UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management (토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발)

  • Kim, Changyoon;Youn, Junhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.549-557
    • /
    • 2022
  • Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

Interlocking Earthen Masonry Units for Sustainable Residential Building Construction

  • Lubbering, Noah;Awolusi, Ibukun;Langar, Sandeep;Schultz, Arturo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1024-1031
    • /
    • 2022
  • In addressing the goal for sustainability in the construction industry, the very materials used for construction and the methods utilized to implement said materials must be analyzed. Specifically, some traditional residential construction materials consist of wood, steel, and concrete. Because these materials vary in their levels of sustainability, there is a need to develop and explore new or other materials that can be used for residential construction. The primary purpose of this paper is to provide a review of interlocking earthen masonry units (IEMU) as an alternative option for residential building construction. This is in an effort to explore the variables impacting their existing and potential applications as sustainable materials and a method for residential building construction. IEMU's are then examined under the triple bottom line (TBL) sustainability framework which includes analyzing the environmental, economic, and social sustainability of IEMU's. The findings of this review may lead to further progression in the development of a framework for evaluating U.S. stakeholder adoption of IEMU's and potential implementation in U.S. residential construction.

  • PDF

Evaluating the Competitiveness of Asian Construction Companies through Patent Analysis

  • Ji, Woojong;Lee, Dongmin;Lim, Hyunsu;Pyo, Kiyoun;Lee, Dongyoun;Lee, Hak-Ju;Park, Insung;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.199-212
    • /
    • 2020
  • In evaluating the competitiveness of construction companies and their development strategies, patents are a useful and objective source of technical information. In this study, the cutting-edge technologies of construction industries of China, Japan, and South Korea were investigated based on the data of patent applications filed by a total of 15 construction companies (five companies from each country). The related technologies were classified into six core technology groups based on their keywords. After that, we used four patent analysis methods: time series analysis, IP (Intellectual Property) emergence level analysis, spiral module analysis, and OS (Object-Solution) Matrix analysis, to identify the promising technologies/vacant technologies for global construction companies in China, Japan, and South Korea, and to analyze the technical competitiveness of the three countries. The findings of this study showed that each country can claim a relative technological advantage over the others. Overall, 3D printing and offsite construction technology, data acquisition technology, AR and VR technology are expected to be promising in the Asian region. The present study contributes to the body of knowledge by expanding our understanding of technological innovation for the competitiveness of companies and the technology development strategies pursued by the construction industries of China, Japan, and South Korea.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Development and application of construction monitoring system for Shanghai Tower

  • Li, Han;Zhang, Qi-Lin;Yang, Bin;Lu, Jia;Hu, Jia
    • Smart Structures and Systems
    • /
    • v.15 no.4
    • /
    • pp.1019-1039
    • /
    • 2015
  • Shanghai Tower is a composite structure building with a height of 632 m. In order to verify the structural properties and behaviors in construction and operation, a structural health monitoring project was conducted by Tongji University. The monitoring system includes sensor system, data acquisition system and a monitoring software system. Focusing on the health monitoring in construction, this paper introduced the monitoring parameters in construction, the data acquisition strategy and an integration structural health monitoring (SHM) software. The integration software - Structural Monitoring/ Analysis/ Evaluation System (SMAE) is designed based on integration and modular design idea, which includes on-line data acquisition, finite elements and dynamic property analysis functions. With the integration and modular design idea, this SHM system can realize the data exchange and results comparison from on-site monitoring and FEM effectively. The analysis of the monitoring data collected during the process of construction shows that the system works stably, realize data acquirement and analysis effectively, and also provides measured basis for understanding the structural state of the construction. Meanwhile, references are provided for the future automates construction monitoring and implementation of high-rise building structures.