovation technology for speed-up of them. So, in this paper we propose the more effective maintenance method than the existing it in order to securing the high reliability and safety classified by the infrastructure, in analyzing foreign materials and the maintenance as well as the inspection cycle concerning domestic infrastructures of the track and the catenary etc. on the railway. And we look forward to playing a decisive role as reference material for the effective improvement of the existing maintenance about the infra on the conventional lines for the commercial service of the tilting train.

  • PDF

Thermal effect on dynamic performance of high-speed maglev train/guideway system

  • Zhang, Long;Huang, JingYu
    • Structural Engineering and Mechanics
    • /
    • v.68 no.4
    • /
    • pp.459-473
    • /
    • 2018
  • Temperature fields and temperature deformations induced by time-varying solar radiation, shadow, and heat exchange are of great importance for the ride safety and quality of the maglev system. Accurate evaluations of their effects on the dynamic performances are necessary to avoid unexpected loss of service performance. This paper presents a numerical approach to determine temperature effects on the maglev train/guideway interaction system. Heat flux density and heat transfer coefficient of different components of a 25 m simply supported concrete guideway on Shanghai High-speed Maglev Commercial Operation Line is calculated, and an appropriate section mesh is used to consider the time-varying shadow on guideway surfaces. Based on the heat-stress coupled technology, temperature distributions and deformation fields of the guideway are then computed via Finite Element method. Combining guideway irregularities and thermal deformations as the external excitations, a numerical maglev train/guideway interaction model is proposed to analyze the temperature effect. The responses comparison including and excluding temperature effect indicates that the temperature deformation plays an important role in amplifying the response of a running maglev, and the parameter analysis results suggest that climatic and environmental factors significantly affect the temperature effects on the coupled maglev system.

Safety evaluation of dynamic behavior of Korean tilting train (TTX차량의 동역학적 거동의 안정성 평가)

  • Yoon, Ji-Won;Kim, Nam-Po;Kim, Young-Guk;Kim, Seog-Won;Park, Tae-Won
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.194-200
    • /
    • 2007
  • The tilting train is able to tilt its body towards the center of the turning radius, preventing roll-over of the train as it runs on a curved rail at high-speed. This train, widely accepted for commercial purpose internationally is very beneficial in that the operating time is shortened without much capital investment to the infrastructure where there are many curved rails. Over several years, the Korea Railroad Research Institute(KRRI) has developed such a train. In this paper, the safety of the Korean tilting train express(TTX) is investigated using a dynamic simulation model. Since, proper safety standards have not been established for the TTX, those for the Korean train express(KTX) is employed instead to analyze the safety and ride comfort of the TTX. This study will prove useful in predicting the behavior of the TTX and ride comfort, and conforming that designed TTX measures up to the safety standards. It would be useful to recommend proper normal operating speed and determine the maximum safety speed, according to the result. Furthermore, it would be possible to provide basic reference data when analyzing the dynamic effect of the catenary system and the fatigue of the bogie.

  • PDF

Reliability Management Process for the Development of a Prototype Train (시제열차 개발에서의 신뢰성 관리 체계)

  • Choi, Sung-Hoon;Park, Choon-Soo;Lee, Tae-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.206-210
    • /
    • 2007
  • IEC 62278 presents a process to implement a consistent approach to the management of reliability for railway applications. A reliability program has to be established at the outset of a project in order to manage reliability activities effectively through the life cycle. The first step of the reliability program is to evaluate reliability requirements and targets based on the system specifications. The system specifications are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with a process to manage reliability activities for the development of a protype train based on the experiences obtained from the development of the Korea High-Speed Train: Hanvit-350.

  • PDF

Reliability Management Process for the Development of a Prototype Train (시제열차 개발에서의 신뢰성 관리 체계)

  • Choi, Sung-Hoon;Park, Choon-Soo;Lee, Tae-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1083-1088
    • /
    • 2008
  • The first task for the development of a train system is to define the system and to determine its requirements. Reliability target is one of the requirements defined in the system requirements. In railway applications it is advised to follow the procedures given in IEC 62278 to fulfill reliability requirements. The reliability requirements are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with the reliability management and assessment plan carried out for the on-going "Next generation high-speed train development project".

  • PDF