• Title/Summary/Keyword: Civil Engineering Project

Search Result 1,471, Processing Time 0.027 seconds

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

Jeju Shinyang Fishing Port Remodeling Plan Utilizing Marine Tourism Resources (해양관광자원을 활용한 제주 신양항 리모델링 계획)

  • Kim, Yelim;Sung, Jong-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.52-69
    • /
    • 2016
  • The fishing port was once the foothold of production as well as the stronghold of communities but with the declining of the fishing industry, ports became abandoned space. Jeju Special Self-Governing Province has continued its effort to vitalize marine tourism since 2010. Shinyang Port in particular is designated as a Prearranged Marina Port Development Zone, and planning for the Jeju Ocean Marina City project is underway. Nevertheless, fishing port remodeling projects implemented on Jeju so far have focused only on civil engineering such as renovating old facilities. In addition, most Marina Port Development Projects have been irrelevant to local communities. Leading projects by the local government mostly suffer from a lack of funding, which results in the renovation of old facilities and improper maintenance, while private sector investment projects do not lead to benefit sharing with the community. Shinyang Port, also renovated in 2008, ended up with outer breakwater extension construction that neither solved the fundamental problem of the site nor gave benefits to residents. To arrange a way to solve problems for civil engineering focused development project, improper maintenance, and benefit sharing with community, first, this study proposes a development plan that connects with the outlying areas near the ports. The plan reflects existing topography, Jeju traditional stonewalls, narrow paths on the master plan and programs by reading the regional context. In this way, this paper suggests a space development plan reflecting the local landscape and characteristic factors. Second, it satisfies various needs by using existing and new Marine Tourism Resources. Third, it examines sustainable operation and management measures through residents' participation. The proposal is significant in two key ways: it is a fresh attempt at connecting the fishing port with its outlying areas from a landscape perspective; and it considers environmental, social, economic issues, and suggests participation for local communities. Thus, the model can be used in future fishing-port remodeling plans for revitalizing unused space, including invaluable traditional landscapes, and for boosting the marine-leisure industry.

Microbial profile of asymptomatic and symptomatic teeth with primary endodontic infections by pyrosequencing (원발성 치근단 치주염을 갖는 감염근관에서 증상유무에 따른 세균분포의 pyrosequencing 분석)

  • Lim, Sang-Min;Lee, Tae-Kwon;Kim, Eun-Jeong;Park, Jun-Hong;Lee, Yoon;Bae, Kwang-Shik;Kum, Kee-Yeon
    • Restorative Dentistry and Endodontics
    • /
    • v.36 no.6
    • /
    • pp.498-505
    • /
    • 2011
  • Objectives: The purpose of this in vivo study was to investigate the microbial diversity in symptomatic and asymptomatic canals with primary endodontic infections by using GS FLX Titanium pyrosequencing. Materials and Methods: Sequencing was performed on 6 teeth (symptomatic, n = 3; asymptomatic, n = 3) with primary endodontic infections. Amplicons from hypervariable region of the small-subunit ribosomal RNA gene were generated by polymerized chain reaction (PCR), and sequenced by means of the GS FLX Titanium pyrosequencing. Results: On average, 10,639 and 45,455 16S rRNA sequences for asymptomatic and symptomatic teeth were obtained, respectively. Based on Ribosomal Database Project Classifier analysis, pyrosequencing identified the 141 bacterial genera in 13 phyla. The vast majority of sequences belonged to one of the seven phyla: Actinobacteria, Bacteroidetes, Firmicutes, Fusobacteria, Proteobacteria, Spirochetes, and Synergistetes. In genus level, Pyramidobacter, Streptococcus, and Leptotrichia constituted about 50% of microbial profile in asymptomatic teeth, whereas Neisseria, Propionibacterium, and Tessaracoccus were frequently found in symptomatic teeth (69%). Grouping the sequences in operational taxonomic units (3%) yielded 450 and 1,997 species level phylotypes in asymptomatic and symptomatic teeth, respectively. The total bacteria counts were significantly higher in symptomatic teeth than that of asymptomatic teeth (p < 0.05). Conclusions: GS FLX Titanium pyrosequencing could reveal a previously unidentified high bacterial diversity in primary endodontic infections.

Simulation and Feasibility Analysis of Aging Urban Park Refurbishment Project through the Application of Japan's Park-PFI System (일본 공모설치관리제도(Park-PFI)의 적용을 통한 노후 도시공원 정비사업 시뮬레이션 및 타당성 분석)

  • Kim, Yong-Gook;Kim, Young-Hyeon;Kim, Min-Seo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.5
    • /
    • pp.13-29
    • /
    • 2023
  • Urban parks are social infrastructure supporting citizens' health, quality of life, and community formation. As the proportion of urban parks that have been established for more than 20 years is increasing, the need for refurbishment to improve the physical space environment and enhance the functions of aging urban parks is increasing. Since the government's refurbishment of aging urban parks has limitations in securing financial resources and promoting attractiveness, they must be promoted through public-private partnerships. Japan, which suffered from the problem of aging urban parks, has successfully promoted several park refurbishment projects by introducing the Park-PFI through the revision of the 「Urban Park Act」 in 2017. This study examines and analyzes the characteristics of the Japan Park-PFI as an alternative to improving the quality of aging domestic urban park services through public-private partnerships and the validity of the aging urban park refurbishment projects through Park-PFI. The main findings are as follows. First, it is necessary to start discussions on introducing Japan's Park-PFI according to the domestic conditions as a means of public-private partnership to improve the service quality and diversify the functions of aging urban parks. In order to introduce Park-PFI social discussions and follow-up studies on the deterioration of urban parks. Must be conducted. The installation of private capital and profit facilities and improvements of related regulations, such as the 「Parks and Green Spaces Act」 and the 「Public Property Act」, is required. Second, it is judged that the Park-PFI project is a policy alternative that can enhance the benefits to citizens, local governments, and private operators under the premise that the need to refurbish aging urban parks is high and the location is suitable for promoting the project. As a result of a pilot application of the Park-PFI project to Seyeong Park, an aging urban park located in Bupyeong-gu, Incheon, it was analyzed to be profitable in terms of the profitability index (PI), net present value (FNPV), and internal rate of return (FIRR). It is considered possible to participate in the business sector. At the local government level, private capital is used to improve the physical space environment of aging urban parks, as well as the refurbishment of the urban parks by utilizing financial resources generated by returning a portion of the facility usage fees and profits (0.5% of annual sales) of private operators. It was found that management budgets could be secured.

Transformation Model of Vertical Datum between Land and Ocean Height System using the Precise Spirit Leveling Results (정밀수준측량 성과를 이용한 육상 및 해상 수직기준면 변환모델링)

  • Lee, Dong-Ha;Yun, Hong-Sic;Hwang, Jin Sang;Suh, Yong-Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.407-419
    • /
    • 2012
  • It is difficult to obtain the accurate and homogeneous height information over the whole Korea due to the effect of different vertical datums have been divided into land and sea part. In this study, we tried to unify the different vertical datums using the precise spirit leveling between TBM (tidal bench mark) and BM (bench mark) in order to solve the problems caused by different vertical datums. For this, the vertical datum offsets at observed points which were calculate from leveling results and then transformation model of vertical datum will be modelled using calculated offsets along the coastal line. For suggesting the precise modelling method to vertical datum transformation, we analyzed results from various interpolation methods such as Spline and LSC method. As the results from analysis, the LSC method combined with 4-parameters trend model is more suitable for modelling the offsets between vertical datums. The final transformation model of vertical datum using the combination of LSC and 4-parameter model which provides the transformation accuracies of ${\pm}10.4cm{\sim}14.8cm$ level. And, the software for vertical datum transformation that was also developed using the final model in order to convert the height information included in various spatial data effectively. Therefore, the transformation model between vertical datums of land and sea part, which is developed in this study, is expected to minimize the confusion caused by mismatch of height information in the use of spatial data, and it also can be minimize economic and time losses in various application fields such as coastal development project, coastal disaster prevention, etc.

A Simple Methodology for Estimating the Capacity of Multi-lane Smart Tolling (다차로 톨링시스템(SMART Tolling)의 용량추정 방법에 대한 연구)

  • Choi, Keechoo;Lee, Jungwoo;Park, Sangwook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.305-311
    • /
    • 2012
  • With the rapid deployment of hipass$^{(R)}$, the congestion is inevitable due to the operation of the hipass lane system. Recently, SMART Highway project have developed a multi-lane mainline tolling system, called SMART Tolling system. To analyze the effectiveness of the system in terms of capacity, this study tries to estimate the capacity and its improvement of multi-lane tolling system based on current hipass$^{(R)}$ data. The methodology uses the saturation time headway. This follows three steps; 1) estimate the saturation time headway, using hipass$^{(R)}$ data, and capacity. 2) estimate two factors (the first one is dividing the one side lane width and lateral clearance factor ($f_w$) into two side one, the second one is dividing the capacity of hipass lane operating a circuit breaker into the capacity of hipass lane not operating, the last one is increasing factor of lane width). 3) calculate the capacity of multi-lane mainline tolling system. The results of method produced 2172~2187 veh/hour as smart tolling capacities, respectively. Those are higher about 370 veh/hour than the values from existing literature reviews. Additionally, saturation time headways were identified as lower by 0.5 seconds/veh than existing headways based on hi-pass$^{(R)}$ based one, which naturally implies the improvement in capacity. Some limitations and future research agenda have also been discussed.

The Analysis and Field Measurement of Longitudinal Track Forces for Long Railroad Bridges (교량상 궤도축력의 해석 및 실측결과 비교)

  • Kang, Kee Dong;Park, Jong Bang;Kim, In Jae;Park, Dae Geun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.907-913
    • /
    • 1994
  • The design of railroad bridges differs from road bridges because of the interface between track structure and bridge structure. The track generally consists of Continuous Welded Rail(CWR) which is fixed by fasteners to the sleepers embedded in the ballast. The ballast provides the interface between the track structure and the bridge structure. Large longitudinal forces can develop from the temperature variation in rail and bridge structure. These longitudinal forces are specially important for long bridges because the bridge layout for span length, pier dimensions and arrangement and type of bearings can be governed by these forces. This report provides a comparison of longitudinal track forces determined by analysis and actual measured track forces. In recent practice the longitudinal track force for European railways is analyzed using a finite element analysis method. This method is very time-consuming and requires the detail design of the bridge to be complete. Redesign is required if the design criteria for longitudinal track forces are not satisfied. There is a need to develop a simple analysis method considering the large number of bridge structures and a relatively short design time on the Korean High Speed Rail Project. The analysis results presented herein, based on a simplified analysis, show good agreement with those obtained by finite element analysis, as well as with those measured on an actual track. The proposed analysis method is particularly useful for the preliminary design of bridge structures.

  • PDF

Productivity analysis using a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 적용시 생산성 분석)

  • Lim, So-Young;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.87-95
    • /
    • 2020
  • With the advent of the 4th industrial revolution and the combination of IoT, there have been diverse domestic and foreign researches for the development of construction industry. Especially, in the large-scale earthwork site where many and various construction equipments are put into, the control system between construction equipments is important for the increase of productivity. Thus, after developing the fleet management system for the optimum operation of construction equipments, the problems were checked and improved for each step in the process of application at site. In order to verify the site application process of the fleet management system for the optimum operation of construction equipments, the analysis on the productivity was performed by inputting the data used for the actual site and the site data using this system and then comparing the data through simulation. The analysis was limited to excavator and dump. In the results of the analysis, the rate of work per hour was increased to the range of 4 % while the cost price was decreased to 4 %. Even though the results of the analysis could be different depending on the site applied, the results showing the increase of workload of equipments and the decrease of cost price in the complex project at earthwork site verify the increase of productivity.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.