• Title/Summary/Keyword: Civil Planning

Search Result 1,037, Processing Time 0.027 seconds

Evaluation of Building Construction Management in Sylhet City, Bangladesh

  • Anamul, Hasan Md.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.40-47
    • /
    • 2012
  • Construction management is essential for a achieving any pre-determined objective. It is however seen that in spite of construction management, majority of the project do not keep up their original time schedule and their completion cost is also higher as compared with the estimated cost The main reason for overrun in time and cost is that the planning at the outset of the project was not adequate or method of planning was not a refined one. In this research work, I showed the overall conditions of construction work and management in Sylhet city of Bangladesh and found many drawbacks in the construction management after completing my research. I found several factors affecting proper construction management and I have provided brief results. I have also provided some recommendations after my research work.

The Lay of the Houses in the Rural Villag (농촌마을의 살림집 좌향(坐向)에 관한 연구)

  • Rhee, Shin-Ho;Oh, Moo-Young
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.2 s.14
    • /
    • pp.27-31
    • /
    • 2001
  • The meaning of the lay of the houses - traditional dwellings- was discussed and its application in the rural village was surveyed, The azimuth of the houses is considered to the direction of a sun and the house facing south is best. The houses are built with a low and comfortable hill for a background. The direction of the houses, which way the center of a house looks, usually looks the 70-80% point of a ridge line. The civil surroundings that the houses never look each other in the face and three houses are not sit side by side are good. The two rural villages surveyed were placed along the traditional custom

  • PDF

Three-dimensional Mixing Behaviour Characteristics of Seomjin River Discharges (섬진강 유출수의 3차원 거동 특성)

  • Kim, Jong-Kyu;Kim, Myong-Won;Kang, Tae-Soon;Yoon, Eun-Chan
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.4 s.71
    • /
    • pp.50-57
    • /
    • 2006
  • The effect of discharges from the Seomjin River on the dispersion of thermal effluent from the Hadong Power Plant, located along the south coast of Korea, was investigatedusing intensive field observation and three-dimensinal Princeton Ocean Model simulations. A POM and observed CTD data was used to predict the mixing behaviour of the Summer freshet, during the July 2005 intensive observing period. The dispersal of the river discharge anomaly, associated with the Seomjin River plume, was seen to be highly responsive to tidal currents and river flows during the spring tide.

Estimation of Daily Solar Radiation at the Missing Point for Water Quality Impact Assessment in Nakdong River Watershed: Comparison of Modified Angstrom Model and Transmittance interpolation Model (수질 영향평가 신뢰수준 향상을 위한 낙동강 유역 미관측 지점에서의 일사량 추정: 수정형 Angstrom모형과 투과율모형의 비교)

  • Lee, Khil-Ha
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.1
    • /
    • pp.219-227
    • /
    • 2012
  • Daily solar radiation is essential for water resources planning and environmental impact assessment. However, radiation data is not commonly available in Korea other than in big cities, and there has been no direct measurement for rural areas where water resources planning and environmental impact assessment is usually most needed. In general, missing radiation data is estimated from nearby regional stations within a certain distance, and this study compared two dominant methods (modified Angstrom equation and transmittance interpolation method) at six stations in Nakdong River watershed area. Two methods shows a similar level of accuracy but the transmittance interpolation method is likely to be superior in that there is no need for any measurement element since the modified Angstrom equation require the sunshine hour measurement. This study will contribute to improve water resource and water quality management in Nakdong River watershed.

Risk-based optimum repair planning of corroded reinforced concrete structures

  • Nepal, Jaya;Chen, Hua-Peng
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.2
    • /
    • pp.133-143
    • /
    • 2015
  • Civil engineering infrastructure is aging and requires cost-effective maintenance strategies to enable infrastructure systems operate reliably and sustainably. This paper presents an approach for determining risk-cost balanced repair strategy of corrosion damaged reinforced concrete structures with consideration of uncertainty in structural resistance deterioration. On the basis of analytical models of cover concrete cracking evolution and bond strength degradation due to reinforcement corrosion, the effect of reinforcement corrosion on residual load carrying capacity of corroded reinforced concrete structures is investigated. A stochastic deterioration model based on gamma process is adopted to evaluate the probability of failure of structural bearing capacity over the lifetime. Optimal repair planning and maintenance strategies during the service life are determined by balancing the cost for maintenance and the risk of structural failure. The method proposed in this study is then demonstrated by numerical investigations for a concrete structure subjected to reinforcement corrosion. The obtained results show that the proposed method can provide a risk cost optimised repair schedule during the service life of corroded concrete structures.

FRAMEWORK FOR HIGHLY INTEGRATED, INTEROPERABLE CONSTRUCTION SIMULATION ENVIRONMENTS

  • Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.71-82
    • /
    • 2009
  • This paper describes the use of a highly interactive and inter-operative application for complex simulation environments, or Synthetic Environments (SE), as deployed for construction as Construction Synthetic Environments (CSE). Based on the High Level Architecture (HLA), this research focuses on implementing simulation technology in a software environment, COSYE, that will be the foundation for building CSE applications. This framework is discussed in the context of tunneling and industrial construction applications, including steel fabrication and pipe-spool manufacture. The framework is demonstrated using the NEST sanitary tunnel project in Edmonton, Canada, in which COSYE was used for scenario-based analysis and planning.

  • PDF

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

MIXED-USE PROJECT DEVELOPMENT PROCESS: FEATURES, PITFALLS AND COMPARISONS WITH SINGLE-USE PROJECTS

  • Charles Y.J. Cheah;Kok Sang Tan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.335-340
    • /
    • 2005
  • In many urban cities, mixed-use development is becoming increasingly essential for the creation of an attractive and sustainable environment that promotes economic vitality, social equity and environmental quality. Due to the differences in scale, scope and intent, certain aspects within the project delivery process of mixed-use are not the same as "conventional" single-use projects. The objective of this paper is to highlight these aspects. Two cases in Southeast Asia serve to illustrate the uniqueness and challenges of mixed-use. In conclusion, the differences between mixed-use and single-use are evident in terms of the diversity of team members, the necessity of multiple market analyses, and a multi-layer (versus single-source) financing structure. Finally, issues concerning ownership tangles, land assembly, planning and application procedures, investment criteria of institutions have been identified as major pitfalls.

  • PDF

Flood Damage Reduction Plan Using HEC-FDA Model (HEC-FDA 모형을 이용한 홍수피해 저감계획)

  • Lee, Jongso;Kim, Duckhwan;Kim, Jungwook;Han, Daegun;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.17 no.3
    • /
    • pp.237-244
    • /
    • 2015
  • This study is estimated the flood damage probability of the flood discharge, the flood stage estimation and Economic Analysis for Flood Control about considering of uncertainty. Sum River Basin has chosen and the probability precipitation is estimated by using the concept of critical rainfall duration depending on the frequency of each flood stage estimation point. For calculating the expected annual damage, the functions of long term hazard, discharge-frequency, stage-discharge and depth-damage are established for 8 areas in Sum River Basin. The expected annual damaged is obtained which is based on the sampling informations through more than 500,000 simulation from the functions of considered uncertainty. The result about the optimum frequency and Investment Priorities are estimated by conducting the evaluation about planning the levee of various of Design Frequency. In analysis result, 12% of B/C value has increased if the uncertainty has concerned. Also the optimum frequency or Investment Priorities are possible to be changed. If the political and social analysis perform together it would be helpful to have a reasonable decision other than only the economical analysis as actual Flood damaged reduction planning.

Optimizing Urban Construction and Demolition Waste Management System Based on 4D-GIS and Internet Plus

  • Wang, Huiyue;Zhang, Tingning;Duan, Huabo;Zheng, Lina;Wang, Xiaohua;Wang, Jiayuan
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.321-327
    • /
    • 2017
  • China is experiencing the urbanization at an unprecedented speed and scale in human history. The continuing growth of China's big cities, both in city land and population, has already led to great challenges in China's urban planning and construction activities, such as the continuous increase of construction and demolition (C&D) waste. Therefore, how to characterize cities' construction activities, particularly dynamically quantify the flows of building materials and construction debris, has become a pressing problem to alleviate the current shortage of resources and realize urban sustainable development. Accordingly, this study is designed to employ 4D-GIS (four dimensions-Geographic Information System) and Internet Plus to offer new approach for accurate but dynamic C&D waste management. The present study established a spatio-temporal pattern and material metabolism evolution model to characterize the geo-distribution of C&D waste by combing material flow analysis (MFA) and 4D-GIS. In addition, this study developed a mobile application (APP) for C&D waste trading and information management, which could be more effective for stakeholders to obtain useful information. Moreover, a cloud database was built in the APP to disclose the flows of C&D waste by the monitoring information from vehicles at regional level. To summarize, these findings could provide basic data and management methods for the supply and reverse supply of building materials. Meanwhile, the methodologies are practical to C&D waste management and beyond.

  • PDF