• Title/Summary/Keyword: Cold-Standby

Search Result 20, Processing Time 0.024 seconds

Design Considerations on the Standby Cooling System for the integrity of the CNS-IPA

  • Choi, Jungwoon;Kim, Young-ki
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2015.08a
    • /
    • pp.104-104
    • /
    • 2015
  • Due to the demand of the cold neutron flux in the neutron science and beam utilization technology, the cold neutron source (CNS) has been constructed and operating in the nuclear research reactor all over the world. The majority of the heat load removal scheme in the CNS is two-phase thermosiphon using the liquid hydrogen as a moderator. The CNS moderates thermal neutrons through a cryogenic moderator, liquid hydrogen, into cold neutrons with the generation of the nuclear heat load. The liquid hydrogen in a moderator cell is evaporated for the removal of the generated heat load from the neutron moderation and flows upward into a heat exchanger, where the hydrogen gas is liquefied by the cryogenic helium gas supplied from a helium refrigeration system. The liquefied hydrogen flows down to the moderator cell. To keep the required liquid hydrogen stable in the moderator cell, the CNS consists of an in-pool assembly (IPA) connected with the hydrogen system to handle the required hydrogen gas, the vacuum system to create the thermal insulation, and the helium refrigeration system to provide the cooling capacity. If one of systems is running out of order, the operating research reactor shall be tripped because the integrity of the CNS-IPA is not secured under the full power operation of the reactor. To prevent unscheduled reactor shutdown during a long time because the research reactor has been operating with the multi-purposes, the introduction of the standby cooling system (STS) can be a solution. In this presentation, the design considerations are considered how to design the STS satisfied with the following objectives: (a) to keep the moderator cell less than 350 K during the full power operation of the reactor under loss of the vacuum, loss of the cooling power, loss of common electrical power, or loss of instrument air cases; (b) to circulate smoothly helium gas in the STS circulation loop; (c) to re-start-up the reactor within 1 hour after its trip to avoid the Xenon build-up because more than certain concentration of Xenon makes that the reactor cannot start-up again; (d) to minimize the possibility of the hydrogen-oxygen reaction in the hydrogen boundary.

  • PDF

Evaluation of Transient Natural Circulation Behavior during Accident in Low Power /Shutdown Condition of YGN Units 3/4

  • Bang, Young-Seok;Kim, Kap;Seul, Kwang-Won;Kim, Hho-Jung
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.458-463
    • /
    • 1997
  • A transient natural circulation behavior during a LOCA at hot-standby operation is evaluated for YGN Units 3/4. The plant initial condition is determined within the EOP limitation as suitable to hot-standby mode and the transient scenario is prepared as relevant to evaluation of transient natural circulation. A 0.4% cold leg break with loss of off-site power is calculated with RELAP5/MOD3.2, whose predictability has been verified for SBLOCA natural circulation test, S-NC-8B. Through one hour transient analysis, it is found that the plant has its own decay heat removal capability by natural circulation following a LOCA, at hot-standby mode. Additional calculation is performed to investigate an effect of HPSI flow on natural circulation.

  • PDF

Redundant Architectural Design of Hydraulic Control System for Reliability Improvement of Underwater Construction Robot (수중건설로봇의 유압 제어 안정성 향상을 위한 이중화 설계)

  • Lee, Jung-Woo;Park, Jeong-Woo;Suh, Jin-Ho;Choi, Young-Ho
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.5
    • /
    • pp.380-385
    • /
    • 2015
  • In the development of an underwater construction robot, the reliability of the operating system is the most important issue because of its huge maintenance cost, especially in a deep sea application. In this paper, we propose a new redundant architectural design for the hydraulic control system of an underwater construction robot. The proposed architecture consists of dual independent modular redundancy management systems linked with a commercial profibus network. A cold standby redundancy management system consisting of a preprocessing switch circuit is applied to the signal network, and a hot standby redundancy management system is adapted to utilize two main controllers.

A Preventive Replacement Model for Standby Systems (대기구조를 갖는 시스템의 예방 교체 모형)

  • Lee, Hyo-Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.555-570
    • /
    • 1995
  • We consider a preventive replacement policy for a cold-standby system with N components, in which only one component is in operation at a time. If the component in operation fails, a standby component is immediately switched into operation. If all components fail, the system fails. The system is inspected at random poins in time to determine whether it is to be replaced or not. If the number of failed components at the time of inspection exceeds a threshold value r, the system is replaced. Otherwise the decision is put off until the next inspection point arrives. Under the cost structure which includes a replacement cost, a system down-time cost and a holding cost of the components, we develop an efficient procedure to find the optimal control values N and r, which minimize the expected cost per unit time.

  • PDF

Studies on a standby repairable system with two types of failure

  • El-Damcese, M.A.;Shama, M.S.
    • International Journal of Reliability and Applications
    • /
    • v.16 no.2
    • /
    • pp.99-111
    • /
    • 2015
  • In this paper, we study the reliability analysis of a repairable system with two types of failure in which switching failures and reboot delay are considered. Let units in this system be cold standby, and failure rate and repair rate of [type1, type2] components be exponentially distributed. The expressions of reliability characteristics - such as the system reliability and the mean time to system failure MTTF - are derived. We use several cases to graphically analyze the effect of various system parameters on the system reliability and MTTF. We also perform a sensitivity analysis of the reliability characteristics with changes in specific values of the system's parameters.

A Reliability Redundancy Optimization Problem with Continuous Time Absorbing Markov Chain (연속시간 흡수 마코프체인을 활용한 신뢰도 중복 최적화 문제)

  • Kim, Gak-Gyu;Baek, Seungwon;Yoon, Bong-Kyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.4
    • /
    • pp.290-297
    • /
    • 2013
  • The increasing level of operation in high-tech industry is likely to require ever more complex structure in reliability problem. Furthermore, system failures are more significant on society as a whole than ever before. Reliability redundancy optimization problem (RROP) plays a important role in the designing and analyzing the complex system. RROP involves selection of components with multiple choices and redundancy levels for maximizing system reliability with constraints such as cost, weight, etc. Meanwhile, previous works on RROP dealt with system with perfect failure detection, which gave at most a good solution. However, we studied RROP with imperfect failure detection and switching. Using absorbing Markov Chain, we present not a good solution but the optimal one. In this study, the optimal system configuration is designed with warm and cold-standby redundancy for k-out-of-n system in terms of MTTF that is one of the performance measures of reliability.

A Development of Modular Monitoring System for Wind Turbine Test Site (풍력 실증단지를 위한 분산 형 모니터링 시스템 개발)

  • Lee Jeong Wan;Yoo Neung Soo;Nam Yoon Su;Cho Byung Ha
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.9-12
    • /
    • 2005
  • In this paper. we offer a new monitoring system that controls all of the windfar. it can also apply use general wind turbine systems and real meteorological tower. We propose a hierarchical releiable monitoring system connected by wireless communication channels between monitoring host computer and modular slave measuring subsystems. Our system has two hierarchical subsystems: slave measuring systems, and supervisory host computer. We design and implement that the slave measuring subsystems is placed in meteorological tower and wind turbines, and the supervisory host computer in safety zone, The micro-controller in slave measuring system is duplicated using cold-standby method for reliability. The host computer and slave system constructs a feedback system, with wireless communication channel between them. For monitoring and command function, the supervisory computer is implemented with a Personal Computer using graphic user interface. Consequently. we can get a reliable but economic system.

  • PDF

A Method of Dependability Improvement for an Intrusion Tolerance System (침입감내시스템의 신인도 향상 방안)

  • Park, Bum-Joo;Park, Kie-Jin;Kim, Sung-Soo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.971-974
    • /
    • 2005
  • 네트워크 기반 컴퓨터 시스템이 내/외부 침입에 의해 시스템 일부가 손상(Partially Compromised) 되더라도, 최소한의 필수 서비스를 지속적으로 제공할 수 있게 해주는 침입감내시스템(Intrusion Tolerance System)의 설계에 요구되는 요소 기술 중의 하나는 정량적 신인도(Dependability) 분석이라 할 수 있다. 특히, 신인도중에서 생존성(Survivability)은 침임감내의 개념을 일관되게 반영하고 있는 척도(Measure)이므로 침입감내시스템의 설계시 중요한 요소라 할 수 있다. 본 논문에서는 자가치유 (Self-healing) 메커니즘을 활용하여 주서버와 보조서버가 각 1 대인 Cold-standby 방식의 침입감내시스템의 상태천이(State Transition)를 표현한 후, 시스템의 가용도 및 생존성을 정의하였다. 또한, 시뮬레이션을 통해 두가지 취약성 공격 사례에 대한 생존성 변화추이를 분석함으로써 신인도 향상 방안을 기술하였다.

  • PDF

Loss of Coolant Accident Analysis During Shutdown Operation of YGN Units 3/4

  • Bang, Young-Seok;Kim, Kap;Seul, Kwang-Won;Kim, Hho-Jung
    • Nuclear Engineering and Technology
    • /
    • v.31 no.1
    • /
    • pp.17-28
    • /
    • 1999
  • A thermal-hydraulic analysis is conducted on the loss-of-coolant-accident (LOCA) during shutdown operation of YGN Units 3/4. Based on the review of plant-specific characteristics of YGN Units 3/4 in design and operation, a set of analysis cases is determined, and predicted by the RELAP5/MOD3.2 code during LOCA in the hot-standby mode. The evaluated thermal-hydraulic phenomena are blowdown, break flow, inventory distribution, natural circulation, and core thermal response. The difference in thermal-hydraulic behavior of LOCA at shutolown condition from that of LOCA at full power is identified as depressurization rate, the delay in peak natural circulation timing and the loop seal clearing (LSC) timing. In addition, the effect of high pressure safety injection (HPSI) on plant response is also evaluated. The break spectrum analysis shows that the critical break size can be between 1% to 2% of cold leg area, and that the available operator action time for the Sl actuation and the margin in the peak clad temperature (PCT) could be reduced when considering uncertainties of the present RELAP5 calculation.

  • PDF

A Study on the Effective Maintenance Method of the Stair Passage Leading Light installed In the Shopping Building (상가건물 계단통로유도등의 유지관리 효율화 방안에 관한 연구)

  • Lee, Young-Sam
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • This study was conducted by survey and inspection of stair passage leading lights in shopping buildings which are more than 5 stories and have an underground parking lot located at Pyeongtaek-si and Seongnam-si. Number of shopping building for this study is 30 and of stair passage leading light inspected by two lights in each shopping building is 60. The result of this study is that the type of installed leading lights is LED(77%), and 60% of leading lights has problem such as no cleaning, scratch and discoloration, etc. The height of installed leading lights meets the fire law which is less than 1m from the floor. Visible condition of leading lights is good except some leading lights which have a little visible problem due to banner advertisement. 37% of standby power has flickered and went out. 93% of total leading lights meets the fire law which is more than 1lux from 0.5m distance, but cold cathode fluorescent lamps(CCFLs) have the problem which not meets proper brightness level based on fire law. In additional measurement result, zero lux of leading lights is 32%(from 1m distance), 68%(from 1.5m distance) and 98%(from 2m distance). Leading light is very important facility because it is eyes and guide when emergency. Therefore, proper fire facility operating function inspection and total detailed inspection are important to keep the good condition of leading light except simple visual check, and also improvement in law system of type approval, fire construction inspection and illumination level will be needed.