• Title/Summary/Keyword: Chemical plant construction workers

Search Result 3, Processing Time 0.017 seconds

Effect of Tool Box Meeting of Plant Construction Workers on Disaster Prevention Behavior for Chemical Accident Prevention (화학 사고 예방을 위한 Plant 건설 종사자의 Tool Box Meeting이 재해예방행동에 미치는 영향)

  • Il-Hwan Oh;Sang-Gil Kim;Gyu-Sun Cho
    • Industry Promotion Research
    • /
    • v.8 no.4
    • /
    • pp.47-60
    • /
    • 2023
  • The purpose of this study is to examine the causal relationship between self-efficacy and safety consciousness of health belief factors and how they affect the disaster prevention behavior of construction workers using TBM. To this end, a research model is presented that applies the main variables of the Health Belief Theory, a social psychological health behavior change model developed to predict and explain health-related behaviors. To empirically verify the research model of this study, a survey was conducted among construction workers who have experience in using TBMs for chemical plant construction. The results showed that, first, the perceived severity of construction workers utilizing chemical plant construction has a significant effect on self-efficacy and safety consciousness; second, the perceived probability of construction workers utilizing chemical plant construction has a significant effect on self-efficacy and safety consciousness. Third, the perceived obstacles of construction workers utilizing chemical plant construction have a significant effect on self-efficacy and safety consciousness. Fourth, the perceived benefits of construction workers utilizing chemical plant construction were found to have a significant effect on self-efficacy and safety awareness. The purpose of this study is to reduce critical accidents through disaster prevention behavior of chemical plant construction workers through TBM.

A Study on the Investigation of Special Safety Health Training Course and the Countermeasure in Construction Industry (건설업에서 특별안전보건교육의 분석 및 대책 연구)

  • Kim, Seung-Han;Bang, Myung-Seok
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.25-38
    • /
    • 2013
  • In this paper, we survey and analyze the characteristics of the special health and safety education in the construction industry, and provides a few solutions. In particular, the implementation of special safety and health education conducted a study to target the construction site of heavy chemical plant many domestic. If you look at the results of research and analysis, problems of special health and safety education that are currently being conducted in many cases, the proportion of respondents who do not know the special safety and health education is very high, workers of the scene, this education it is possible to know that the proportion of respondents answered to have the experience that are submitted to the work while not subject to are operated poorly in the field of special health and safety education high. Finally, improve the quality of the most important education has to be done on a priority basis that fixing the safety education system systematically in line with the actual situation in the field and the use of specialized external agency.

  • PDF

The Research of Layout Optimization for LNG Liquefaction Plant to Save the Capital Expenditures (LNG 액화 플랜트 배치 최적화를 통한 투자비 절감에 관한 연구)

  • Yang, Jin Seok;Lee, Chang Jun
    • Korean Chemical Engineering Research
    • /
    • v.57 no.1
    • /
    • pp.51-57
    • /
    • 2019
  • A plant layout problem has a large impact on the overall construction cost of a plant. When determining a plant layout, various constraints associating with safety, environment, sufficient maintenance area, passages for workers, etc have to be considered together. In general plant layout problems, the main goal is to minimize the length of piping connecting equipments as satisfying various constraints. Since the process may suffer from the heat and friction loss, the piping length between equipments should be shorter. This problem can be represented by the mathematical formulation and the optimal solutions can be investigated by an optimization solver. General researches have overlooked many constraints such as maintenance spaces and safety distances between equipments. And, previous researches have tested benchmark processes. What the lack of general researches is that there is no realistic comparison. In this study, the plant layout of a real industrial C3MR (Propane precooling Mixed Refrigerant) process is studied. A MILP (Mixed Integer Linear Programming) including various constraints is developed. To avoid the violation of constraints, penalty functions are introduced. However, conventional optimization solvers handling the derivatives of an objective functions can not solve this problem due to the complexities of equations. Therefore, the PSO (Particle Swarm Optimization), which investigate an optimal solutions without differential equations, is selected to solve this problem. The results show that a proposed method contributes to saving the capital expenditures.