REVOLUTIONS OF CONSTRUCTION ORGANIZATIONS TOWARDS GREEN BUILDING PRJECTS

  • Po-Han Chen;Yuan-Yuan Li
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.558-565
    • /
    • 2009
  • In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.

A STUDY ON THE OPTIMAZATION OF CONSTRUCTION MANAGEMENT BY USING A DESIGN STRUCTURE MATRIX

  • Nobuyuki Suzuki;Aketo Suzuki
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.383-388
    • /
    • 2005
  • In the construction industry, complex works are carried out with significant resources under non-linear circumstances where clear concepts of project management could be of benefit to all parties and personnel involved. In this paper, we define the optimum project management configuration for construction management by using DSM (Design Structure Matrix). Furthermore DSM can be visualized as a network model, and then Graph Theory provides us the numerical results.

  • PDF

LEAN CONSTRUCTION MEANS TO PROMOTE GOOD- AND ERADICATE BAD VARIATION

  • Iris D. Tommelein
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.51-59
    • /
    • 2009
  • Lean construction researchers and practitioners have established a new paradigm for managing construction projects. This paradigm stems from insights gained by viewing project delivery as one kind of production and, inspired by the success of the Toyota Production System, leveraging Toyota's 'lean thinking' in the context of such one-of production. Premises of lean construction are that (1) production systems are riddled with variation, (2) variation can be good or bad, but most of it is bad, (3) most of this variation-good or bad-is self-inflicted; consequently 'lean' passionately promotes good- and relentlessly eradicates bad variation. This paper surveys a few of many lean construction means to manage variation. Lean thinking encompasses a lot more than thinking about variation, but that is the lens used here through which construction project management is viewed. Pairing these premises with lean variation-management tools may help readers broaden the insights they can gain from reading the lean construction literature.

  • PDF

A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage (사업 초기단계에서 공동주택 토목공사비의 예측에 관한 연구)

  • Ha, Kyu-Soo;Lee, Jin-Kyoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4284-4293
    • /
    • 2012
  • At the early construction project stage, the most important task is to estimate planned construction costs analyzed with detailed information. Therefore, in this study, Apartment Housing Projects at the Early Stage of Civil Construction Cost of the reasonable and accurate predictions of the Regression analysis to 170 of actual Construction Cost, and dependent variable regression to Civil Construction Cost, location based national land area based on a combination of private land, union land, public land to the use of predictive models by various analyses of the ease and accuracy. As a result, Civil Construction Cost of Apartment Housing Projects by the regression formula for the error rate estimates in national land predictive model 15.59%, private land predictive model 17.53%, union land predictive model 21.86%, public land predictive model 13.08%.

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.