CASE STUDY: CONSTRUCTION LITIGATION FOR THE U.S. NAVAL FACILITIES ENGINEERING COMMAND, 1995-2004

  • Lilin Liang;G. Edward Gibson Jr.
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.693-698
    • /
    • 2005
  • Evaluation of construction claims history can provide insights to improvement opportunities in a capital project portfolio. This study analyzed construction litigation claims extracted from the U.S. Court of Federal Claims (COFC) history involving the U.S. Naval Facilities Engineering Command (NAVFAC) from 1995-2004. Twenty-four total cases were examined over this period. Both "primary" causes and "root" causes were identified and compared to 666 litigation cases reviewed by the Armed Services Board of Contract Appeals (ASBCA). Based on the analysis, strategies for resolving future disputes are recommend using a 'hybrid' process prior to litigation.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

PROJECT COMPLEXITY AS A MODERATOR OF PERFORMANCE BIAS TOWARDS OVERRUN

  • Li liu;Andrew Nguyen;James Arvanitakis
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.38-45
    • /
    • 2011
  • Studies have shown that infrastructure projects have continued to experience significant delays and cost overrun over an extended period of time and no evidence of learning ever have happened [1] [2]. Various causes contribute to the bias towards overrun [3]. This study contributes to literature by developing and subsequently validating a set of hypothesized relationships between project complexity and project performance. The results show that project complexity is associated with both the magnitude and variance of overrun. Further, the extent and magnitude of the positive bias towards overrun are moderated by project complexity.

  • PDF

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

INTEGRATION OF SSM AND IDEF TECHNIQUES FOR ANALYZING DOCUMENT MANAGEMENT PROCESSES

  • Vachara Peansupap;Udtaporn Theingkuen
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.725-731
    • /
    • 2009
  • Construction documents are recognized as an essential component for making a decision and supporting on construction processes. In construction, the management of project document is a complex process due to different factors such as document types, stakeholder involvement, document flow, and document flow processes. Therefore, inappropriate management of project documents can cause several impacts on construction work processes such as delay or poor quality of work. Several information and communication technologies (ICT) were proposed to overcome problems concerning document management practice in construction projects. However, the adoption of ICT may have some limitation on the compatibility of specific document workflow. Lack of understanding on designing document system may cause many problems during the use and implementation phase. Thus, this paper proposes the framework that integrates Soft System Methodology (SSM) concept and Integrated Definition Modeling Technique (IDEF) for analyzing document management system in construction project. Research methodology is classified as the case study. Five main construction building projects are selected as case studies. The qualitative data related to problems and processes are collected by interviewing construction project participants such as main contractors, owners, consultants, and designers. The findings from case study show the benefits of using SSM and IDEF. The use of SSM can help identify the problems in managing construction document in rich picture view whereas IDEF can illustrate the document flow in construction project in details. In addition, the idea of integrating these two concepts can be used to identify the root causes of process problems at the information level. As the results, this idea can be applied to analyze and design web-based document management system in the future.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

Conflicting Factors in Korean Construction Industry

  • Acharya Nirmal K.;Lee, Young-Dai;Kim, Jung-Ki
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.171-180
    • /
    • 2006
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results show that ANN models give significantly improved performance compared to traditional statistical models.

MEASURING AND COMPARING PROFIT PATTERNS OF TRADITIONAL CONSTRUCTION COMPANIES EXTENDING TO HIGH-TECH CONSTRUCTION

  • Jieh-Haur Chen;Chung-Fah Huang;S. C. Hsu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.360-365
    • /
    • 2005
  • The need of constructing high-tech facilities is one of the important issues concerning the competitiveness by the high-tech companies. It, simultaneously, offers a magnificent opportunity for construction participants. Nevertheless, the high-tech construction is experience-based, resulting in little related construction knowledge that has been statistically analyzed and documented. This study measures and confers with the profit patterns causing the disparity between the traditional and high-tech construction. The database was the result of collecting detailed information of 65 construction projects from eight construction companies, including detailed records of over 20 main construction operations in each project. All of these were performed during the recent 10 years and encompassed in the project types of the high-tech construction, residential building, and commercial building. Rendering suggestions regarding profit management and expecting to economize cost of learning from inexperience while extending to the high-tech construction were both presented.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF