• 제목/요약/키워드: Citarum

검색결과 11건 처리시간 0.029초

Watershed Scale Flood Simulation in Upper Citarum Watershed, West Java-Indonesia using RRI Model

  • Nastiti, Kania Dewi;Kim, Yeonsu;Jung, Kwansue;An, Hyunuk
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.179-179
    • /
    • 2015
  • Citarum River is one of the important river in West Java, Indonesia. During the rainy season, flood happens almost every year in Upper Citarum Watershed, hence, it is necessary to establish the countermeasure in order to prevent and mitigate flood damages. Since the lack of hydrological data for the modelling is common problem in this area, it is difficult to prepare the countermeasures. Therefore, we used Rainfall-Runoff-Inundation (RRI) Model developed by Sayama et al. (2010) as the hydrological and inundation modelling for evaluating the inundation case happened in Upper Citarum Watershed, West Java, Indonesia and the satellite based information such as rainfall (GSMaP), landuse and so on instead of the limited hydrological data. In addition, 3 arc-second HydroSHEDS Digital Elevation Model (DEM) is used. To verify the model, the observed data of Nanjung water stage gauging station and the daily observation data are used. Simulated inundation areas are compared with the flood extent figure from Upper Citarum Basin Flood Management Project (UCBFM).

  • PDF

배수망의 분기를 고려한 Citarum 유역에 대한 장기유출모형 구축 (Construction of Long-Term Rainfall-Runoff Model for Citarum River Basin with the Consideration of Bifurcation of Drainage Network)

  • 김주철;김정곤;이상진
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.317-317
    • /
    • 2012
  • 본 연구에서는 Kwater에서 개발한 RRFS를 기반으로 인도네시아의 Citarum 유역에 대하여 장기유출모형을 구축하여 보았다. Citarum 유역은 전체면적이 $13,600km^2$이며 유역의 중심부에 3개의 다목적 댐(Saguling, Cirata, Juanda)이 운용 중에 있는 대규모 유역으로서 Fig. 1과 같이 크게 3개의 권역(C-region, I-region, J-region)으로 구분하여 살펴볼 수 있다. 중심부의 C-region은 유역전반에 걸쳐 형성된 수지상의 하천망이 한 개의 유출구로 수렴하여 자바해로 배수되는 일반적인 배수구조를 갖는다. 하지만 이의 좌우에 위치한 I-region과 J-region은 병렬적으로 분포된 중소규모 유역들이 각기 개별적인 유출구를 통하여 독립적으로 자바해로 배수하게 된다. 또한 Juanda 댐의 하류부에는 대상유역의 좌우에 위치한 도심지 및 농경지에 대한 용수공급을 위해 3개의 대규모 인공수로(West Tarum Canal, East Tarum Canal, North Tarum Canal)가 연결되어 있다. 따라서 본 연구에서는 Citarum 유역의 이러한 복잡한 배수특성을 고려하여 우선 C-region에 대하여 RRFS를 이용하여 독립적인 유출모형을 구축하고 여기에 3개의 인공수로를 자연하천망의 분기와 같은 형태로 취급하여 해당 시스템을 확장하여 보았다. 이에 따라 I-region과 J-region은 각기 West Tarum Canal과 East Tarum Canal을 본류로 하는 배수구조를 갖게 되며 병렬적으로 위치한 중소유역들은 이들 인공수로에 대한 측방유역과 같이 취급할 수 있었다. Fig. 2는 본 연구에서 구축한 시스템을 이용하여 Saguling 댐의 유입량을 모의한 결과를 예시한다.

  • PDF

Qual2E-Plus를 인도네시아 Citarum 유역 West Tarum Canal의 수질개선 효과분석 (Analysis of Water Quality Improvement of the WTC in the Citarum River Basin Using Qual2E-Plus)

  • 고익환;김정곤;노준우;박상영;이상욱
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.475-479
    • /
    • 2008
  • West Java 지역에 위치한 인도네시아 Citarum 강 유역은 자국의 효율적인 수자원관리를 위하여 매우 중요한 요충지에 해당하며 최근 통합수자원관리 프로젝트(ICWRMP)를 통하여 활발한 투자와 개발이 행해지고 있는 곳이다. West Tarum Canal은 Jatiluhur 댐 하류단에 위치하여 자카르타시의 생공용수를 공급을 담당하고 있으며 저수지 방류수와 더불어 Cibeet 강, 그리고 Cikarang 및 Bekasi 강이 차례로 유입되면서 부족한 용수를 충당하게 된다. 건설초기에는 풍부한 수량과 양호한 수질을 확보하여 효율적인 용수공급이 이루어졌으나 주변지역 산업개발에 따른 인구 및 오염원 증가, 주민들의 무분별한 취수로 말미암아 이 지역의 수질악화가 날로 심각해지는 상황이다. 특히 Bekasi강은 도심부를 포함하고 있어 이 지역으로부터 배출되는 오염물질의 영향이 WTC의 수질에 가장 큰 영향을 미치게 된다. 수질모의는 Qual2E-Plus 모형을 이용하여 수행하였으며 이를 기반으로 시나리오를 구성, 오염정도가 심각한 Cikarang 강과 Bekasi강에 사이폰 시설을 도입 현재 운영중인 Weir 시설을 대체함으로써 얻을 수 있는 수질개선효과를 검토한 결과 Bekasi 강의 경우 10%, Cikarang 및 Bekasi강에 동시에 도입하였을 경우 12%의 수질 개선 효과가 있는 것으로 분석되었다. 한편 오염부하량이 가장 높은 Bekasi강 유역에 환경기초 시설을 도입함으로써 기대할 수 있는 수질개선효과는 처리시설의 효율에 따라 16% 에서 최고 48%에 달하는 것으로 분석되었다.

  • PDF

ESP-PDF 기법을 이용한 Citarum 유역의 월 유출 예측 (Monthly Runoff Forecasting of Citarum River Basin by means of ESP-PDF Technique)

  • 김주철;김정곤;이상진
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.318-318
    • /
    • 2012
  • 인도네시아의 Citarum 유역을 대상으로 구축된 RRFS를 이용하여 해당유역의 상류에 위치한 다목적 댐인 Saguling 댐에 대한 2005년 월 유입량예측을 수행하여 보았다. 실제 예측과정에는 ESP 기법을 적용하였고 여기에 기상전망을 고려할 수 있는 사전처리기법인 PDF ratio 방법을 이용하여 유출량 시나리오의 발생확률을 갱신하였다. 이를 위하여 대상유역의 월 강우량 관측 자료에 대한 초보예측을 통하여 2005년 관측 강우량에 따라 기상전망을 생성하였다. 또한 Saguling 댐의 월 유입량 과거 관측자료에 대한 초보예측을 통하여 High Flow, Normal Flow, Low Flow에 대한 예측구간을 구성하여 보았다. Fig. 1과 Fig. 2는 각각 ESP 기법과 PDF ratio 방법을 이용하여 산정한 Normal Flow와 Low Flow의 상한계 유입량의 발생확률의 변화를 도시한 것이다. 관측 유입량이 발생한 구간의 예측확률을 기반으로 예측점수를 산정해 본 결과 ESP 기법에 의한 예측점수가 0.333을 상회하고 있음을 볼 수 있었다. 이는 ESP 기법에 의한 예측결과가 초보예측보다 정확도가 높음을 의미하는 것으로 본 연구에서 구성한 ESP 시스템의 적용성을 확인할 수 있다. 또한 고무적인 결과로서 PDF ratio 방법에 의한 예측점수가 ESP 기법에 의한 예측점수를 상회하고 있음을 확인할 수 있다. 이는 ESP 기법에 의한 예측결과를 확률기상전망을 이용하여 갱신할 경우 예측 정확도를 개선시킬 수 있음을 의미하는 것이다.

  • PDF

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2016년도 학술발표회
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

홍수예경보구축을 위한 수위관측망 설계:인도네시아 찌따룸강사례 (Design of a Water level Gauging Station Network in Flood Forecasting Warning System: Case Citarum River in Indonesa)

  • 이성수;피완섭;전계원;김기중
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2019년도 학술발표회
    • /
    • pp.301-301
    • /
    • 2019
  • 수위 관측 지점의 선정은 관측 기록의 목적, 지점의 접근성 등에 의해 결정되며, 수위는 유량을 계산하기 위한 필수 자료이므로 수위 관측 지점의 위치를 선정하는데 있어 수리조건은 매우 중요한 요소이다. 이에 수위관측소(WLS, Water Level Station)는 홍수예경보, 수해방지 등의 치수계획과 하천운영, 용수공급 등의 이수계획 및 생태계 보전을 위한 수질관리계획 등의 목적을 달성할 수 있는 지점에 WMO에서 제시한 수위관측소의 최소 밀도를 고려하여 설치된다. 한국의 경우 치수측면에서 홍수예경보시스템의 홍수예보 대상지점과 홍수유출 계산지점을 가장 중요한 요소로 판단한다. 이에 홍수통제소에서 운영하는 홍수예보 프로그램에 적절한 수위관측망을 고려하기 위하여 프로그램에서 사용되고 있는 소유역 출구점 또는 합류점을 모두 수위관측소 위치로 포함시키고 있다. 인도네시아 Citarum강 홍수예경보 모형의 실행 및 검정을 위해서는 주요 지류의 출구마다 수위관측소를 설치하는 것이 바람직하나, 수위관측소의 설치 및 운영에는 많은 비용이 소요되기 때문에 주어진 예산을 고려해야 하며, 홍수예보를 실시하는 이유는 홍수로 인한 피해를 경감시키기 위한 것이기 때문에 인구와 홍수피해 잠재성이 높은 지점을 위주로 설치를 계획하여야 한다. 사업 대상지역인 Citarum강에서 BBWSC가 운영 관리하는 WLS는 29개소이며, 이 중 대상지역인 Upper Citarum Basin(UCRB)에는 20개소의 WLS가 운영되고 있다. 본 설계에서는 $300km^2$당 1개소의 수위관측소를 설치하는 것을 기준으로 설정하여 홍수예경보가 필요한 WLS 8개소를 도출하였으며, 소유역의 출구점 또는 합류점 등을 고려하여 수위관측소 위치를 결정하였다. 또한 UCRB의 과거 홍수피해상황, 과거 홍수범람실적, 홍수범람도 등을 조사하였으며, 실시간 자료 전송을 위한 통신 환경, 차량의 접근 용이성 및 하천구역 대표성 등을 고려하여 홍수예경보 구축을 위한 최적의 수위관측망을 설계하였다.

  • PDF

섬유공장폐수 재이용 사례: 인도네시아 반둥을 대상으로 (Wastewater Reuse in Textile Industry: Case of Bandung, Indonesia)

  • 정영균;이미영;양시천;강석태
    • 적정기술학회지
    • /
    • 제5권1호
    • /
    • pp.18-24
    • /
    • 2019
  • 인도네시아 반둥인근에서 발원하여 수도인 자카르타인근 해역으로 연결되는 찌따룸강(Citarum river)은 공업 용수와 먹는 물로서 인근 산업 지역과 수도 자카르타의 주요 수자원(공업용수 및 음용수)으로 이용되고 있다. 그러나, 최근 찌따룸강은 처리되지 않은 생활하수 및 섬유산업 폐수로 심각하게 오염되고 있으며, 건기에는 무분별한 지하수 개발로 인해 지하수위가 급속히 하강하는 문제가 발생하고 있다. 따라서, 본 사업에서는 반둥 인근의 섬유공장에서 발생하는 폐수를 재이용하여, 찌따룸강 오염문제와 지하수위 하강문제를 해결하고자 하였다. 이를 위해 수처리용 가압부상장치(DAF)를 개량한 공법인 선회식 가압부상장치(CYFLOAT) 시스템을 인도네시아 현장에 맞게 개선하여 100 톤/일 용량 규모로 설치 및 운전하였다. 설치한 선회식 가압부상장치 시스템은 섬유 폐수 재이용 시 가장 중요한 수질기준 중 하나인 부유물질(SS)을 약 40분의 체류 시간 동안 96.8% 제거하였을 뿐만 아니라, 공간사용 및 유지관리측면에서도 매우 유리한 것으로 확인되었다. 또한, 본 기술의 설치와 운영에 현지 관련기관들(UNPAR 및 ITB, PU SKIM)을 참여시켜, 해당 기술이 인도네시아 찌따룸강 유역의 섬유공장 밀집지역내 지속적으로 적용 가능하도록 하였다.

인도네시아 Cisangkuy 유역의 물관리 시설물 연계운영을 통한 이수안전도 확보방안에 관한 연구 (A study on the method of water supply safety through the linked operation of water management facilities in Cisangkuy Basin, Indonesia)

  • 피완섭;전계원;최종호
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2023년도 학술발표회
    • /
    • pp.304-304
    • /
    • 2023
  • Cisangkuy 유역은 인도네시아 3대 도시인 반둥시의 주요 식수원 중 하나로 Citarum 강의 1지류에 해당된다. Cisangkuy 유역은 수계가 매우 복잡할 뿐만 아니라 다양한 관리 주체 및 다수의 수리시설물이 존재하여 수자원의 이용 및 관리에 많은 어려움이 있다. 특히 하천 수량의 대부분을 소수력 발전소의 발전용수로 활용하고 있기 때문에 식수원으로 활용할 수 있는 수량은 극히 한정되어 있다. 본 연구에서는 Cisangkuy 유역의 상수공급 부족 문제를 해소할 수 있는 비구조적인 대책으로써 물관리 시설물의 운영 최적화를 위한 방안을 제시하기 위해 물수지 네트워크 모형인 MODSIM을 활용하여 용수이용 효율 극대화를 위한 연구를 수행하였다. 이를 위해 연구대상지역의 용수이용 현황 및 물관리 시설물에 대한 운영 현황을 조사하였고, 유역 내 물 공급/배분 현황 분석을 수행하여 용수공급체계 개선방안 수립을 위한 물수지 분석 시나리오를 구축하였다. 시나리오는 크게 기존 저수지 운영효율 개선효과 검토, 저수지 상하류 신규댐 설치에 따른 연계운영 효과 검토, 극한 가뭄 발생시 연계운영 효과 검토, 관개용수 우선순위 적용에 따른 발전유량 이수안전도 검토로 구성되며, 각 시나리오별로 물수지 네트워크 모형을 구축하여 물관리 시설물 간 연계운영에 따른 이수안전도 평가를 통한 용수공급 가능량을 검토하였다. 본 연구의 결과는 인도네시아 Citarum 상류에 위치한 Cisangkuy 유역 내 다양한 시설물의 연계운영 효과를 분석하기 위한 초석이 될 수 있으며, 한정된 수자원과 다양한 수요 간의 효율적이고 합리적인 분배 및 시설물 운영문제를 해결하기 위한 의사결정도구로써 활용될 수 있을 것으로 판단된다. 아울러 인도네시아 물산업 육성을 위해 진출 시 수자원의 효율적인 활용을 위한 기초자료로 활용할 수 있을 것으로 기대된다.

  • PDF

참조 수문관측소 구성 조건에 따른 LSTM 모형 홍수위예측 정확도 검토 사례 연구 (Case study on flood water level prediction accuracy of LSTM model according to condition of reference hydrological station combination)

  • 이승호;김수영;정재원;윤광석
    • 한국수자원학회논문집
    • /
    • 제56권12호
    • /
    • pp.981-992
    • /
    • 2023
  • 최근 전세계적인 기후변화의 영향으로 강우가 집중되고 강우강도가 강해짐에 따라 홍수피해의 규모를 증가시키고 있다. 과거에 관측되지 않았던 규모의 비가 내리기도 하고, 기록되지 않았던 장기간의 장마가 발생하기도 한다. 이러한 피해들은 아세안 국가에도 집중되고 있으며, 태풍 및 집중호우로 인해 침수의 빈번한 발생과 함께 많은 사람들이 영향을 받고 있다. 특히, 인도네시아 찌따룸강 상류 유역에 위치한 반둥 지역은 분지 형태의 지형학적 특성을 가지고 있어서 홍수에 매우 취약한 실정이다. 이에 공적개발원조(ODA)를 통해 2017년에 찌따룸강 상류(Upper Citarum River) 유역에 대하여 홍수예경보시스템을 구축되었고, 현재 운영중에 있다. 그럼에도 불구하고, 찌따룸강 상류 (Upper Citarum River) 지역은 홍수발생시 인명 및 재산피해의 위험에 여전히 노출되어 있어 신속하고 정확한 홍수예경보의 실시를 통해 피해를 경감시키는 노력이 지속적으로 필요한 실정이다. 따라서 본 연구에서는 찌따룸강 상류의 Dayeuh Kolot 지점을 목표관측소로 하고, 강우관측소 4개소와 수위관측소 1개소의 10분 단위 수문자료를 수집하여 인공지능 기반의 하천홍수위예측모형을 개발하였다. 6개 관측소의 2017년 1월부터 2021년 1월까지의 10분 단위 수문관측자료를 활용하여 선행예보시간 0.5, 1, 2, 3, 4, 5, 6시간에 대해서 학습, 검증, 시험을 수행하였으며 인공지능알고리즘으로는 LSTM을 적용하였다. 연구결과 모든 선행예보시간에 대해 모형적합도 및 오차에서 좋은 결과를 나타냈으며, 학습자료 구축조건에 따른 예측정확도를 검토한 결과 참조관측소가 적은 경우에도 모든 관측소를 활용하는 경우와 유사하게 예측정확도를 확보하는 것으로 나타나 효율적인 인공지능 기반 모형 구축에 활용될 수 있을 것으로 기대된다.