• 제목/요약/키워드: Civil construction

검색결과 8,245건 처리시간 0.031초

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A STUDY OF INVOICELESS PROCESS USING RFID IN CONSTRUCTION FIELD

  • Tai Sik Lee ;Kyoung Soon Park ;Ja Kyoung Koo ;Young Hyun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1250-1255
    • /
    • 2005
  • Application of radio frequency Identification (RFID) technology in construction industry is not that progressive compared with other industries, because of it's high price experimental research. This research focus on potential application of RFID which eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. This paper suggest an invoiceless system using RFID technology, Process productivity and efficiency for material management is observed through WebCYCLONE and is compared with other processes.

  • PDF

Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.420-424
    • /
    • 2015
  • The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

  • PDF

The Research of Beach Deformation after Construction of the Jetties

  • Park, Sang-Kil;Han, Chong-Soo;Roh, Tae-Young;Park, O-Young;Ahn, Ik-Seong;Lee, Ji-Hun
    • International Journal of Ocean System Engineering
    • /
    • 제1권4호
    • /
    • pp.185-191
    • /
    • 2011
  • This research was described the prevention of coastal topographical change and sediment diffusive concentration incoming from small estuary after construction jetties. This structure is constructed to decrease sediment deposition incoming from the upstream river due to the urbanization and industrial development and to minimize effects on the coastal ecosystem. The physical modeling and numerical modeling for waves were conducted to analyze the configuration of Imrang sand beach deformation without and with construction of jetty. The specification of the installed jetty, which is able to control sedimentation concentration was decided based on the prediction of the Imrang beach area changes by space and time. As a result, the jetties constructed in the estuary retarded the rate of sand sediment, so that the effect area of sand sedimentation was obviously decreased. In addition, the measured field data indicated that the sediment deposition inside of dikes could be controlled and the right side area of jetties could be preserved without sediment deposition.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Competitiveness Benchmarking of Overseas Construction through a SWOT analysis of leading construction firms in Spain and France

  • Han, Jae-Goo;Park, Hwan-Pyo;Jang, Hyoun-Seung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.721-722
    • /
    • 2015
  • The aim of this research is to provide a direction to benchmark advanced construction companies from Spain and France by deriving business strategies through SWOT analysis in order to strengthen overseas expansion and competitiveness of domestic construction companies.

  • PDF

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

고속철도 횡단 강거더 설치공사에서의 BIM 기반 가상건설 장비운영 시뮬레이션의 적용 (BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway)

  • 박준원;이상호;김성훈;원정훈;윤영철
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.76-85
    • /
    • 2018
  • The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.

Worker Safety in Modular Construction: Investigating Accident Trends, Safety Risk Factors, and Potential Role of Smart Technologies

  • Khan, Muhammad;Mccrary, Evan;Nnaji, Chukwuma;Awolusi, Ibukun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2022
  • Modular building is a fast-growing construction method, mainly due to its ability to drastically reduce the amount of time it takes to construct a building and produce higher-quality buildings at a more consistent rate. However, while modular construction is relatively safer than traditional construction methods, workers are still exposed to hazards that lead to injuries and fatalities, and these hazards could be controlled using emerging smart technologies. Currently, limited information is available at the intersection of modular construction, safety risk, and smart safety technologies. This paper aims to investigate what aspects of modular construction are most dangerous for its workers, highlight specific risks in its processes, and propose ways to utilize smart technologies to mitigate these safety risks. Findings from the archival analysis of accident reports in Occupational Safety and Health Administration (OSHA) Fatality and Catastrophe Investigation Summaries indicate that 114 significant injuries were reported between 2002 and 2021, of which 67 were fatalities. About 72% of fatalities occurred during the installation phase, while 57% were caused by crushing and 85% of crash-related incidents were caused by jack failure/slippage. IoT-enabled wearable sensing devices, computer vision, smart safety harness, and Augment and Virtual Reality were identified as potential solutions for mitigating identified safety risks. The present study contributes to knowledge by identifying important safety trends, critical safety risk factors and proposing practical emerging methods for controlling these risks.

  • PDF

A PRACTICAL HUMAN RESOURCE MANAGEMENT PLAN FOR FOREIGN CONSTRUCTION WORKERS

  • Seung-Heon Han;Eui-Jae Jin;Sang-Hyuk Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1216-1222
    • /
    • 2005
  • A shortage of construction field workers has been a serious problem, both in the developed and in the developing countries. As a solution for conquering this problem, these countries import foreign laborers from nearby less-developed countries. While this contributes to lessening the labor deficiency, foreign workers are relatively inefficient in productivity and are often exposed to the cross-cultural risks due to cultural differences, communication difficulties, different work ethics and customs, etc. Despite these facts, construction firms do not well address these issues and are lagged in establishing an appropriate management strategy against it. This paper presents a practical management plan for foreign construction workers through Focus Group Interviews (FGI) and survey investigation. On this basis, this study examines the level of awareness and important managerial aspects of the issue of foreign laborers. Finally, it suggests a cross-cultural and ready-to-use practical human resource management plan for facilitating the foreign worker's productivity.

  • PDF