Transactions on Electrical and Electronic Materials
/
v.1
no.1
/
pp.6-11
/
2000
The hydrogen plasma treatment of silicon wafers in the reactive ion-etching mode was studied for the application to silicon-on-insulator wafers which were prepared using the wafer bonding technique. The chemical reactions of hydrogen plasma with surface were used for both surface activation and removal of surface contaminants. As a result of exposure of silicon wafers to the plasma, an active oxide layer was found on the surface. This layer was rendered hydrophilic. The surface roughness and morphology were examined as functions of the plasma exposing time and power. In addition, the surface became smoother with the shorter plasma exposing time and power. The value of initial surface energy estimated by the crack propagation method was 506 mJ/㎡, which was up to about three times higher as compared to the case of conventional direct using the wet RCA cleaning method.
A novel multi-staged waste pyrolysis & gasification system of pilot scale (~1 ton/day) is designed and constructed in Korea Institute of Industrial Technology. The pyrolysis & gasification system is composed of pyrolysis & gasification system, syngas reformer, syngas cleaning system, gas engine power generation system and co-combustion system. For each unit process, experimental approaches have been conducted to find optimal design and operating conditions. As a result, We can produce syngas with a calorific value of ~4000 kcal/$Nm^3$ and cold gas efficiency of the system is more than 55 % in case of waste plastic and oxygen as a gasifying agent.
A novel bumping material, which is composed of a resin and Sn3Ag0.5Cu (SAC305) solder power, has been developed for the maskless solder-on-pad technology of the fine-pitch flip-chip bonding. The functions of the resin are carrying solder powder and deoxidizing the oxide layer on the solder power for the bumping on the pad on the substrate. At the same time, it was designed to have minimal chemical reactions within the resin so that the cleaning process after the bumping on the pad can be achieved. With this material, the solder bump array was successfully formed with pitch of 150 ${\mu}m$ in one direction.
Jang, Eun Su;Park, Sang Min;Oh, Chang-Yeol;Lee, Byoung Kuk
Proceedings of the KIPE Conference
/
2016.11a
/
pp.37-38
/
2016
본 논문에서는 유도가열방식 세정장치의 티타늄 용기 특성을 분석하고 전력변환장치를 설계한다. 코일에 흐를 전류를 계산하기 위한 용량 산정은 기체의 온도 변화량 및 용기 가열 시간을 고려하여 증기 가열에 필요한 열량을 수학적으로 분석하고 설계한 전력변환장치를 시뮬레이션을 통해 검증한다.
Two major goals for chemical cleaning on the secondary side of nuclear steam generators are to remove sludge effectively and to minimize corrosion of base metals. In this work, electrochemical and sludge dissolution behaviors have been investigated in order to find out which parameters are critical and important during a copper removal process for chemical cleaning and to evaluate safety aspects and effectiveness of two major copper removal processes developed commercially in foreign countries. Hydrogen peroxide is vert effective for the process to use EDTA, NH$_4$OH and EDA at 38$^{\circ}C$ to control the potential of copper in a potential range sood for copper sludge removal. Corrosion rates for carbon steel SA 285 Gr.C and Alloy 600 are very small during this process if it is controlled properly. However, the corrosion rate of SA 285 Gr.C will be increased greatly if its corrosion potential is maintained below -450mV. The process to use EDA and ammonium carbonate is effective at 6$0^{\circ}C$ to dissolve copper sludge if the corrosion potential of copper can be controlled above -200mV. However, it is very difficult to raise the corrosion potential of copper to this range by air blowing and stirring.
Journal of Advanced Marine Engineering and Technology
/
v.41
no.3
/
pp.216-221
/
2017
Diesel engines have the highest brake thermal efficiency among internal combustion engines. Therefore, they are utilized in medium and large transportation vehicles requiring large amounts of power such as heavy trucks, ships, power generation systems, etc. However, diesel engines have a disadvantage of generating large quantities of nitrogen oxides during the combustion process. Therefore, the authors tried to reduce the amount of nitrogen oxides in marine diesel engines using a wet-type exhaust gas cleaning system utilizing the undivided electrolyzed seawater method. In this method, electrolyzed seawater in injected into the harmful gas discharge from the diesel engine using real seawater. The authors investigated the reduction of NO and NOx from the pH value, available chlorine concentration, and the temperature of electrolyzed seawater. The results of this experiment indicated that when the electrolyzed seawater is acidic, the NO oxidation rate in the oxidation tower is higher than that when the electrolyzed seawater has a neutral pH. Likewise, the NO oxidation rate increased with the increase in concentration of chlorine. Further, it was confirmed that the electrolyzed seawater temperature had no effect on the NO oxidation rate. Thus, the NOx exhaust emission value produced by the diesel engine was reduced by means of electrolyzed seawater treatment.
Lee Sang-Ho;Lee Seung-Ho;Kim Kyu-Chae;Kwon Tae-Young;Park Jin-Goo;Bae So-Ik;Lee Gun-Ho;Kim In-Jung
Journal of the Semiconductor & Display Technology
/
v.4
no.4
s.13
/
pp.19-26
/
2005
The process optimization of ozone concentration and half life time was investigated in ultra pure water and alkaline solutions for the wet cleaning of silicon wafer surface at room temperature. In the ultra pure water,. the maximum concentration (35 ppm) of ozone was measured at oxygen flow rate of 3 liters/min and ozone generator power over 60%. The half life time of ozone increased at lower power of ozone generator. Additive gases such as $N_2$ and $CO_2$ were added to increase the concentration and half life time of ozone. Although the maximum ozone concentration was higher with the addition of $N_2$ gas, a longer half life time was observed with the addition of $CO_2$. When $NH_4OH$ of 0.05 or 0.10 vol% was added in DI water, the pH of the solution was around 10. The addition of ozone resulted in the half life time less than 1 min. In order to maintain high pH and ozone concentration, ozone was continuously supplied in 0.05 vol% ammonia solutions. 3 ppm of ozone was dissolved in ammonia solutions. The static contact angle of silicon wafer surface became hydrophilic. The particle removal was possible alkaline ozone solutions. The organic contamination can be removed by ozonated ultra pure water and then alkaline solution containing ozone can remove the particles on silicon surface at room temperature.
'Silla Monument Stone in Jungseong-ri, Pohang' was discovered in Pohang City, Gyeongsangbuk Province of Korea in 2009. The monument stone with irregular shape has dimensions of maximum height of 105cm, width of 47.6~49.6cm, thickness of 13.8~14.7cm and weight of 115kg. The results of monument stone was found to be granitite. Conservation treatment procedure was carried out in the order of production of Weathering map, cleaning of surface pollutants, consolidation using ethyl silicate. Black pollutant(crust) that covered more than 60% of the surface was analyzed first in order to remove the pollutants on the surface of the monumental stone by cleaning of surface pollutants using laser. The purpose on analysis was not only to verify the pollutants on the stone but also to carry out preliminary cleaning by securing rocks with same pollutant as the monumental stone. As the results of analysis using p-XRF(PMI. INNOV-X, USA) on the site, high level of Mn and Fe were detected, and the analysis of small section that had been fallen off with SEM/EDX for the purpose of quantitative analysis also detected high level of Mn. The Similar contaminants on Stone secured in the manner described above were made into 10 samples ($5cm{\times}5cm$) and was subjected to preliminary cleaning by Nd-YAG Laser(Laser&Physics, Korea). The results of surface observation through portable microscope during cleaning revealed that the power of 460mJ, wavelength of 1064nm and irradiation frequency of 1,800~2,300 per $25cm^2$ were most effective. Evaluation on the preservative treatment was made through confirmation of the extent of removal through color-difference meter measurement and component analysis prior to and following removal of the pollutants. As the result of color-difference meter measurement increase in the brightness was evidenced by the increase in the brightness ($L^*$)value from 33 to 49, and it was possible to ascertain the reduction in the pollutants as the content of Mn was reduced by about 80% from $50,000{\pm}5,000ppm$ to $10,000{\pm}2,000pmm$ from the result of component analysis.
Effects of remote hydrogen plasma cleaning process parameters on the removal of Fe impurities on Si surfaces and the Fe removal mechanism were investigated. Fe removal efficiency is enhanced with decreasing the plasma exposure time and increasing the rf-power. The optimum plasma exposure time and rf-power are 1 min and 100W. respectively, in the range below 10 min and 100W. Fe removal efficiency is better under lower pressures than higher pressures, and the optimum $\textrm{H}_2$ flow rate was found to be 20 and 60sccm, respectively, under a low and a high pressure. The post-RHP(remote hydrogen plasma) annealing enhanced metallic contaminants removal efficiency, and the highest efficiency was achieved at $600^{\circ}C$. According to the AFM analysis results Si surface roughness was improved by 30-50%, which seems to be due to the removal of particles by the plasma cleaning. Also. Fe impurities removal mechanisms by remote hydrogen plasma are discussed.
International journal of advanced smart convergence
/
v.4
no.1
/
pp.104-113
/
2015
This paper focuses on a temperature effects on a PV panel which has been installed in Thailand. The main objective is cleaning PV panels and reduce temperature of PV panel by water injects from waterway and experimental results of PV power what it is difference. This project is designed by PLC control system which water injects and control PV temperature, In addition, this project consists of hardware and software such as water pump, water injection and PLC control has been automatically and it can be control system manually. The automatic control system is working when PV temperature rises up over 45 degree Celsius after that the pumping machine would inject water to the surface of PV panels and it must be stop when the PV panel temperature comes down less than 45 degree Celsius. The result of actual experimental found that the control system has been done correctly under specify condition. The experimental has been shown electrical data before and after water injects on PV system found that the electrical power a bit increases and The energy has been taken from PV panel less than energy consumption equipment of control system which taken to operate the water injecting system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.