• Title/Summary/Keyword: Civil Complaints

Search Result 184, Processing Time 0.023 seconds

A study on the effect of blasting vibration and the optimal blasting offset according to the depth of tunnel (터널 심도에 따른 발파 진동 영향 및 최적 발파 이격거리 연구)

  • Kong, Suk-Min;Choi, Sang-Il;Kim, Yeong-Bae;Noh, Won-Seok;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.483-494
    • /
    • 2022
  • Owing to the saturation of ground spaces in downtown areas, underground spaces are being developed increasingly. Underground spaces are utilized for transportation, water supply and sewerage, communication zones, electric power zones, and various cultural complexes. In Korea, for excavating underground spaces, blasting methods using gunpowder such as the New Austrian Tunneling Method (NATM) are mainly used. However, the blasting method causes vibration and noise during tunnel excavation, generating many complaints from residents in the vicinity of the excavation site. To address this problem, various methods have been developed, and recently, vibration and noise have been reduced using deep excavation. This study predicts blast vibration changes according to the depth, under the same blasting and tunnel conditions, using numerical analysis based on the blast vibration measurement data of the GTX-A route, the tunnel cross-section drawings, and ground investigation reports. Furthermore, the necessary separation distance from densely populated areas such as residential areas is suggested by analyzing the trend of decreasing blast vibration according to the distance from ground surface directly above the blasting location.

Evaluation of the Lateral Influence Range on Temporary Structures for a Train Operating at 80km/h (시속 80km/h의 열차 운행시 가시설 구조물에 미치는 수평영향범위 평가)

  • Jong-Chul Kim;Yeong-Bae Kim;Tae-Hyun Hwang;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.35-45
    • /
    • 2023
  • In accordance with the urban development project, cases of constructing temporary wall structures for ground excavation in the vicinity of railway structures are increasing. In addition, the complaints about train vibration are also increasing from people living in large buildings newly built after installing the temporary wall structures. In order to solve this problem, a method for reducing train vibration is considered from the design stage of the building, and a vibration reduction system is installed on the structure when the building is newly constructed. However, the vibration reduction method established at the structure design stage can be determined through the results of field measurements or dynamic numerical analysis for a specific area, and there is a limit to evaluating whether the established vibration reduction method is appropriate due to the lack of objective research data. Therefore, in order to provide objective basic data when establishing a vibration reduction method, this study performed the dynamic numerical analysis for a operating train with a speed 80km/h by applying differently the depths of railway structures, the distances between railways and temporary wall structures, and ground conditions. It was found that the range of influence of a train operating at 80 km/h was within 4.5D of the lateral distance from the railway structure in the case of the condition where the temporary wall was installed.

Tunnel Design/Construction Risk Assessment base on GIS-ANN (GIS-ANN 기반의 도심지 터널 설계/시공 위험도 평가)

  • Yoo, Chung Sik;Kim, Joo Mi;Kim, Sun Bin;Jung, Hye Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1C
    • /
    • pp.63-72
    • /
    • 2006
  • Due to rapid development of many cities in Korea, many public facilities are required to be built as well as complementary civil structures. Consequently, a number of tunnel constructions are currently carried out throughout the country, and many more tunnels are planned to be constructed in the near future. Tunnel excavation in a city often causes serious damage to above-ground structures and sewer system because of unexpected settlement. In order to prevent the destruction, the tunnel, which bypasses the center of a city, must be specially evaluated for its influence to other structure. In addition, since a slight disturbance of above-ground structure causes numerous public complaints and civil appeals, it must be approached with different method than the mountain tunnels. In this paper, the evaluation method using the Artificial Neural Network (ANN) has been studied. The method begins with an analysis of the minimal sectional area. If its result can be used to approximate the general influence of the whole section, the actual evaluation using ANN will take off. In addition, it also studies the construction management method which reflects the real time soil behavior and environment influence during construction using Geographic Information System (GIS).

A Study on Optimal Operation for Flare systems (플레어 시스템의 최적 운영방안에 대한 연구)

  • Song, Bang-Un;Bok, Hyeong-Jun;Woo, In-Sung
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.6
    • /
    • pp.1-7
    • /
    • 2019
  • Most oil refineries and chemical plants have flare systems designed to mitigate pressure rises in process facilities in case of emergencies that require the release of large amounts of gas due to sudden process shutdowns such as power outages. However, the rise of the flame of the flare system causes civil complaints from residents around the factory due to visible pollution, and economic loss occurs in the company, which requires constant management. In this study, two items were diagnosed and analyzed in order to derive the optimal operation method of flare system. First, to detect the cause of the rise in flame height, the acoustic leak detector was used to check gas leaks in safety valves and pressure control valves. Second, to identify the cause of flame instability, the pulsation phenomenon was diagnosed through the CFD simulation and modeling experiments of the sealing drum. By confirming the leak at 4.3% of the safety valve and 10% of the pressure control valve, the cause of abnormal sparking was derived. The information presented in this study can be easily applied to any company that has a flare system, and is expected to prevent complaints and product loss.

Design of Simulation Prototype UI for Virtual Reality-based Air Blast and Vibration (가상현실 기반 발파소음 및 진동 시뮬레이션 UI 설계)

  • Lee, Dongyoun;Lee, Sang Gyu;Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.10 no.4
    • /
    • pp.35-44
    • /
    • 2021
  • Recently, the new subway project called "Great Train Express" is in progress. During the tunnel excavation in the center of city, vibration and noise are generated, which make an uncomfortable effect on nearby residents. In order to prepare for this situation, the construction company generally establishes a noise and vibration management plan at the site from the construction planning stage through consultation with the residents of nearby areas and establishment of countermeasures for complaints raised. However, despite the establishment of a noise and vibration management plan, civil complaints have not been fundamentally resolved due to occurring noise and vibration during the construction in progress. In order to solve this problems, one of the best solution is to provide noise and vibration simulation technology with a high sense of reality and immersion for residents of nearby areas. Considering the ease and convenience of using the system, we intend to develop a UI(User Interface) necessary for the development of a simulation system that can directly experience the air blast and vibration based on virtual reality. The results of this study are expected to contribute to the development of virtual reality-based air blast and vibration simulations in the future.

Estimation of Parking Lot Planning and, Suggestion of Parking Planning Methods Considering Vehicle Types (차종을 고려한 주차 계획단위 산정 및 주차계획 방법 제시)

  • Kwon, Sung-Dae;Park, Je-Jin;Kim, Joong-Hyo;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.755-764
    • /
    • 2011
  • At the present, planning and installation of parking space sections and lane width are implemented in accordance with the installation standard and parking lot structure by the enforcement regulations of the Parking Act. While large and RV (Recreational Vehicle) vehicles have increased in number recently, parking is complex with improper installation standards. It causes serious problems, including vehicle vandalism, increased civil complaints, travel inconveniences for parking lot users, management and maintenance issues for parking lots, and so forth. The study, therefore, determined that the practical and appropriate realignment of parking unit adjustment and lane width regulations are essential. The study conducted prior review on domestic parking sections and change cases of composition by vehicle types, including the component ratio of domestic and foreign vehicles, width of vehicle by types in order to examine the parking problems that account for a increasing social issues, and provided parking plan methods by types of vehicle, as well as reform and reaction plans for parking unit adjustment and lane width considering security and smooth traffic flow. After comparing and analyzing between estimated installation of parking space and lane width and internal and external cases, the study suggests the improvement that considers expenses and convenience of a driver. Also, it shows installation of parking space that considers traffic safety, improvement of lane width, and parking way depends on vehicle types. By providing estimation for parking planning and parking planning methods that secure safe and smooth traffic flow within a parking lot, the study will contribute to the development of improved alternatives for cost-effective traffic safety and set-up structure, including installation standards of parking lots.

Suggestion of Improving and Estimating Parking Space Section Considering Proper Position of Car-Stopper (카스토퍼 설치위치를 고려한 주차단위구획 산정 및 개선방안 제시)

  • Kwon, Sung-Dae;Park, Je-Jin;Lee, Jun-Young;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1095-1104
    • /
    • 2013
  • The number of vehicles registered in Korea is rapidly increasing and will reach 18.26 million as of June 2011. The rapid increase of large-size passenger cars and RVs among this number is causing damage to other vehicles when parked in currently installed parking lots, increased civil complaints from the damage, and inconveniences to people trying to pass through parking lots as well. In particular, the car-stoppers indiscriminately installed at the parking lots are also causing accidents and adding to parking problems, causing economic losses. Accordingly, there should be new regulations for the amount of parking space per vehicle and for locations to install the car-stoppers. The research has first reviewed the distribution ratio of vehicle models from home and abroad for the width and length of the vehicles by each model, parking space per vehicle where the car-stoppers are installed and examples of changes in distribution ratio. In addition, the amount of parking space per vehicle was calculated with consideration for various specifications by each car model. As a result, margin width of full sized car is decreased by 18~21mm on the existing width. This is judged decreases accident of parking lot, because length of the front of car is not deviate parking Space Section. In conclusion, presented improvement ideas for parking plans with enhanced convenience and safety from the aspect of the drivers. Parking lot relevant businesses will also be maximized in terms of cost and efficiency when the criteria for the structure of parking lots and their installation is established and the improved parking plan is applied in the future.

A Physical Model Test on the Behavior of Shield-tunnel Lining According to Drainage Conditions in Weathered Granite Soil (화강풍화토 지반에서 배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.6
    • /
    • pp.71-82
    • /
    • 2015
  • Recently, due to the expansion of urban infrastructure for the citizen convenience, the shield tunnel construction has increased considering the civil complaints minimization and construction stability. Most shield tunnels are designed based on the assumption of the undrained condition that underground water does not inflow, but they are operated in the field as drained tunnels with drainage facility to drain underground water. Therefore, the drained condition needs to be considered in the shield tunnel design. It is also necessary to consider the weathered granite soil that is widely distributed throughout the country and consequently is encountered in most of construction sites. In this paper, the model test which can control total stress and pore water pressure and simulate the underground tunnel located in the weathered granite soil below ground water level is conducted. Total stress, pore water pressure and an inflow water into an inner pipe were measured using the testing device. Test results showed that the total stress in a drained condition was lower than in an undrained condition because pore water pressure decreased in a drained condition and an inflow water into an inner pipe was proportional to the loading stress in a drained condition. As a result, if a drained condition is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

A Study on Behavior Characteristics of Precast Coping Part under Axial Load (축하중을 받는 프리캐스트 코핑부의 거동 특성 연구)

  • Won, Deok-Hee;Lee, Dong-Jun;Kim, Seung-Jun;Kang, Young-Jong
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.3
    • /
    • pp.281-287
    • /
    • 2011
  • Recently, bridge construction technology has made great progress from development of high performance materials and new bridge types. However, most technology are based on methods of cast-in-place and material cost saving. The method of cast-in-place concrete causes environmental damages and costumer complaints. Especially, under bad weather conditions, the construction can not proceed. To overcome these disadvantages, new construction methods were developed to reduce construction time. These methods are called precast method. Most prefabricated methods have been applied to superstructure constructions of bridges, but very minutely applied to substructure constructions. The most important agendas on precast method are light weight and transportability of the precasted members, because very strict transporting specifications exist for road transportation of the precasted members. For example, the weight and length of coping members may be larger than the available transporting vehicles. Although column is constructed by precast method to save construction time, if coping member is constructed by cast-in-place method, then the column construction time reduction becomes meaningless. Therefore, in this study, a new precast coping member and a connecting system of column-coping member are proposed. The proposed method is verified by analyzing their ultimate performance through analysis and experimental study.

Analytical Research on Dynamic Behavior of Steel Composite Lower Railway Bridge (강합성 하로 철도교의 동적거동에 대한 해석적 연구)

  • Jeong, Young-Do;Koh, Hyo-In;Kang, Yun-Suk;Eom, Gi-Ha;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.27-35
    • /
    • 2019
  • The existing middle-long span railway bridge has been mainly applied to steel box girder bridges. However, the steel box girder bridges have disadvantages in securing the space under the bridge, and the main girder is made of a thin plate box shape, resulting in a ringing noise due to the vibration. Many complaints about noise have been raised. For this reason, there is a need for the development of long railway bridges that can replace steel box girder bridges. In this paper, the characteristics of the steel composite railway bridge currently developed were introduced and a time history analysis was conducted using MIDAS Civil reflecting the speed of KTX load for 40m and 50m bridges. In addition, from the analysis results, the dynamic behavior of target bridges were verified and it was examined whether they meet the dynamic performance criteria proposed in the railway design standards. As a result, all of the bridges under review satisfied the dynamic safety criteria, however, in case of 40m of span, the vertical acceleration value was very large. In order to solve this problem, authors proposed the improvement plan and corrected the cross section to confirm that the vertical acceleration decreased.