• Title/Summary/Keyword: Chart analysis

Search Result 924, Processing Time 0.023 seconds

The Effect of Biorhythm to Work Performance (생체(生體)리듬이 작업성과(作業成果)에 미치는 영향(影響))

  • Park, Eun-Hui;Lee, Sang-Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.5 no.1
    • /
    • pp.43-48
    • /
    • 1986
  • This study aims to investigate the effect of biorhythm to work performance. In order to do this, the data are collected from the manufacturing factory which produce a sportware, and the statistical test are made to testify the relationship between the number of defective items and the biorhythm chart of the workers. The number of defective items which made in the peak day, usual day, and critical day on the worker's biorythm chart are compared with each other, and the statistical test are made to see if there are difference between them, and the correlation analysis are made to see if there is any correlation between the work performance and the biorhythm chart. The result of the statistical test shows that the biorythm of the worker gives an effect to his work performance with a correlation.

  • PDF

A Case Study of Computer Application for Work Study and Standard Time Data in Mid-Level Factory having Working Circumstances of Multi-Item and Multi Process Type -Mainly Focused on the Case of Man-Machine Chart- (다품종 및 다공정 환경 중소기업의 현장직 사원에 대한 작업분석 및 표준설정을 위한 Computer Application 사례연구 -M/M Chart Case를 중심으로-)

  • Yoo, Wang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.2
    • /
    • pp.127-142
    • /
    • 1994
  • In these days, the PCs are widely used in the mid-level factory. But they have low-effectiveness for using them. The main reason should be the lack of useful and practical software in the market. This Case study aimed at the support of the software using DB Language to get M/M chart for aquiring work study and standard time data in the mid-level factory having multi-item and multi-process type. CVA (Chronocycle Video Analysis) is applied to get basic standard time data and working list. Standard time, Sequence of working and allowance time or rate for man and machine will be readily obtained through the menu when the software executing. Detailed program list is systematically shown in Appendix.

  • PDF

An Accelerated Test Acceptance Control Chart for Process Quality Assurance (공정보증을 위한 가속시험 합격판정 관리도)

  • Kim Jong Gurl
    • Journal of the Korea Safety Management & Science
    • /
    • v.1 no.1
    • /
    • pp.123-134
    • /
    • 1999
  • There are several models for process quality assurance by quality system (ISO 9000), process capability analysis, acceptance control chart and so on. When a high level process capability has been achieved, it takes a long time to monitor the process shift, so it is sometimes necessary to develop a quicker monitoring system. To achieve a quicker quality assurance model for high-reliability process, this paper presents a model for process quality assurance when the fraction nonconforming is very small. We design an acceptance control chart based on variable quality characteristic and time-censored accelerated testing. The distribution of the characteristics is assumed to be normal or lognormal with a location parameter of the distribution that is a linear function of a stress. The design parameters are sample size, control limits and sample proportions allocated to low stress. These paramaters are obtained under minimization of the relative variance of the MLE of location parameter subject to APL and RPL constraints.

  • PDF

Research Results and Trends Analysis on Process Control Charts for Non-normal Process (비정규 공정을 위한 공정관리도의 연구동향 분석)

  • Kim, Jong-Gurl;Kim, Chang-Su;Um, Sang-Joon;Kim, Hyung-Man;Choi, Seong-Won;Jeong, Dong-Gu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.547-556
    • /
    • 2013
  • Control chart is most widely used in SPC(Statistical Process Control), Recently it is a critical issue that the standard control chart is not suitable to non-normal process with very small percent defective. Especially, this problem causes serious errors in the reliability procurement, such as semiconductor, high-precision machining and chemical process etc. Procuring process control technique for non-normal process with very small percent defective and perturbation is becoming urgent. Control chart technique in non-normal distribution become very important issue. In this paper, we investigate on research trend of control charts under non-normal distribution.

  • PDF

An Economic Design of the EWMA Control Charts with Variable Sampling Interval (VSI EWIMA 관리도의 경제적 설계)

  • 송서일;정혜진
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.4
    • /
    • pp.1-14
    • /
    • 2002
  • Traditional SPC techniques are looking out variation of process by fixed sampling interval and fixed sample size about every hour, the process of in-control or out-of-control couldn't be detected actually when the sample points are plotted near control limits, and it takes no notice of expense concerned with such sample points. In this paper, to overcome that, consider VSI(variable sampling interval) EWMA control charts which VSI method is applied. The VSI control charts use a short sampling internal if previous sample points are plotted near control limits, then the process has high probability of out-of-control. But it uses a long sampling interval if they are plotted near centerline of the control chart, since process has high possibility of in-control. And then a comparison and analysis between FSI(fixed sampling interval) and VSI EWMA in the statistical aspect and economic aspect is studied. Finally, we show that VSI EWMA control chart is more efficient than FSI EWMA control chart in the both aspects.

Analysis of Cone Penetration Data Using Fuzzy C-means Clustering (Fuzzy C-means 클러스터링 기법을 이용한 콘 관입 데이터의 해석)

  • 우철웅;장병욱;원정윤
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.3
    • /
    • pp.73-83
    • /
    • 2003
  • Methods of fuzzy C-means have been used to characterize geotechnical information from static cone penetration data. As contrary with traditional classification methods such as Robertson classification chart, the FCM expresses classes not conclusiveness but fuzzy. The results show that the FCM is useful to characterize ground information that can not be easily found by using normal classification chart. But optimal number of classes may not be easily defined. So, the optimal number of classes should be determined considering not only technical measures but engineering aspects.

Analysis on ECDIS Standards and Implementation (ECDIS 표준 및 요구사항 분석과 구현)

  • 박종민
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 1998.05a
    • /
    • pp.359-364
    • /
    • 1998
  • 최근 해상에서의 물류 증가 및 그에 따른 사고의 증가로 인한 인적, 물적 그리고 이로 인한 환경 오염과 이차적 피해가 늘어남에 따라 선박 사고 예방에 대한 관심이 고조되고 있으며 컴퓨터 및 전자 장비를 활용한 항해 장비의 개발이 가속화되고 있다. 그 일환으로 선박 안전 항해 장비인 Electronic Chart Display & Information System(ECDIS) 및 ECDIS의 기본 운용 데이터인 Electronic Navigational Chart(ENC)의 표준과 그에 따르는 규격이 국제 해사기구(IHO) 및 국제 해상 기구(IMO)에서 제정, 공표하였고 이미 일부 선진국에서는 ENC를 구축하고 ECDIS를 개발하여 운영하고 있다. 본 논문에서는 ECDIS 성능 표준 및 요구 사항을 분석하고 이를 토대로 한 실제 구현 결과를 소개한다.

  • PDF

Formal Specification and Verification of Real Time System using SyncCharts (SyncCharts를 이용한 실시간 시스템의 정형 명세와 검증)

  • 김성재;최진영
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.10c
    • /
    • pp.415-417
    • /
    • 2002
  • 실시간 시스템은 신뢰성이 중요하다. 특히 고안전성 시스템 (Safety-Critical System)은 안전과 직결되므로 높은 신뢰도가 요구된다. 본 논문에서는 Reactive System 의 모델링 및 검증을 위해 개발된 정형 검증 언어인 SyncCharts를 이용한 실시간 시스템의 스케줄가능성 분석(Schedulability Analysis)을 통해 시스템에 대한 요구조건의 만족여부와 태스크들의 수행가능성을 검증하는 방법을 제시한다.

  • PDF

A Relation between Anchor Unbonded Length, Anchor Loads, and Wall Deflection in Tieback Anchored Wall (타이백 억지토류벽에서 앵커 자유장 및 앵커하중의 크기와 벽체변위와의 상관성)

  • 임유진
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.6
    • /
    • pp.187-200
    • /
    • 1999
  • An extensive investigation is performed to analyze the behavior of tieback anchored wall. Finite element method is used and several case histories are collected to investigate the relationship of wall deflection, anchor unbonded length, and anchor load. The finite element method can calculate wall deflection with changing the anchor unbonded length and the anchor load. Wall deflection normalized by excavation height can be related to anchor location so that it may produce a zone chart. It is found that a different chart showing the relation of the wall deflection, the anchor load, and anchor unbonded length can be constructed. It is necessary to collect more case histories considering soil conditions and to perform FE analysis extensively with changing bonded length to extend the capability of this relation chart into practice.

  • PDF

Development of Design Chart for Investigating an Additional Rail Stress and Displacement on CWR(II) - Design Chart for Railway Bridge of Conventional Line (장대레일 부가축력 및 변위 검토를 위한 설계차트 개발(II) - 일반철도 교량 설계차트)

  • Choi, Il-Yoon;Lim, Yun-Sik;Yang, Sin-Chu;Choi, Jin-Yu
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.574-581
    • /
    • 2009
  • Displacement of the bridge and additional rail stress due to interaction between track and bridge should be limited to the design criteria. Interaction analysis was conducted to investigate the displacement and additional rail stress on CWR in railway bridge of conventional line. Particularly, various parameters affecting interaction phenomena were taken into account in the analysis to enhance an applicability. These parameters included configuration of structure, stiffness of deck and support, steel/concrete bridge, ballast/concrete track and FM/MFM type etc. The results were presented in the form of the design chart which could be useful in preliminary design of the bridge.